[SMM Analysis] South Africa extends the "closed country" to the end of April cobalt salt prices may stop falling

Telah Terbit: Apr 10, 2020 19:51 (GMT+8)
Therefore, in the short term, even if South Africa continues to "seal off the country", the low demand in April still dominates, and the price of cobalt salt still has room to fall slightly, mainly due to the fact that the downstream buyer's market is still relatively strong and the price reduction is serious, which does not rule out the signing of a small amount of cobalt salt plant funds under pressure to reduce prices; if domestic demand gradually recovers in early May, cobalt raw materials will be affected, and the price of cobalt products may stop falling from May to June.

SMM4, April 10: South Africa time on April 9, President Ramafosa announced that South Africa will extend the "enfeoffment" measures until the end of April. According to statistics, by 09:31 today, a total of 1934 new cases have been confirmed in South Africa, and the epidemic situation in Africa is not optimistic for the time being.

According to reports, Ramafosa said that since the implementation of the "enfeoffment" measures on March 26, remarkable results have been achieved. In the first two weeks, the number of confirmed cases in South Africa increased by an average of 42% a day, and after the beginning of "enfeoffment", the increase dropped to only 4%. In the light of the experience of other countries, South Africa has decided to continue to implement the "city closure" measures until the end of April. In the meantime, the government is likely to allow some industries to resume operations under strict control in order to achieve a phased recovery of the economy. The news may increase the smelter's "high price" confidence, raw material cost support has strengthened, but downstream demand is still low, the power market is expected to gradually return to normal at the end of April or early May, and the increase in the consumer market is also lower than expected.

In terms of raw materials, according to SMM research, cobalt raw materials in domestic smelters can be used until the end of April, and cobalt raw materials such as offshore and bonded areas can be used until the end of May. The South African "closure" measures to the end of April mainly affect the domestic raw material imports from May to June, according to SMM customer feedback, the current cobalt raw material exports after mid-April may be delayed.

From the perspective of cobalt salt stocks, according to the SMM balance sheet, cobalt salt accumulated about 1900 tons of metal tons from January 2018 to March 2020, accounting for about 80 per cent of the expected downstream demand in April, that is, regardless of the normal start-up of the cobalt salt plant in April, the current cumulative cobalt salt stock can meet nearly 80 per cent of the expected downstream demand in April. In the near future, the mainstream cobalt salt plants are interested in "offering". According to customer feedback, the price has been basically maintained, and a small number of cash transaction orders have appeared in the past two days, and the price has dropped slightly. Therefore, in the short term, it is still not ruled out that a small number of cobalt salt plants have not returned funds to maintain their operations, and a small amount of low-price selling behavior.

Downstream demand, according to SMM research, April is expected to slow recovery of the power market, the digital market affected by overseas exports, procurement volume may decline; cobalt oxide in April expected a slight decline in demand for cobalt salt, mainly due to the increase in orders for some large cobalt oxide plants in March, the operating rate is higher, demand in the lower reaches of April slightly weakened, expected to reduce the operating rate, the rest of the manufacturers are expected to start basically the same.

Therefore, in the short term, even if South Africa continues to "seal off the country", the low demand in April still dominates, and the price of cobalt salt still has room to fall slightly, mainly due to the fact that the downstream buyer's market is still relatively strong and the price reduction is serious, which does not rule out the signing of a small amount of cobalt salt plant funds under pressure to reduce prices; if domestic demand gradually recovers in early May, cobalt raw materials will be affected, and the price of cobalt products may stop falling from May to June.

