SMM7 16 Zinc ingots from stock in Shanghai

Telah Terbit: Jul 16, 2020 12:03 (GMT+8)
SMM July 16: futures market zinc prices shock down, downstream on-demand procurement, market trading is still good, between trade low rising water hoarding desire is strong, spot rising water upward throughout the day.

SMM, July 16:

The mainstream transaction of zinc in Shanghai is 17775murl 17915 yuan / ton, Shuangyan 17930 yuan / ton, and imported zinc 17730,17880 yuan / ton. Zinc in Shanghai is generally quoted for 850095 yuan / ton of water in August; Shuangyan quoted water 100 yuan / ton in August, imported zinc in August 50 yuan / ton; Shuangyan zinc mainstream traded at 17705rel 17845 yuan / ton. The main trade of zinc in Shanghai is 17780 million yuan / ton, and the price of imported zinc is 17780 million yuan / ton, while that of Shuangyan zinc is generally quoted at 850.95 yuan / ton in August, while that of imported zinc is 50 yuan / ton in August. Shanghai Zinc 2008 contract shock operation, the first trading session of the morning market closed at 17810 yuan / ton, late trading shock consolidation, morning shippers control the delivery rhythm, the market acceptance sentiment is high, the market ordinary zinc brand transaction concentrated on the SMM net average price level to rise water 5 yuan / ton, the market followed quotation morning to 2008 contract water 80 yuan / ton, the latter part of the holder raised the water quotation to 90 yuan / ton; Entering the second period of time, the market quotation is relatively stable, the holder raised the price of rising water to 900.95 yuan / ton for the 2008 contract; the futures market zinc price fluctuated, the downstream purchased on demand, the market trading was still good, and there was a strong desire to hoard goods with low rising water between trade, and the spot rising water rose all day.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
25 Sep 2026 14:32 (GMT+8)
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
25 Sep 2026 14:32 (GMT+8)
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
25 Sep 2026 09:58 (GMT+8)
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Baca Selengkapnya
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon Metals mengumumkan telah menandatangani perjanjian definitif untuk mengakuisisi 100% deposit VMS tembaga-emas Turner di Oregon dari Gold Coast Mining. Imbalannya terdiri dari US$4,7 juta tunai, 4.778.761 saham Blue Moon senilai sekitar US$27 juta berdasarkan VWAP 20 hari, dan hingga US$7 juta dalam bentuk pencapaian tonggak yang terkait dengan perizinan eksplorasi/pengembangan bawah tanah, izin penambangan, dan produksi komersial. Penutupan transaksi diharapkan pada November 2026, dengan syarat persetujuan TSX Venture Exchange dan kondisi-kondisi lazim. Turner adalah deposit VMS tipe Siprus yang pernah berproduksi dan mengandung tembaga, emas, seng, perak, dan kobalt. Estimasi historis tahun 2010 melaporkan 2,447 juta ton pendek material Terindikasi dengan kadar 2,65% seng dan 2,084 juta ton pendek material Terestimasi dengan kadar 2,78% seng. Perusahaan memperkirakan perizinan untuk pengeboran eksplorasi dan pengembangan bawah tanah akan memakan waktu 12–18 bulan.
25 Sep 2026 09:58 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
24 Sep 2026 17:22 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Baca Selengkapnya
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
[Permintaan penggunaan akhir buruk, tingkat operasi seng oksida menurun] Dari perspektif kinerja permintaan penggunaan akhir, di sektor seng oksida kelas karet, pesanan perusahaan ban umumnya lemah, dan pembelian seng oksida tetap dilakukan secara tepat waktu; pesanan di bidang desulfurisasi berkinerja buruk, dengan permintaan tetap lesu...
24 Sep 2026 17:22 (GMT+8)