[SMM Analysis] the LME copper spot discount has reproduced the back structure for more than a year. Who is the pushing hand?

Telah Terbit: Jul 6, 2020 17:35

SMM7 March 6: July 3 LME0-3 structure from contango to back, is currently 6.50 US dollars / ton; since the end of April 2019, LME0-3 Copper has maintained contango structure for a long time, while from late May this year, contango structure gradually narrowed, mainly due to the impact of the epidemic, supply-side disturbance intensified, while consumption still has a strong support.

With the acceleration of overseas economic restart process, the prospect of copper consumption recovery is promising, and the continued decline of LME copper inventory also confirms the logic of consumption repair. Overseas depots have been more pronounced since mid-May, with LME inventories recording 1.9785 billion tons as of today, down 8525 tons from the previous trading day. At the same time of inventory reduction, the proportion of LME cancellation warehouse receipts remains at a high level of 46 per cent, leading the market to strengthen expectations of a continuous decline in inventory in the later period, prompting the transformation of LME from contango to back structure, and the back structure has the possibility of further expansion.

In the short term, LME spot prices are expected to remain strong, mainly because supply-side disturbances have not slowed down. Codelco, Chile's national copper company, said on Saturday that it had temporarily suspended the expansion of its El Teniente mine in order to stop the spread of the epidemic. Earlier, Chile's state copper announced the temporary closure of the smelter at the Chuquicamata mine, but continued its mine operations across the country and reduced its operating equipment. BHP Billiton also announced a significant reduction in the operation of the Cerro Colorado copper mine in Chile.

According to SMM, the CSPT team held the latest third-quarter Floor price meeting online on Friday and confirmed that the third-quarter TC/RC floor price was 53 U.S. dollars / ton and 5.3 cents / pound, and the SMM June copper concentrate index was 51.71 U.S. dollars / ton. Due to the great uncertainty of epidemic factors in the second quarter, the floor price was not determined at the quarterly meeting of the group, while the floor price determined in the third quarter was much lower than the US $67 / ton in the first quarter, objectively reflecting the tightening trend in the supply of imported copper concentrates. at the same time, the raw material supply situation in the second half of the year is still very grim.

As of Friday, the SMM copper concentrate index (weekly) was at $51.37 / tonne, down 12 cents / tonne from June 19. Last week, the copper concentrate market was relatively light, SMM learned that a small number of spot transactions in the 50 low, trading range has not changed significantly. However, with the gradual tension of the epidemic situation in Chile, the seller's bearish sentiment has increased, and the offer still has a downward trend in the second half of the week.

The overseas back structure further widened the import loss, leading to a further decline in the Yangshan copper premium. The decline of inventory in the bonded area slows down, and there are opportunities for further growth. According to SMM research, copper inventories in the Shanghai Free Trade Zone decreased by 1000 tons to 208500 tons month-on-month on Friday. Inventories fell in the second week, but the decline slowed significantly. The upsurge of copper futures suppressed domestic consumption, and the price spread of fine waste continued to expand to more than 2000 yuan / ton, further squeezing out the demand for refined copper, superimposed by the influx of imported copper into China last week, and the inventory of the three places increased significantly.

"Click apply to view SMM metal industry chain data

"Click to participate in the second China (Yingtan) Copper Industry Summit Forum and the 15th China International Copper Industry chain Summit"

Scan the code to sign up for the summit or apply to join the SMM industry exchange group:

