Macro Roundup (Jul 7)

Telah Terbit: Jul 7, 2020 08:55
Wall Street stocks rose sharply on Monday, as bullish sentiment in China rippled across global markets to drive investors’ optimism for a recovery from the coronavirus pandemic.

SHANGHAI, Jul 7 (SMM) – This is a roundup of global macroeconomic news last night and what is expected today.

 

Wall Street stocks rose sharply on Monday, as bullish sentiment in China rippled across global markets to drive investors’ optimism for a recovery from the coronavirus pandemic.

 

The Dow jumping more than 450 points, despite a continuous rise in coronavirus cases across the US. The S&P 500 gained 1.5% on Monday for its fifth straight positive session, while the Nasdaq rose 2.2% to hit an all-time high.

 

An index of blue-chip Chinese shares soared to its highest in five years as traders bet on a revival in China, pushing the offshore yuan up 0.75% to its highest level since March 18 and on track for its best daily performance since Dec. 12.

 

Growing expectations of a strong Chinese economic rebound, combined with glimmers of good news in economic data triggered a broad-based risk-on move and weakened the US dollar. Against a basket of six rival currencies, the greenback hit its lowest since June 24 at 96.500, before recovering some ground.

 

Oil prices rose on Monday, while nonferrous metals climbed across the board. LME nickel surged 3.3% to lead the gains across the nonferrous complex, copper jumped 2.1%, aluminium advanced 1.4%, tin rose 1.2%, zinc increased by 0.8% and lead gained 0.6%.

 

On the SHFE, the six metals opened broadly higher in overnight trading. Nickel added 1.6% to the best performer, tin rose 1.1%, copper climbed 0.9%, zinc and aluminium crept up about 0.6%, while lead reversed earlier gains to close flat.

 

Data from the Institute for Supply Management published on Monday showed a surprise expansion in the US services sector. The firm’s nonmanufacturing index rose to 57.1 in June, topping a Dow Jones estimate of 50.1.

 

German industrial goods production rose by 10.4% in May, rebounding from their biggest drop since records began in 1991. Consumers in the eurozone returned en masse to shops in May as lockdowns were eased in the bloc, and investor morale in the area improved for a third month running in July though a dip in expectations suggests the recovery from the impact of the coronavirus pandemic could soon peter out.

 

Sales in the 19 countries sharing the eurozone rose by 17.8% in May from April, Eurostat said, in the steepest increase since eurozone records for retail sales began in 1999.

 

Sentix’s index for the eurozone rose to -18.2 from -24.8 in June. That compared with the forecast for a reading of -10.9.

 

The US Labor Department will release the May figure for job openings on Tuesday at 10:00 a.m. ET. Economists polled by Dow Jones expect the total vacancies to drop to 4.5 million in May from 5.05 million in April, which was the lowest total since December 2014.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
10 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
10 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
14 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
14 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
14 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
14 jam yang lalu
Macro Roundup (Jul 7) - Shanghai Metals Market (SMM)