[SMM Evening Review] Summary of the transaction in the original lead market on May 26th

Telah Terbit: May 26, 2020 15:54 (GMT+8)

SMM, May 26th:

The mainstream quotation for lead reduction in Jiangxi today is 12750Muth12850 yuan / ton. A refinery today quoted reduced lead (excluding tax) at 12850 yuan / ton to the factory, recycled refined lead (including tax) to SMM1# lead discount 250 yuan / ton, including tax recycled refined lead market to maintain a deep discount.

The mainstream price for lead reduction in Guangdong today is 12700 RMB12800 per ton. A refinery today reduced lead (including tax) to SMM1# lead sticker 675 yuan / ton to the factory, recycled refined lead (including tax) to SMM1# lead sticker 320 yuan / ton to leave the factory, the price fluctuated slightly than yesterday, downstream on-demand purchase.

The mainstream quotation for lead reduction in Hunan today is 12700 RMB12850 per ton. A refinery today reduced lead (excluding tax) price quoted 12850 yuan / ton to the factory, recycled refined lead (excluding tax) 13150 yuan / ton left the factory, the market turnover is light.

The mainstream quotation for lead reduction in Henan today is 12700 RMB12800 per ton. A refinery today quoted 12800 yuan / ton for reduced lead (excluding tax) and 13100 yuan / ton for recycled refined lead (excluding tax).

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Kewaspadaan pasar meningkat menjelang libur panjang; kontrak SHFE lead 2611 berkonsolidasi [Ulasan Singkat Futures Timbal]
7 jam yang lalu
Kewaspadaan pasar meningkat menjelang libur panjang; kontrak SHFE lead 2611 berkonsolidasi [Ulasan Singkat Futures Timbal]
Baca Selengkapnya
Kewaspadaan pasar meningkat menjelang libur panjang; kontrak SHFE lead 2611 berkonsolidasi [Ulasan Singkat Futures Timbal]
Kewaspadaan pasar meningkat menjelang libur panjang; kontrak SHFE lead 2611 berkonsolidasi [Ulasan Singkat Futures Timbal]
7 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (29 Sep)
9 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 29 Sep 2026.
9 jam yang lalu
【SMM Berita Kilat】Vox Setuju Mengakuisisi Royalti NSR 0,75% atas Proyek Perak-Timbal Sorby Hills senilai US$13 Juta
9 jam yang lalu
【SMM Berita Kilat】Vox Setuju Mengakuisisi Royalti NSR 0,75% atas Proyek Perak-Timbal Sorby Hills senilai US$13 Juta
Baca Selengkapnya
【SMM Berita Kilat】Vox Setuju Mengakuisisi Royalti NSR 0,75% atas Proyek Perak-Timbal Sorby Hills senilai US$13 Juta
【SMM Berita Kilat】Vox Setuju Mengakuisisi Royalti NSR 0,75% atas Proyek Perak-Timbal Sorby Hills senilai US$13 Juta
Vox Royalty mengumumkan bahwa anak perusahaannya di Australia telah menandatangani perjanjian mengikat untuk mengakuisisi royalti net smelter return efektif sebesar 0,75% atas proyek perak-timbal Sorby Hills di Australia Barat senilai US$13 juta secara tunai dari penjual swasta. Transaksi ini belum selesai dan masih tunduk pada prasyarat yang lazim serta persetujuan dari Badan Peninjau Investasi Asing Australia, dengan penyelesaian diperkirakan pada kuartal IV 2026. Sorby Hills dimiliki dan dioperasikan 100% oleh Boab Metals dan saat ini sedang dalam tahap konstruksi. ACCESS Newswire Boab saat ini menargetkan commissioning dan peningkatan produksi pada paruh pertama 2027, produksi konsentrat pertama pada paruh kedua 2027, dan produksi penuh pada kuartal IV 2027. Proyek ini direncanakan memproduksi sekitar 68.000 ton timbal dan 2,2 juta ons perak per tahun selama masa tambang awal 8,5 tahun. Program pengeboran Fase IX yang selesai pada bulan September terdiri dari 47 lubang bor sonik dan inti berlian dengan total sekitar 5.880 meter. Pengeboran konversi sumber daya menjadi cadangan telah diselesaikan di seluruh deposit B, Omega, Norton, dan Beta, sementara pengeboran lebih lanjut sedang berlangsung di target seng Keep.
9 jam yang lalu