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
22 jam yang lalu
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Baca Selengkapnya
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Pada 12 September pukul 9:58, tungku peleburan inti sistem pirometalurgi di proyek pemulihan multi-logam Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd. berhasil dinyalakan, secara resmi memasuki tahap pengeringan tungku dan menandai langkah kunci menuju commissioning dan produksi seluruh lini. Informasi publik menunjukkan bahwa proyek peningkatan teknologi pemulihan komprehensif bijih emas-perak polimetalik kompleks, relokasi, dan perluasan Yingkou Jianfa Shenghai menggunakan konsentrat tembaga sebagai bahan baku utama, dengan kapasitas terencana keseluruhan 600.000 ton/tahun katoda tembaga yang akan dibangun dalam dua fase, dengan kapasitas 300.000 ton/tahun per fase. Fase I dirancang untuk memproduksi 300.000 ton/tahun katoda tembaga dan 1,18 juta ton/tahun asam sulfat, beserta sistem pendukung untuk peleburan, konversi, pemurnian anoda, elektrolisis, benefisiasi terak, dan pemulihan logam mulia. Setelah penyalaan ini, proyek akan melaksanakan pengeringan tungku terstandarisasi dan uji coba terpadu kondisi panas di seluruh sistem untuk memverifikasi peralatan, instrumen, interlock, dan sistem kontrol otomatis. Proyek ini belum secara resmi memulai pengumpanan bahan baku dan produksi; setelah pengeringan tungku dan commissioning sistem selesai, akan dilanjutkan dengan commissioning kapasitas katoda tembaga 300.000 ton/tahun Fase I. Jika proyek berhasil mulai berproduksi, diharapkan dapat meningkatkan kapasitas peleburan tembaga di Tiongkok Utara dan semakin mendorong permintaan domestik akan bahan baku konsentrat tembaga.
22 jam yang lalu
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
12 Sep 2026 01:13
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Baca Selengkapnya
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Alchemy Resources mengumumkan pada 11 September bahwa pengeboran sirkulasi balik telah dimulai di proyek Yellow Mountain dan Overflow di New South Wales, Australia, dengan hingga 15 lubang direncanakan selama kampanye eksplorasi terbaru. Di proyek Yellow Mountain yang 80% dimilikinya, pengeboran akan menguji perluasan mineralisasi tembaga-emas dan polimetalik yang telah diidentifikasi sebelumnya, serta dua target geofisika yang belum pernah dibor sebelumnya. Pengeboran sebelumnya di Yellow Mountain menghasilkan irisan sepanjang 113 meter dengan kadar setara tembaga 1,17%, terdiri dari 0,33% tembaga, 0,37 g/t emas, 24,3 g/t perak, 0,86% timbal, dan 1,23% seng. Kampanye pengeboran terbaru dirancang untuk menguji apakah sistem mineralisasi yang diketahui meluas ke area target yang baru diidentifikasi. Program ini juga akan mencakup pengeboran di proyek Overflow, di mana Alchemy menargetkan perluasan mineralisasi yang ada di sepanjang jurus dan di kedalaman. Overflow saat ini memiliki sumber daya mineral terindikasi sekitar 342.000 ons setara emas dan mengandung mineralisasi emas, perak, tembaga, timbal, dan seng. Dimulainya pengeboran memberikan uji jangka pendek terhadap skala dan kontinuitas mineralisasi di Yellow Mountain. Irisan tembaga-emas-polimetalik lebar yang dilaporkan sebelumnya menunjukkan potensi sistem mineralisasi yang cukup besar, sementara target geofisika yang baru ditetapkan memberikan potensi eksplorasi tambahan. Hasil pengeboran akan menjadi penting dalam menentukan apakah jejak mineralisasi dapat diperluas secara material.
12 Sep 2026 01:13
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
12 Sep 2026 01:10
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
Baca Selengkapnya
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
Chief Executive Officer Freeport-McMoRan Kathleen Quirk mengindikasikan bahwa perusahaan berharap dapat melanjutkan rencana perluasan tambang tembaga Bagdad di Arizona, menandakan komitmen yang lebih kuat terhadap proyek tersebut menjelang keputusan investasi formal. Berbicara di Jefferies Global Industrials Conference pada 10 September, Quirk mengatakan proyek tersebut masih memerlukan masukan dari dewan direksi Freeport, tetapi ia memperkirakan perusahaan akan melanjutkannya. Ia menggambarkan perluasan tersebut sebagai proyek konstruksi sekitar tiga tahun dan mencatat bahwa tidak ada hambatan perizinan besar yang diperkirakan. Estimasi proyek terbaru Freeport menempatkan belanja modal untuk perluasan Bagdad sekitar US$4,5 miliar, sekitar 30% di atas estimasi sebelumnya sebesar US$3,5 miliar, mencerminkan kenaikan biaya, perubahan lingkup, dan rekayasa tambahan. Proyek tersebut akan lebih dari dua kali lipat meningkatkan kapasitas konsentrator di Bagdad dan diperkirakan menambah sekitar 200–250 juta pon, atau sekitar 91.000–113.000 ton, produksi tembaga per tahun, bersama dengan tambahan 10–12 juta pon molibdenum. Bagdad saat ini memiliki umur cadangan lebih dari 80 tahun. Pengajuan regulasi Q2 2026 Freeport telah menggambarkan proyek tersebut sedang dipersiapkan untuk kemungkinan keputusan investasi pada paruh kedua 2026. Komentar terbaru ini dengan demikian merupakan sinyal yang lebih positif dari manajemen mengenai kemungkinan pengembangan, meskipun persetujuan dewan formal belum diumumkan. Keputusan untuk melanjutkan Bagdad akan menjadi salah satu investasi pertumbuhan tembaga jangka pendek Freeport yang paling signifikan di AS. Potensi penambahan lebih dari 90.000 ton tembaga per tahun akan meningkatkan output AS Freeport secara material, meskipun produksi pertama masih beberapa tahun lagi mengingat periode konstruksi yang diperkirakan. Perhatian kini akan beralih ke persetujuan dewan formal dan keputusan investasi akhir.
12 Sep 2026 01:10
[SMM Analysis] the LME copper spot discount has reproduced the back structure for more than a year. Who is the pushing hand? - Shanghai Metals Market (SMM)