[metal noon news] most non-ferrous metals fall back to aluminum prices for two days in a row * lead downstream pre-festival stock limited * Sichuan silicon plant is difficult to resume production

Telah Terbit: Apr 28, 2020 12:07 (GMT+8)
[metal noon news] the metal market is generally green

Metal news

In the oil market, the "Black Monday" metal market was generally green, Shanghai nickel fell 1.4 percent, Shanghai tin fell 1.1 percent.

April 28 Guangdong copper spot market report: pre-holiday stock demand is weak, rising water significantly decreased

China Nonferrous Mining Industry to sell Copper products with a ceiling of $36.3 million to Octagon Commodities

East China Aluminium: aluminum prices have risen for two days in a row and there has been a slight hesitation in preparing goods downstream for two days in a row.

SMM midday review: South China aluminum: receiving goods to reduce transactions to weak before the festival base weak adjustment

Aluminum in Russia: new Crown epidemic completely changes the Market Prospect of Aluminum products in 2020

SMM restores lead market news on April 28: Shanghai lead high level falls back to regenerated lead market trading general

SMM Shanghai lead Market Express on April 28: the transaction activity of the downstream pre-holiday stock limited spot market is not high.

Ningbo zinc ingot spot on April 28: market trading is warmer than yesterday

April 28 Tianjin Zinc Ingot spot: futures Zinc Price is better than yesterday's decline in downstream willingness to receive goods

The price of tin has fallen slightly. Some traders have made purchases.

[SMM brief comment] Shanghai Nickel opened low in the morning and approached the 100000 gate, spitting out all the gains yesterday.

Rumors of epidemic situation have not confirmed the normal operation of Morowali Industrial Park in Indonesia

Zijin Mining: continued consultation on mining rights of Bogla Gold Mine in violation of legal obligations of the PNG Government

It is difficult to resume production in Sichuan Silicon Plant in flat water period. [SMM Daily Review] it is difficult to resume production in Sichuan Silicon Plant.

Macro

The Federal Reserve will provide up to $500 billion in loans to relax local government lending standards

Focus: the latest tracking of the global epidemic: more than one million new confirmed cases in the United States

Related news

[stock Market Review] after the two markets opened higher, they fell and then V-shaped liquor stocks led the rise in early trading.

Announcement of Road Motor vehicle Manufacturing Enterprises and products issued by the Ministry of Industry and Information Technology

April 28 SMM spot metal prices

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to view SMM exclusive metal spot price historical data

"Click to sign up:" 2020 (15th) China International Aluminum processing Summit "

Scan QR codes, apply to attend the meeting or join the SMM Metal AC Group

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
02 Oct 2026 16:31 (GMT+8)
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
02 Oct 2026 16:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
02 Oct 2026 15:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
02 Oct 2026 15:31 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
02 Oct 2026 15:27 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
02 Oct 2026 15:27 (GMT+8)