SMM Evening Comments (Apr 24): Shanghai base metals closed mixed as investors monitored coronavirus, economic data and oil prices

Telah Terbit: Apr 24, 2020 18:36 (GMT+8)
SHFE base metals closed mixed on Friday, as traders monitored fresh economic data and digested a report that raised doubts over a possible coronavirus treatment. Tin added 1.2%, nickel rose 0.8%, copper gained 0.2%, while zinc edged down 0.03%, and aluminiums shed 0.2%. Lead closed flat.

SHANGHAI, Apr 24 (SMM) – SHFE base metals closed mixed on Friday, as traders monitored fresh economic data and digested a report that raised doubts over a possible coronavirus treatment.

 

Tin added 1.2%, nickel rose 0.8%, copper gained 0.2%, while zinc edged down 0.03%, and aluminiums shed 0.2%. Lead closed flat. The SHFE will keep its night trading session suspended until May 6.

 

Following crude's rollercoaster ride, SHFE base metals wrapped up this week in mixed territories. Their counterparts on the LME were also mixed as of 18:24 Beijing time.

 

Market sentiment took a hit after an overnight report by the Financial Times, citing documents accidentally published by the WHO, said that drug remdesivir from Gilead had failed to improve patients’ conditions.

 

Grim economic data also dampened sentiment. A report from the UK’s Office for National Statistics (ONS) Friday revealed that British retail sales had fallen at the fastest rate on record in March.

 

Preliminary PMIs for April published on Thursday showed that business activity in the US and eurozone plumbed new record lows, while a separate report from the US Labour Department revealed that all of the job gains since the Great Recession have been wiped out in just five weeks.

 

The US dollar index, which tracks the greenback against a basket of its peers, held near more than two-week highs, while oil prices continued their comeback from a recent slump, with international benchmark Brent crude futures rising above $26 per barrel in Asian trading hours.

 

Copper: The most-liquid SHFE June contract opened higher and fluctuated to finish the day 0.17% higher at 41,780 yuan/mt, to produce a weekly loss of 1.18%, marking the first decline in five weeks. The contract struggled to break through the 42,000 mark, as bulls lacked confidence at highs.

Copper stocks at SHFE-approved warehouses dropped more than 44,000 mt this week to 259,037 mt as of April 24, showed data from the bourse.

MMG said on Friday that copper concentrate shipments from the site of its Las Bambas operations in Peru to the port could restart "as soon as next week." This came a day after Peruvian President Martin Vizcarra extended the country's state of emergency declared over the coronavirus outbreak until May 10.

 

Aluminium: The most-traded SHFE June contract climbed, recouping losses from a weak open to end the day 0.2% weaker at 12,285 yuan/mt. It shed 1.01% on the week, after a jump of 4.77% in the prior week, which was the biggest percentage weekly gain since August 2017 for SHFE aluminium.

Aluminium stocks at SHFE-approved warehouses declined over 27,000 mt this week to 458,403 mt as of April 24, showed data from the bourse.

Alcoa Corporation announced Wednesday that it will close its Intalco Works aluminum smelter near Ferndale amid declining market conditions, laying off 700 employees.

 

Zinc: The buildup of long positions helped the most-traded SHFE June contract claw back the majority of losses from a low open to close the day a tad weaker at 15,825 yuan/mt. The contract shed 1.89% on the week, after four consecutive weeks of gains. Concerns over ore supply are expected to continue to support market sentiment as lockdowns in some countries have been extended. SMM data showed that social inventories of zinc ingots fell sharply this week, widening backwardation on SHFE zinc.

Zinc stocks at SHFE-approved warehouses fell nearly 14,000 mt this week to 133,349 mt as of April 24, showed data from the bourse.

 

Nickel: The most-traded SHFE June contract surged to a session high of 101,260 yuan/mt in early morning trade, before it erased some gains to end 0.83% firmer at 99,780 yuan/mt. It rose 0.82% on the week, marking the third straight week of gains.

Nickel stocks at SHFE-approved warehouses fell more than 500 mt this week to 27,461 mt as of April 24, showed data from the bourse.

 

Lead: The most-liquid SHFE June contract oscillated in a range of 100 yuan/mt around the daily moving average to close the day flat at 13,775 yuan/mt. Trading volumes continued to shrink as both longs and shorts tended to maintain a wait and see position. SHFE lead is expected to remain rangebound before there are tangible changes to fundamentals. The contract gained 0.44% on the week, marking the fourth consecutive weekly change of less than 1%.

Lead stocks at SHFE-approved warehouses declined over 800 mt this week to 7,074 mt as of April 24, showed data from the bourse.

 

Tin: The most-traded SHFE June contract reversed an earlier slip to close the day 1.15% at 128,870 yuan/mt. It produced a weekly gain of 0.57%, registering a five-week winning streak. Resistance is still seen at 130,000 yuan/mt, while support is at the 40-day moving average at 125,000 yuan/mt.

Tin stocks at SHFE-approved warehouses shrank more than 100 mt this week to 3,702 mt as of April 24, showed data from the bourse.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
02 Oct 2026 16:31 (GMT+8)
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
02 Oct 2026 16:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
02 Oct 2026 15:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
02 Oct 2026 15:31 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
02 Oct 2026 15:27 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
02 Oct 2026 15:27 (GMT+8)