[SMM Review] Infrastructure construction will provide sustainable support for steel demand.

Telah Terbit: Jul 8, 2020 15:59

SMM7: China has been speeding up the approval of infrastructure projects this year to support an economy still affected by the coronavirus pandemic, and work on most projects began in the second half of 2020, which helps stimulate steel demand.

Statistics show that from January to June, China approved 13 airport projects with a total investment of 103.96 billion yuan ($14.71 billion), equivalent to 57 per cent of the total approval in 2019. At the same time, 19 railway and urban rail transit projects have been approved, and another 12 are expected to be approved soon. The total length of these projects is 4638 km, equivalent to 77 per cent of the total length approved last year.

Construction of these projects will mainly continue from 2020 to 2025 and will require a total of 23.8 million tons of steel. It has also been increasing financial support to help speed up infrastructure construction.

China had planned to issue 3.75 trillion yuan of local government special bonds in 2020, up from 2.15 trillion yuan in 2019. From January to June, about 60 per cent of the annual quota has been issued.

Special bonds must be invested in infrastructure, not in real estate-related projects. About 64% of the special bonds issued in 2019 went into real estate, thus failing to boost infrastructure growth. The government will be stricter on the use of funds this year.

The construction peak is expected to be completed in June, but continued financial support and sufficient new approvals will ensure continued strong demand for steel in the infrastructure sector in the second half of 2020.

In addition, according to the previous SMM survey data, 45.83% of the sample enterprises said that there was a more urgent need to rush to work in the next three months. Among them, the proportion of enterprises with urgent demand in the construction industry is about 41.94%, and that of the infrastructure industry is about 52.94%. 41.67% of the terminal enterprises indicate that there are projects that need to be started in the next three months. Among them, infrastructure enterprises with new construction projects account for 47.06% of the total sample of infrastructure enterprises.

Steel market participants expect China's infrastructure investment to grow by about 10 per cent by 2020 from minus 6.3 per cent from January to May. As a result, steel demand for infrastructure construction is likely to grow or even greater in the second half of the year than in the second quarter of 2020.

Scan the QR code and join the SMM metal communication group.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
US-Iran Negotiations Advance, Easing Geopolitical Risks, Copper Prices Drift Higher and LME Copper Gains over 1%[SMM Copper Morning Brief]
6 menit yang lalu
US-Iran Negotiations Advance, Easing Geopolitical Risks, Copper Prices Drift Higher and LME Copper Gains over 1%[SMM Copper Morning Brief]
Baca Selengkapnya
US-Iran Negotiations Advance, Easing Geopolitical Risks, Copper Prices Drift Higher and LME Copper Gains over 1%[SMM Copper Morning Brief]
US-Iran Negotiations Advance, Easing Geopolitical Risks, Copper Prices Drift Higher and LME Copper Gains over 1%[SMM Copper Morning Brief]
SMM Morning Meeting Minutes: Overnight, LME copper opened at $13,746/mt, consolidated at highs in early trading, rose to $13,781.5/mt before its center moved lower, then dipped to a low of $13,704/mt, and finally moved sideways to close at $13,759.5/mt, up 1.09%. Trading volume reached 16,000 lots, open interest at 244,000 lots, down 1,039 lots from the previous trading day, reflecting bearish position reduction. Overnight, the most-traded SHFE copper 2609 contract opened at 105,500 yuan/mt, rose to a high of 105,640 yuan/mt in early trading, before its center shifted lower to touch a low of 105,060 yuan/mt. Its center then moved sideways, eventually closing at 105,280 yuan/mt, down 0.31%. Trading volume was 34,000 lots, open interest at 206,000 lots, down 26.83 million lots from the previous trading day, also reflecting bearish position reduction.
6 menit yang lalu
Situasi di Timur Tengah terus mereda, dan selera risiko kembali meningkat, mendorong harga tembaga [Komentar Pagi Tembaga SMM]
29 menit yang lalu
Situasi di Timur Tengah terus mereda, dan selera risiko kembali meningkat, mendorong harga tembaga [Komentar Pagi Tembaga SMM]
Baca Selengkapnya
Situasi di Timur Tengah terus mereda, dan selera risiko kembali meningkat, mendorong harga tembaga [Komentar Pagi Tembaga SMM]
Situasi di Timur Tengah terus mereda, dan selera risiko kembali meningkat, mendorong harga tembaga [Komentar Pagi Tembaga SMM]
29 menit yang lalu
Ekspansi Pertambangan Zambia Menghadapi Tantangan Infrastruktur di Tengah Peningkatan Investasi
8 jam yang lalu
Ekspansi Pertambangan Zambia Menghadapi Tantangan Infrastruktur di Tengah Peningkatan Investasi
Baca Selengkapnya
Ekspansi Pertambangan Zambia Menghadapi Tantangan Infrastruktur di Tengah Peningkatan Investasi
Ekspansi Pertambangan Zambia Menghadapi Tantangan Infrastruktur di Tengah Peningkatan Investasi
Sektor pertambangan Zambia tengah memasuki fase ekspansi signifikan seiring produsen internasional besar meningkatkan belanja modal untuk menyelaraskan dengan ambisi pemerintah meningkatkan produksi tembaga nasional menuju 1 juta metrik ton per tahun. Namun, menurut laporan media asing, analis industri memperingatkan bahwa target produksi jangka panjang negara tersebut sangat bergantung pada apakah infrastruktur pendukung berupa jaringan listrik dan transportasi dapat berkembang seiring dengan kapasitas tambang. Kendala operasional utama tetaplah ketersediaan listrik di seluruh Copperbelt. Dengan lebih dari 83% basis listrik nasional Zambia sebesar 3.985 MW bergantung pada aset tenaga air seperti Kafue Gorge dan Kariba North, penurunan permukaan air akibat kekeringan baru-baru ini telah mengungkap kerentanan energi yang parah di sektor pertambangan. Fluktuasi jaringan listrik yang tidak terjadwal dan pemadaman bergilir darurat menimbulkan risiko operasional akut bagi operasi pemrosesan yang intensif energi, di mana gangguan listrik menyebabkan guncangan termal parah pada lapisan bata tungku peleburan tembaga, mengakibatkan kerusakan peralatan fisik dan penghentian operasional yang berkepanjangan. Untuk memitigasi gangguan ini, perusahaan pertambangan semakin banyak berinvestasi dalam proyek energi terbarukan di luar jaringan, kapasitas PLTS skala utilitas, dan impor listrik regional. Di luar energi, pertumbuhan produksi yang berkelanjutan akan memerlukan investasi modal dalam jaringan logistik kereta api, infrastruktur air, dan kapasitas teknis pemasok lokal.
8 jam yang lalu
[SMM Review] Infrastructure construction will provide sustainable support for steel demand. - Shanghai Metals Market (SMM)