[brief Review of SMM Copper] Copper Mine is affected by the epidemic situation and aggravated the shortage of Copper supply. It is expected that the main force of copper in Shanghai will rise strongly in the afternoon and hit the 42000 pass.

Telah Terbit: Apr 10, 2020 18:23 (GMT+8)
A brief Review of SMM Copper on April 10

SMM, 10 April:

Today, the Shanghai copper main contract 2005 jumped short in the morning low at 40570 yuan / ton, then the center of gravity slowly climbed to 40870 yuan / ton, closed at 40890 yuan / ton in midday. At the beginning of the afternoon, the bulls strengthened to pull up the price of copper from 40830 yuan / tonnage to 41420 / ton. At this time, high multi-flat entry, copper prices fell slightly, all the way up, the market chased up sentiment enthusiastically, the impact of 42000 yuan / ton gate failed, reaching the highest point of 41890 yuan / ton in the day. Then the bulls left the market, copper prices fell slightly, closed at 41790 yuan / ton, up 950 yuan / ton, up 2.33%. Today, the transfer of the main force of Shanghai copper has been completed, Shanghai copper 2006 early opening at 40580 yuan / ton, that is, the lowest point of the day. It rose strongly in the afternoon, climbing to a daily high of 41820 yuan per ton. The intraday position of Shanghai Copper main contract increased by 871 hands to 104000 hands, mainly for long positions; trading volume increased by 2.1hands to 7.1hand; Shanghai Copper 2006 contract daily position increased by 3557 hands to 105000 hands, mainly for long positions; trading volume increased by 29000 hands to 77000 hands, Shanghai copper main positions and trading volume have completed a backward shift. The Shanghai copper index increased by 1320 hands to 334000 hands, mainly by long positions, while trading volume increased by 67000 hands to 208000 hands. The main force of copper in Shanghai opened low and went high today, mainly due to further deterioration of market expectations of tight global copper supply. BHP Billiton today confirmed two confirmed cases of new crown pneumonia at the Escondida copper mine in Chile, the world's largest copper mine, amid concerns about the intensification of the global contradiction between supply and demand for copper, prompting a sharp rise in copper prices in the afternoon. Macroscopically, stimulus policies in Europe and the US increased yesterday in response to the recession caused by the global new crown epidemic. The Fed will launch up to $2.3 trillion in loans to use lending instruments to boost the U. S. economy. For the time being, the Bank of England will be able to monetize government debt directly, allowing the British government to overdraw indefinitely until the epidemic subsides. The policy of further releasing liquidity to underpin the economy has made market expectations more optimistic. And coincided with the Easter holiday, LME closed on Friday and next Monday, the internal market lack of guidance, copper prices rose today, the market chased sentiment enthusiastically. Shanghai copper rose sharply today, the technical side is good. At present, the main force of Shanghai Copper is close to the 42000 level to make up for the gap of jumping empty two weeks ago.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
02 Oct 2026 16:31 (GMT+8)
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
02 Oct 2026 16:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
02 Oct 2026 15:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
02 Oct 2026 15:31 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
02 Oct 2026 15:27 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
02 Oct 2026 15:27 (GMT+8)