SMM Morning Comments (Jan 15)

Telah Terbit: Jan 15, 2020 09:33
LME base metals, except for nickel and zinc, closed higher on Tuesday. The SHFE complex performed similarly overnight

SHANGHAI, Jan 15 (SMM) –

Copper: Copper prices extended their gains overnight. Three-month LME copper hit a fresh eight-month peak of $6,321/mt before it closed the trading day 0.3% firmer at $6,310.5/mt. The most active SHFE 2003 contract rose to a two-week high of 49,610 yuan/mt in overnight trading, and closed 0.45% higher at 49,400 yuan/mt. Optimism over the signing of a preliminary US-China trade deal, easing US-Iran tensions, upbeat Chinese trade data and a weaker US dollar will underpin copper prices today. LME copper is expected to move between $6,265-6,325/mt today, with SHFE copper at 49,100-49,600 yuan/mt. Spot premiums are seen lower at 20-50 yuan/mt, as trades weaken ahead of the Chinese New Year holiday.

Aluminium: Three-month LME aluminium rebounded on Tuesday, gaining 0.56% on the day to end at $1,808/mt. LME aluminium wavered in a wide range in recent sessions, and is expected to trade between $1,790-1,815/mt today. The most traded SHFE 2003 contract recovered from earlier losses to end overnight session a tad higher at 13,955 yuan/mt. SHFE aluminium has fallen below 14,000 yuan/mt, but further downside will be limited by low inventories. It is likely to move at 13,900-14,100 yuan/mt today. Spot discounts are seen at 240-180 yuan/mt over the SHFE 2001 contract which is about to expire.

Zinc: Three-month LME zinc recovered from an earlier slip to end the trading day marginally lower at $2,375/mt. Zinc inventories across LME warehouses increased 2.36% on the day to 51,800 mt, as a wider premium for LME cash zinc over the three-month contract, at $11.75/mt on Tuesday, attracted deliveries to the warehouses. LME zinc is expected to trade between $2,340-2,390/mt today. The most active SHFE 2003 contract recouped some earlier losses to end overnight session 0.11% lower at 18,175 yuan/mt. It was supported by the 10-day moving average, while pressured by the 60-day one. It is expected to trade at 17,900-18,400 yuan/mt. Spot premiums for domestic 0# Shuangyan are seen lower at 100-120 yuan/mt over the SHFE 2001 contract, as downstream buyers hold back from making purchases. Deliveries to Shanghai, meanwhile, were slowed by logistical issues.

Nickel: Three-month LME nickel dropped to its weakest in more than a week at $13,645/mt on Tuesday, before it recovered some ground to end the trading day 1.52% weaker at $13,890/mt. LME nickel now faces a resistance confluence of several moving averages, and whether it could cling to the $13,900/mt level will come under scrutiny today. The most traded SHFE 2003 contract shed 1.61% in overnight trading to close at 109,470 yuan/mt. SHFE nickel has fallen below several moving averages and the middle Bollinger band, while support is seen at 108,000 yuan/mt. Resistance at 110,000 yuan/mt and moving averages should be closely watched today.

Lead: Three-month LME lead rallied to a one-month high of $1,955/mt on Tuesday, before it finished the trading day 1.96% higher at $1,951/mt. This indicated that support was strong at $1,900/mt. The most active SHFE 2003 contract tracked gains in its LME counterpart to a session-high of 14,980 yuan/mt overnight, before it ended 0.67% higher at 14,960 yuan/mt. SHFE lead remained in its recent range and is expected to continue such a patter in the short run as longs are not keen to buy.

Tin: Three-month LME tin recovered from earlier losses to end Tuesday 0.2% firmer at $17,435/mt. Resistance is seen at $17,500/mt, while support is at the 20-day moving average at $17,200/mt. The most traded SHFE 2006 contract recovered from an earlier slip overnight, gaining 0.43% to end at 138,820 yuan/mt. Support is seen at 137,500 yuan/mt in the short term, while resistance is at 139,500 yuan/mt.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
11 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
11 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
14 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
14 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
15 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
15 jam yang lalu