Indonesian government evaluates new infrastructure projects involving nickel-iron smelter construction

Telah Terbit: Apr 23, 2020 17:46

SMM4, 23 Jun: recently, Indonesian Minister of Maritime Affairs and Investment Luhut said that the government has been evaluating 11 new infrastructure projects, which will be incorporated into the national strategic project (PSN), to attract investment and create jobs. "I discussed with the Minister of Coordinating economy because we wanted to assess which of the national strategic projects could be funded by the private sector so that we would not rely solely on the national budget, given the current situation caused by the pandemic. I hope we can act quickly."

It is reported that Indonesia has been refocusing its national spending to provide funding for the fight against the pandemic. Luhut expects privately funded projects to continue to develop and absorb workers while contributing to the country's foreign exchange reserves. The projects included in the list of national strategic projects will be granted easier licensing processes and accelerated land procurement as well as government guarantees for any political risks.

According to Septian Hario Seto, Deputy head of Investment Coordination and Mining, Office for the Coordination of Maritime Affairs and Minister of Investment, two of the proposed 11 new projects are industrial areas and industrial parks. The Obi Island Industrial Zone in Hamahela Regent District, south of North Maluku, has nearly 2000 workers and already has a second stage rotary kiln-electric furnace (RKEF) smelter for the production of ferronickel, with an estimated investment of US $800m. A major development in the industrial zone will be the construction of a high-pressure acid leaching [HPAL] smelter, which will be completed in the third quarter of 2020. The HPAL smelter produces materials for lithium batteries, cobalt sulfate and nickel sulfate.

He said the second proposed project for the national strategic project was the Weda Bay industrial park project, which had suspended operations at the smelter because of the outbreak. Investment plans for 2020 are about $4 billion to $5 billion, while exports are estimated at least $2 billion by 2024. The other nine projects are six smelter projects, a coal-to-coal processing area in East Kalimantan Province, a Kawan industrial area and the construction of the Kediri-Tulungagung Turnpike in East Java. "investors in the project are being financially evaluated to ensure that they are able to complete the project by 2024 and be included in the national strategic project."

2020 China International stainless Steel Industry Market and Application Development Forum

Scan QR codes, apply to attend the meeting or join the SMM Metal AC Group

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Analysis] September Emas: Harga Nickel Pig Iron merosot karena pabrik-pabrik China menunda restocking
10 jam yang lalu
[SMM Analysis] September Emas: Harga Nickel Pig Iron merosot karena pabrik-pabrik China menunda restocking
Baca Selengkapnya
[SMM Analysis] September Emas: Harga Nickel Pig Iron merosot karena pabrik-pabrik China menunda restocking
[SMM Analysis] September Emas: Harga Nickel Pig Iron merosot karena pabrik-pabrik China menunda restocking
Harga Nickel Pig Iron mendekati CNY 1.100/mtu saat September emas dimulai, tetapi persediaan yang melimpah membuat pabrik-pabrik China berhati-hati dalam melakukan restocking. Bijih yang lebih murah melindungi produsen Indonesia, namun margin terus menyempit. Pembelian berkelanjutan atau pemangkasan pasokan diperlukan untuk membangun dukungan harga yang lebih kokoh.
10 jam yang lalu
[SMM Analysis] Puncak Musim September Kurang Memuaskan: NPI Kelas Tinggi Turun ke 1.100, Pabrik Baja Masih Tidak Terburu-buru Membeli
10 jam yang lalu
[SMM Analysis] Puncak Musim September Kurang Memuaskan: NPI Kelas Tinggi Turun ke 1.100, Pabrik Baja Masih Tidak Terburu-buru Membeli
Baca Selengkapnya
[SMM Analysis] Puncak Musim September Kurang Memuaskan: NPI Kelas Tinggi Turun ke 1.100, Pabrik Baja Masih Tidak Terburu-buru Membeli
[SMM Analysis] Puncak Musim September Kurang Memuaskan: NPI Kelas Tinggi Turun ke 1.100, Pabrik Baja Masih Tidak Terburu-buru Membeli
Pada awal musim puncak September, harga NPI turun ke sekitar 1.100 yuan per unit nikel, namun transaksi dengan harga rendah tidak memicu restocking secara luas. Pabrik baja memiliki persediaan bahan baku yang cukup, dan dengan pengisian kembali persediaan di pelabuhan, tekanan persediaan produk jadi, serta pengurangan jadwal produksi, pembeli terus menekan harga lebih rendah, dengan premi untuk material kadar rendah menyempit terlebih dahulu. Penurunan harga bijih Indonesia memberikan penyangga biaya bagi smelter, tetapi laba mereka tetap tertekan oleh harga jual yang lebih rendah, dan belum ada pengurangan pasokan yang jelas. Apakah level 1.100 dapat menjadi level dukungan bergantung pada apakah pabrik baja dapat mempertahankan pembelian setelah transaksi harga rendah.
10 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (7 Sep)
12 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (7 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (7 Sep)
Data: Pergerakan pasar SHFE, DCE (7 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 07 Sep 2026.
12 jam yang lalu
Indonesian government evaluates new infrastructure projects involving nickel-iron smelter construction - Shanghai Metals Market (SMM)