Copper miners may go on strike after another labor dispute in Chile

Telah Terbit: Jul 10, 2020 11:11 (GMT+8)
Sumber: SMM compilation
[copper miners may strike again in Chile] Workers at two Chilean copper mines are voting on whether to accept final wage agreements or strikes, and the copper market, already plagued by the epidemic, is now at increased risk. The results of the workers' vote at the Zaldivar copper mine, which is believed to be owned by Antofagasta, will be announced on Friday, and the voting results for the directors of the Centinela copper mine will be announced next Monday.

SMM7, March 10: workers at two Chilean copper mines are voting on whether to accept a final wage agreement or a strike. The copper market, which has been plagued by the epidemic, is now at increased risk.

The results of the workers' vote at the Zaldivar copper mine, which is believed to be owned by Antofagasta, will be announced on Friday, and the voting results for the directors of the Centinela copper mine will be announced next Monday.

Guillermo Esquivel, head of the union Zaldivar1, said that none of the workers' needs had been met, so the vote meant that workers refused to quote wages and went on strike.

The Zaldivar1 union represents the 652 employees of the Zaldivar copper mine, which has a total of 900 employees.

Chilean labor disputes superimposed supply disturbances have provided the impetus for the rise in copper prices.

However, before the strike, Chilean labour law allowed the government to mediate.

Celso Pardo, chairman of the Centinela's governing union, expressed strong opposition to the wages offered by the miners, arguing that the miners' only interest is in producing at low cost, without taking into account the vital interests of the workers. The union in charge of Centinela represents 396 of the mine's 2000 workers.

The Centinela mine produces 276600 tons of copper in 2019 and the Zaldivar mine produces 58100 tons of copper in 2019.

"Click to participate in the second China (Yingtan) Copper Industry Summit Forum and the 15th China International Copper Industry chain Summit"

Scan the code to sign up for the summit or apply to join the SMM industry exchange group:

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
6 jam yang lalu
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
6 jam yang lalu
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
7 jam yang lalu
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
7 jam yang lalu
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
7 jam yang lalu
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
7 jam yang lalu