Macro Roundup (Feb 19)

Telah Terbit: Feb 19, 2020 08:36 (GMT+8)
The US dollar rose on Tuesday to its highest in nearly three years against the euro, which was weighed by Germany's slumping investor confidence

SHANGHAI, Feb 19 (SMM) – This is a roundup of global macroeconomic news last night and what is expected in the day ahead.


Last night


The US dollar rose on Tuesday to its highest in nearly three years against the euro, which was weighed by a German survey showing slumping investor confidence in Europe's largest economy.
LME base metals fell for the most part. Nickel lost 2%, zinc fell 1.5%, tin slipped 1.1%, copper shed 1%, while aluminium added 0.3%, and lead grew 0.8%. The SHFE night trading session remained suspended to contain the spread of the coronavirus.
Germany's ZEW research institute said in its monthly survey that investors' mood deteriorated far more than expected in February, on worries the virus outbreak would dampen world trade.
The ZEW indicator for economic sentiment for Germany fell to 8.7 from 26.7 in January. Economists had expected a drop to 21.5.
The survey adds to expectations that Europe’s biggest economy will continue to lose momentum in the first half of 2020 as its manufacturers linger in a recession prompted by a reduction in exports.
“The feared negative effects of the coronavirus epidemic in China on world trade have been causing a considerable decline of the indicator of economic sentiment for Germany,” said ZEW President Achim Wambach.
“Expectations regarding the development of the export-intensive sectors of the economy have dropped particularly sharply,” he added.
Declines were also reflected, although less pronounced, in the wider eurozone with the 19-country currency union's economic sentiment assessed 15.2 lower, at 10.4 in February.
Inflation expectations in the eurozone were also dragged down, falling 13.7 to 4.7.


Day ahead


Key economic data slated for release today include the US building permits, housing starts and producer price index (PPI) for January, as well as its weekly crude oil change surveyed by the American Petroleum Institute (API). 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
02 Oct 2026 15:49 (GMT+8)
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
Baca Selengkapnya
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
[SMM Kilasan Emas] Rancangan undang-undang pertambangan yang ditinjau Reuters pada 30 September akan memungkinkan menteri pertambangan Ghana mewajibkan perusahaan menerbitkan saham khusus gratis kepada negara dengan hak persetujuan atas transaksi besar. RUU itu akan mempertahankan kepentingan negara 10% yang ditanggung gratis dan membatasi sewa pertambangan hingga 15 tahun atau umur tambang yang diproyeksikan, mana yang lebih pendek. Rancangan itu juga akan memungkinkan aturan di masa depan yang mewajibkan pemrosesan lokal dan membatasi ekspor konsentrat yang belum diproses. Tak satu pun dari proposal ini telah diberlakukan; Reuters tidak dapat memastikan kapan rancangan itu disusun. Bagi para penambang emas Ghana, hak yang diusulkan dan sewa yang lebih pendek dapat memengaruhi pembiayaan, valuasi, dan keputusan perpanjangan. Berdasarkan rancangan itu, pemegang hak yang ada yang mencari perpanjangan akan menerima pertimbangan prioritas untuk lisensi yang setara. Perusahaan pertambangan mengharapkan konsultasi lebih lanjut sebelum pembahasan di parlemen, lapor Reuters. Kata-kata akhir dan waktunya masih belum pasti.
02 Oct 2026 15:49 (GMT+8)
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
02 Oct 2026 15:48 (GMT+8)
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
Baca Selengkapnya
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
[SMM PGM Flash] Platinum Group Metals menyatakan pada 1 Oktober bahwa pengujian independen oleh Battery Innovation Center telah memvalidasi elektroda berbasis platinum dan paladium milik anak perusahaannya, Lion Battery, dalam sel prototipe litium-sulfur. Dibandingkan dengan sel tanpa katalis, prototipe tersebut menunjukkan kapasitas dan kemampuan laju yang lebih baik, dengan formulasi kaya paladium berkinerja terbaik secara keseluruhan. Platinum Group dan Valterra Platinum, yang masing-masing memiliki 52% dan 48% saham Lion, telah menyetujui pendanaan untuk tahap berikutnya. Hasil ini menawarkan kemungkinan penggunaan baru untuk PGM di luar katalis knalpot kendaraan, tetapi masih merupakan tonggak prototipe. Lion berencana membuat dan menguji sel kantong, menyempurnakan katalis, dan menilai aplikasi termasuk drone. Kinerja komersial dan permintaan untuk volume PGM yang signifikan belum terbukti. Pekerjaan ini relevan bagi pemasok Afrika Selatan: Valterra memproduksi PGM di Afrika Selatan dan Zimbabwe, sementara Platinum Group sedang mengembangkan proyek Waterberg di Afrika Selatan.
02 Oct 2026 15:48 (GMT+8)
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
01 Oct 2026 16:45 (GMT+8)
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
Baca Selengkapnya
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
[SMM PGM Flash] Sibanye-Stillwater mengumumkan pada 30 September bahwa para pekerja di tambang platinum dan paladium East Boulder miliknya di Montana telah meratifikasi perjanjian kerja bersama dengan United Steelworkers. Kesepakatan tersebut berlaku surut sejak 1 Agustus 2026 hingga 31 Juli 2029, dengan kenaikan upah 4,5% pada tahun pertama, mana yang lebih besar antara 3,5% atau IHK pada tahun kedua, dan mana yang lebih besar antara 3,0% atau IHK pada tahun ketiga. Aksi mogok di tambang Stillwater East yang terpisah dan fasilitas metalurgi Columbus masih berlanjut, kata perusahaan tersebut. Penyelesaian di East Boulder menetapkan sebagian jalur biaya tenaga kerja untuk bisnis PGM Sibanye di AS dan mendukung rencana peralihannya menuju penambangan yang lebih termekanisasi dan insentif berbasis tim. Hal ini tidak menyelesaikan pemogokan lainnya atau menunjukkan pemulihan produksi; perusahaan tidak mengungkapkan revisi panduan produksi dalam rilis ini.
01 Oct 2026 16:45 (GMT+8)