SMM Morning Comments (Jan 22)

Telah Terbit: Jan 22, 2020 09:44
LME base metals, except for aluminium and zinc, closed lower on Tuesday

SHANGHAI, Jan 22 (SMM) –

Copper: Copper prices extended their decline overnight as concerns about global economy renewed after the IMF trimmed its global growth forecasts. The outbreak of a deadly virus in China, US political turmoil and persisting Middle East tensions dented risk sentiment, and kept the US dollar at one-month highs. Three-month LME copper plunged 1.88% on the day to end at a two-week low of $6,145.5/mt. The most active SHFE 2003 contract erased earlier gains to close down 0.29% at 48,490 yuan/mt in overnight trading session. Copper prices are likely to see some stabilisation today after massive losses in the previous sessions. LME copper is expected to move between $6,120-6,180/mt today, with SHFE copper at 48,300-48,800 yuan/mt. Spot discounts are seen at 60-20 yuan/mt in holiday-lulled trading.

Aluminium: Three-month LME aluminium recovered from earlier losses to end at its highest in more than a week at $1,827/mt, up 0.55% on the day. It is expected to remain rangebound and trade between $1, 800-1,830/mt today. The most traded SHFE 2003 contract weakened 0.25% to 14,135 yuan/mt in overnight trading, as consumption was muted ahead of the Chinese New Year holiday. It is likely to remain weak and move at 14,000-14,200 yuan/mt today. Spot discounts are seen at 120-80 yuan/mt against the SHFE 2002 contract.

Zinc: Three-month LME zinc reversed an earlier slip to hit a new two-month peak of $2,458/mt on Tuesday, before it closed the trading day 0.55% higher at $2,452.5/mt. Falling inventories helped LME zinc buck the downtrend across nonferrous metals. Zinc inventories across LME warehouses declined 0.44% on the day to 50,900 mt. LME zinc is expected to trade between $2,420-2,470/mt today. The most active SHFE 2003 contract edged down 0.11% in overnight trading to end at 18,265 yuan/mt. The outbreak of the new virus sparked concerns about production recovery after the Chinese New Year holiday, which will weigh on SHFE zinc prices. The SHFE 2003 contract is expected to trade at 18,100-18,400 yuan/mt today. Spot premiums for domestic 0# Shuangyan are seen at 100-120 yuan/mt over the SHFE 2002 contract.

Nickel: Three-month LME nickel dropped 2.46% on the trading day to end at $13,670/mt, its lowest close in six weeks. LME nickel faces stiff resistance at $14,100/mt. The most traded SHFE 2003 contract shed 1.1% to 107,570 yan/mt in overnight trading. Resistance is strong at a confluence of several moving averages.

Lead: Three-month LME lead followed its SHFE counterpart lower in Asian trading hours, touching a one-week low of $1,938/mt, before it recovered some ground in European trading. It finished the trading day 0.15% lower at $1,960.5/mt, registering a four-day losing streak. The most active SHFE 2003 contract hovered around 15,180 yuan/mt overnight, and closed down 0.72% at 15,185 yuan/mt. SHFE lead stabilised after a massive decline in the previous session. It is expected to move sideways ahead of the Chinese New Year holiday.

Tin: Three-month LME tin climbed to a new six-month peak of $17,900/mt on Tuesday, before it eased to end down 1.4% at 17,595/mt, pausing a rally that began more than two weeks ago. Support is seen at $17,500/mt. The unwinding of short positions helped the most traded SHFE 2006 contract recover somewhat from initial losses overnight, and the contract ended the session down 0.48% at 139,550 yuan/mt. Resistance lies at 140,000 yuan/mt.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
9 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
9 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
12 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
12 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
13 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
13 jam yang lalu
SMM Morning Comments (Jan 22) - Shanghai Metals Market (SMM)