The Tesla Berlin plant is about to break ground

Telah Terbit: May 15, 2020 11:29

SMM5 15: may 14, according to foreign media reports, electric car maker Tesla spent the first five months of 2020 developing and leveling 90 hectares of land it bought in Germany for the construction of its first European production facility. The latest developments suggest that Tesla builders are using a series of trains to transport gravel to the site, which will be used to build roads for construction vehicles.

The final phase of land preparations for the Tesla Berlin superplant has been completed and the official opening ceremony of the plant will take place soon. On 20 April, the plant's construction site included three excavators, a wood splitter and a soil separator, which will be involved in the final part of the clean-up work, such as smashing the roots accumulated during the land clearance process.

The project is expected to be completed in July 2021. In recent developments, German politicians assured Tesla that its project would proceed as planned.

"Click to sign up:" 2020 (Fifth) China International Nickel Cobalt Lithium Summit Forum "

To sign up for the Nickel Cobalt Lithium Summit or apply for entry into the SMM New Energy vehicle / Cobalt Lithium Industry Exchange Group, please scan the QR code below:

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Lelang Konsentrat Germanium di Shaoguan Ditutup di Atas RMB 27.100/kg, Berdampak pada Biaya Hilir
3 menit yang lalu
Lelang Konsentrat Germanium di Shaoguan Ditutup di Atas RMB 27.100/kg, Berdampak pada Biaya Hilir
Baca Selengkapnya
Lelang Konsentrat Germanium di Shaoguan Ditutup di Atas RMB 27.100/kg, Berdampak pada Biaya Hilir
Lelang Konsentrat Germanium di Shaoguan Ditutup di Atas RMB 27.100/kg, Berdampak pada Biaya Hilir
SMM News, 21 September: Informasi pasar menunjukkan lelang tender konsentrat germanium di Shaoguan baru-baru ini berhasil diselesaikan. Sumber pasar melaporkan harga transaksi akhir melebihi RMB 27.100 per kilogram. Pelaku pasar berkomentar bahwa harga bahan baku germanium yang tinggi seperti itu akan menjadi tantangan bagi biaya produksi produk germanium hilir ke depannya.
3 menit yang lalu
Peleburan Utara Meluncurkan Tender Selenium Mentah 25 Ton di Tengah Harga Stabil
15 menit yang lalu
Peleburan Utara Meluncurkan Tender Selenium Mentah 25 Ton di Tengah Harga Stabil
Baca Selengkapnya
Peleburan Utara Meluncurkan Tender Selenium Mentah 25 Ton di Tengah Harga Stabil
Peleburan Utara Meluncurkan Tender Selenium Mentah 25 Ton di Tengah Harga Stabil
Berita SMM, 21 Sep: Sumber pasar mengindikasikan sebuah smelter utara meluncurkan tender untuk selenium mentah hari ini, dengan volume sekitar 25 ton. Penawaran dijadwalkan besok menurut informasi pasar. Harga selenium belakangan ini cenderung stabil dengan bias naik, dan pasar menunggu hasil tender.
15 menit yang lalu
【Flash | Throughput Lebih Tinggi, Molibdenum Lebih Rendah: Output ZCMC Turun 13,7%】
3 jam yang lalu
【Flash | Throughput Lebih Tinggi, Molibdenum Lebih Rendah: Output ZCMC Turun 13,7%】
Baca Selengkapnya
【Flash | Throughput Lebih Tinggi, Molibdenum Lebih Rendah: Output ZCMC Turun 13,7%】
【Flash | Throughput Lebih Tinggi, Molibdenum Lebih Rendah: Output ZCMC Turun 13,7%】
Zangezur Copper Molybdenum Combine (ZCMC) melaporkan produksi konsentrat molibdenum 2025 sebesar 15.548 ton basah (13.389,68 ton kering), turun 13,7% dari 18.014 ton basah (15.507,08 ton kering) pada 2024. Penjualan turun 15,5% menjadi 15.614 ton basah. Sementara itu, bijih kering yang diolah naik 1,5% menjadi 22,67 juta ton, dengan ZCMC mengaitkan penurunan produksi molibdenum dengan karakteristik bijih. Perusahaan tidak memproduksi ferromolibdenum atau konsentrat molibdenum panggang pada 2025, dibandingkan dengan masing-masing 273 ton dan 547 ton pada 2024. Angka konsentrat tersebut mewakili berat produk fisik, bukan kandungan molibdenum.
3 jam yang lalu