Zhengzhou issued "Zhengzhou 2020 to encourage carbon production capacity to withdraw from the fund subsidy scheme"

Telah Terbit: Jul 15, 2020 15:49
SMM7 March 14, Zhengzhou recently eliminated backward production capacity work leading group office issued "Zhengzhou 2020 to encourage carbon production capacity to withdraw from the fund subsidy program." Encourage inefficient carbon production capacity to close and exit ahead of time, and promote the optimization and upgrading of the industrial structure.

SMM Network News:

In April 2020, the Henan government established a market-oriented, legalized and normalized work promotion mechanism in order to use comprehensive standards to promote the withdrawal of backward production capacity in accordance with the law. With the consent of the provincial government, the Office of the Provincial leading Group for phasing out backward production capacity, in conjunction with relevant functional departments, in accordance with the guidance Catalog of Industrial structure Adjustment (2018) of the National Development and Reform Commission and the Circular of the General Office of Henan Provincial people's Government on Printing and issuing the work Plan of Henan Province to promote Industrial structure Adjustment and win the War on pollution Prevention and Control (Henan political Affairs Office (2019) No. 73), The revision has formed the "Comprehensive Standard system for the elimination of backward production capacity in Henan Province" (later known as the 2020 standard system). It is clearly proposed in the standard system that "eliminate independent carbon enterprises that do not meet environmental protection and safety requirements. Withdraw from independent aluminum carbon enterprises of less than 100000 tons per year". In order to try out this plan, the office of Zhengzhou leading Group on the elimination of backward production capacity recently issued the "Zhengzhou 2020 encouragement carbon production capacity withdrawal fund subsidy program". Encourage inefficient carbon production capacity to close and exit ahead of time, and promote the optimization and upgrading of the industrial structure. The main contents include the following points:

(1) the total subsidy for the withdrawal of carbon production capacity is about 50 million yuan, which comes from the special funds allocated by the central finance to the city for air pollution prevention and control projects.

(2) carbon enterprises that are not in the national or provincial phase-out catalogue that are closed and withdrawn before the end of October 2020 are not included in the scope of subsidies for those enterprises that have been included in the government's planning for demolition and enjoy the relevant capacity withdrawal policies; In terms of subsidy standards, the three processes of calcination, molding and roasting will be given a one-time subsidy according to the standard of 250000 yuan / 150000 yuan / 400000 yuan per 10,000 tons of production capacity, and the maximum subsidy for a single enterprise will not exceed 5 million yuan.

(3) to complete the inspection and audit of carbon enterprises to be withdrawn by the end of July 2020; before August 15, 2020, organizational experts such as the Municipal Bureau of Industry and Information Technology will conduct on-site verification of the enterprises to be reported and withdrawn; and complete the demolition and acceptance before October 30, and submit it to the Municipal Bureau of Industry and Information Technology for the record.

SMM comments:

Henan has always been a province with large production capacity of pre-baked anodes and electrolytic aluminum in China. in recent years, with the increasingly stringent requirements of the local government on environmental protection, the electrolytic aluminum industry in the province has basically completed the corresponding technology upgrading and production capacity transfer. at present, the production capacity of pre-baked anode devices in Henan Province is 4.05 million tons, accounting for about 17% of the total domestic production capacity, and 1.79 million tons within the jurisdiction of Zhengzhou. The total production capacity of small-scale pre-baked anode devices with a capacity of 100000 tons or less in Zhengzhou is about 330000 tons. At present, the total domestic production capacity of pre-baked anodes is about 26 million tons. In June, the domestic output of pre-baked anodes was about 1.6 million tons, while the domestic output of electrolytic aluminum in June was 3.006 million tons. Theoretically, without considering import and export, the supply surplus is about 150000 tons. In terms of production and domestic supply, The direct impact of the carbon withdrawal subsidy scheme in Zhengzhou is small, but the demonstration significance is significant.

Market

Area

Enterprise name (including stopped devices)

Plant production capacity

Zhengzhou

Gong Yi

Yinshan metallurgy

6

Zhengzhou

Gong Yi

Zhongshan carbon

6

Zhengzhou

Gong Yi

Henan Jinju Industrial Co., Ltd.