SMM cobalt lithium new energy research team

Hu Yan 021-51666809

Qin Jingjing 021-51666828

Mei Wangqin 021-51666759

Huo Yuan 021-51666898

Wuyang 021-51666818

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM News] Solis mulai pengeboran litium di Campo Grande
11 jam yang lalu
[SMM News] Solis mulai pengeboran litium di Campo Grande
Baca Selengkapnya
[SMM News] Solis mulai pengeboran litium di Campo Grande
[SMM News] Solis mulai pengeboran litium di Campo Grande
Solis Minerals telah memulai pengeboran inti di Proyek Lithium Campo Grande di Lembah Lithium Araçuaí-Salinas, Brasil. Perusahaan merencanakan lima lubang dengan total sekitar 1.000 m, dengan kedalaman yang direncanakan hingga 200 m, untuk menguji pegmatit lithium di sepanjang koridor 500 m. Target tersebut didasarkan pada anomali geokimia multi-elemen yang bertepatan di permukaan dan hasil pengeboran auger historis. Pekerjaan historis oleh Rio Tinto serta pemetaan dan pekerjaan geokimia selanjutnya oleh Solis menentukan target tersebut. Solis juga telah memetakan kawanan pegmatit baru yang terdiri dari tiga zona singkapan koheren di antara lubang yang direncanakan DHCG-001 dan DHCG-004. Program ini akan menguji kontinuitas, geometri, dan potensi lithium pegmatit di bawah permukaan, dimulai dari lokasi pegmatit yang dipetakan bertepatan dengan anomali geokimia. Solis menyatakan bahwa geologi dan geokimia Campo Grande sebanding dengan Proyek Lithium Colina milik PLS Group, sekitar 100 km ke arah barat daya. Secara terpisah, Solis telah menyelesaikan tujuh lubang bor di Proyek Lithium Mandacaru di Brasil, dengan hasil pengujian yang masih menunggu.
11 jam yang lalu
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
11 jam yang lalu
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
Baca Selengkapnya
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
[SMM News] Charger memulai kembali pengeboran di deposit litium Medcalf
Charger Metals telah mengerahkan rig pengeboran kedua ke Proyek Lithium Lake Johnston di Australia Barat sebagai bagian dari program 10.000 m yang menargetkan pertumbuhan sumber daya. Rig pengeboran intan dan sirkulasi balik kini beroperasi di deposit lithium Medcalf, dan pengeboran RC dimulai sekitar satu minggu lalu. Program ini akan menggandakan jumlah meter yang dibor di Medcalf. Pengeboran menargetkan perluasan dan pengisian pada estimasi sumber daya mineral tereka Medcalf sebesar 10,6 Mt dengan kadar 1% Li₂O. Pengeboran telah lebih mendefinisikan Target Eksplorasi Medcalf West sebesar 3–5 Mt pada kadar 1–1,4% Li₂O. Program ini juga bertujuan menyediakan inti bor intan untuk pengujian metalurgi dan geoteknik. Setelah peningkatan sumber daya Medcalf baru-baru ini, yang menaikkan Li₂O terkandung sebesar 34%, dewan Charger telah menyetujui Studi Lingkup pada Proyek Lake Johnston. Sumber daya saat ini berada pada grid pengeboran dominan 40 m x 80 m, termasuk 10.936 m pengeboran dengan biaya $32 per ton Li₂O terkandung. Program ini sepenuhnya didanai dari penjualan Proyek Lithium Bynoe oleh Charger kepada Core Lithium sebesar $3,75 juta tunai, yang diterima pada 17 Juli 2026. Lake Johnston terletak 450 km di timur Perth di Provinsi Yilgarn, sekitar 70 km dari Proyek Lithium Earl Grey, tempat Covalent Lithium memulai penambangan dan commissioning pada Maret 2024.
11 jam yang lalu
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
11 jam yang lalu
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
Baca Selengkapnya
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
[SMM News] Savannah mengumpulkan lebih dari $40 juta untuk mengembangkan proyek litium Portugal
Pada 23 September, Savannah Resources mengumpulkan dana US$30 juta untuk Proyek Litium Barroso di Portugal, melalui 408 juta saham pada harga £0,055 per saham, termasuk US$11,2 juta dari perjanjian subskripsi dengan pemegang saham utama. Ditambah kas yang tersedia sebesar US$15,5 juta, dana tersebut digunakan untuk fabrikasi komponen dengan waktu tunggu lama, pembangunan jalan akses, kontrak EPCM, rekayasa pabrik, perizinan, dan hak guna lahan. Studi kelayakan definitif (DFS) fase satu Barroso pada Juli 2026 menguraikan umur tambang 14 tahun dengan produksi 183.000 ton per tahun litium oksida, kadar 5,5%, berdasarkan harga US$1.788 per ton yang menghasilkan EBITDA US$3,2 miliar, arus kas bebas US$1,9 miliar, dan NPV setelah pajak US$913 juta. Deposit tersebut memiliki 39 juta ton pada kadar 1,05% Li2O dengan kandungan 411.900 ton, sumber daya spodumena batuan keras terbesar di Eropa. Pendanaan ini memajukan salah satu dari sedikit sumber litium batuan keras skala besar yang sedang dikembangkan di luar rantai pasok Tiongkok yang terhubung dengan Afrika dan Amerika Selatan, mendukung target diversifikasi bahan baku kritis Uni Eropa.
11 jam yang lalu