28

Zhengzhou

Dengfeng

Henan Songyue carbon

25

Zhengzhou

Xingyang

Henan Yuhui carbon

12

Zhengzhou

Gong Yi

Henan bamboo forest Saxin carbon

28

Zhengzhou

Gong Yi

Zhengzhou Fenghua carbon

15

Zhengzhou

Take to the streets

Zhengzhou Great Wall Aluminum Industry carbon

5

Zhengzhou

Dengfeng

Zhengzhou Songying carbon

6

Zhengzhou

Zhengzhou

Boda electric porcelain

5

Zhengzhou

Zhengzhou

Chinalco Henan

10

Zhengzhou

Xingyang

Xinyu carbon

15

Zhengzhou

Gong Yi

Henan Zhongfu carbon

18

Xinxiang

Xinxiang

Xinxiang Chaoli carbon

5

Shangqiu

Shangqiu

Henan Shenhuo

12

Sanmenxia

Pooling pool

Sanmenxia Jinlong carbon

15

Sanmenxia

Shanzhou

Sanmenxia Shentong carbon

15

Luoyang

Luoyang

Longquan Tiansong

36

Luoyang

Luoyang

Wanji carbon

33

Jiaozuo

Wen County

Henan Dongfang

11

Jiaozuo

Wen County

Henan Huihao industry

10

Jiaozuo

Fraternity

Hengyu carbon products

10

Jiaozuo

Jiaozuo

Jiaozuo Dongxing carbon

15

Jiaozuo

Jiaozuo

Yingli economy and trade in Jiaozuo

15

Jiaozuo

Qinyang

Jiaozuo Wandu

15

Jiaozuo

Qinyang

Carbon of the Yellow River in Qinyang City

12

Jiaozuo

Qinyang

Qinyang carbon

12

Anyang

Linzhou

Linzhou Yiren industry

10

Total

4.05 million tons

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Produksi Baterai Litium Tiongkok Diprediksi Naik 9% pada September, Didorong Permintaan Penyimpanan Energi Global
15 menit yang lalu
Produksi Baterai Litium Tiongkok Diprediksi Naik 9% pada September, Didorong Permintaan Penyimpanan Energi Global
Baca Selengkapnya
Produksi Baterai Litium Tiongkok Diprediksi Naik 9% pada September, Didorong Permintaan Penyimpanan Energi Global
Produksi Baterai Litium Tiongkok Diprediksi Naik 9% pada September, Didorong Permintaan Penyimpanan Energi Global
Menurut data survei bulanan dari berbagai rantai industri, jadwal produksi baterai litium China pada September diperkirakan melampaui 330 GWh, naik sekitar 9% dibandingkan bulan sebelumnya. Sel penyimpanan energi menyumbang sekitar 130 GWh, hampir 40% dari total. Pertumbuhan penyimpanan energi terutama berasal dari proyek skala besar di luar negeri, dengan beberapa stasiun penyimpanan energi di Timur Tengah, Eropa, dan AS yang bergegas terhubung ke jaringan listrik sebelum akhir tahun. Pelanggan luar negeri secara terpusat membeli sel penyimpanan energi berkapasitas besar 314Ah ke atas, dengan lini produksi pabrikan baterai terkemuka yang sudah penuh dipesan hingga pertengahan Oktober.
15 menit yang lalu
Penjualan NEV September 2026 Melonjak 45,6% YoY, Pangsa Pasar Mendekati 50%
18 menit yang lalu
Penjualan NEV September 2026 Melonjak 45,6% YoY, Pangsa Pasar Mendekati 50%
Baca Selengkapnya
Penjualan NEV September 2026 Melonjak 45,6% YoY, Pangsa Pasar Mendekati 50%
Penjualan NEV September 2026 Melonjak 45,6% YoY, Pangsa Pasar Mendekati 50%
Data CAAM menunjukkan produksi dan penjualan NEV September 2026 masing-masing mencapai 1,617 juta dan 1,604 juta unit, naik 42,7% dan 45,6% YoY. Pangsa NEV terhadap total penjualan kendaraan baru mencapai 49,7%. Produksi/penjualan NEV kumulatif Jan-Sep mencapai sekitar 12,6 juta unit, dengan pangsa pasar mendekati setengah. Ekspor NEV September sebanyak 222.000 unit, lebih dari dua kali lipat YoY. Data CPCA menunjukkan penjualan ritel mobil penumpang NEV domestik September sekitar 1,296 juta unit, naik 15,5% YoY, dengan penetrasi bulanan mencapai 57,8%, rekor tertinggi baru.
18 menit yang lalu
Proyek Aluminium Ruijin Senilai $135 Juta Hampir Rampung, Siap Diluncurkan November
20 menit yang lalu
Proyek Aluminium Ruijin Senilai $135 Juta Hampir Rampung, Siap Diluncurkan November
Baca Selengkapnya
Proyek Aluminium Ruijin Senilai $135 Juta Hampir Rampung, Siap Diluncurkan November
Proyek Aluminium Ruijin Senilai $135 Juta Hampir Rampung, Siap Diluncurkan November
Proyek aluminium plate/strip/foil Ruijin New Materials Technology Co., Ltd. berkapasitas 150.000 ton per tahun, yang memperoleh lahan pada bulan April dan memulai konstruksi pada akhir April tahun ini, telah menyelesaikan bengkel No. 1. Pemasangan peralatan internal berada pada tahap akhir. Enam tungku penahan dan enam tungku peleburan telah dipasang, dan pemasangan mesin penggilingan sedang berlangsung. Pembakaran tungku direncanakan pada akhir September, produksi uji coba sekitar 15 Oktober, dengan commissioning formal diharapkan pada bulan November. Total investasi sekitar RMB 900 juta, dengan RMB 300 juta direncanakan untuk tahun ini.
20 menit yang lalu