SMM Evening Comments (Dec 5)

Telah Terbit: Dec 05, 2019 18:43 (GMT+8)
SHFE nonferrous metals closed mostly higher on Thursday, with zinc leading the increase and ending up 1.27%

SHANGHAI, Dec 5 (SMM) – SHFE nonferrous metals closed mostly higher on Thursday. Zinc led the increase and ended up 1.27%. Copper advanced 0.47%, lead rose 0.27%, tin grew 0.07%, while aluminium lost 0.14%, and nickel shed 1.3%. 

The ferrous complex traded on a mixed note as iron ore rose 0.98%, hot-rolled coil grew 0.67%, while rebar went down 0.64%, stainless steel fell 0.39%, and coke closed down 0.16%. 

Copper: The most-active SHFE 2001 contract pared some overnight gains as optimism waned around a near-term preliminary trade deal between Washington and Beijing and disappointing US service sector data reinforced worries about the global economic slowdown. The contract stabilised at around 47,150 yuan/mt and finished the trading day 0.47% higher at 47,200 yuan/mt. Technical indicators suggest limited upward momentum tonight. The contract may test support from 47,200 yuan/mt tonight. 

Aluminium: A smaller weekly decline in social inventories of primary aluminium grew concerns about weaker demand and prompted investors to cover their long position, which sent the most-liquid SHFE contract to an intraday low of 13,910 yuan/mt. However, the decline was capped as bearish position also departed at the 13,920 yuan/mt level, ending the contract at 13,930 yuan/mt, down 0.14% on the day. Near-term trading range is expected at 13,900-14,000 yuan/mt. 

Zinc: The most-traded SHFE 2001 contract shruggged off pressure from the five- and 10- day moving averages to an intraday high of 18,060 yuan/mt, and closed higher for the third straight session at 18,000 yuan/mt, up 1.27% on the day. The contract has returned close to the Bollinger middle band. Optimistic signals from technical indicators, together with better-than-expected spot trades, will likely see the contract testing pressure from 18,000 yuan/mt tonight. 

Nickel: The most-liquid SHFE 2002 contract stayed rangebound at the daily moving average, or the 104,200 yuan/mt level, before ended down 1.3% on the day at 103,940 yuan/mt. The contract has declined for six consecutive days. It is seen consolidating around 104,000 yuan/mt tonight. 

Lead: The most-traded SHFE 2001 contract stemmed its four straight sessions of decline, closing up 0.27% on the day at 15,060 yuan/mt. However, technical indicators remained bearish and may expand the downside room in the contract tonight. 

Tin: The most-liquid SHFE 2001 contract rebounded after departing longs drove it to an intraday low of 138150 yuan/mt, closing 0.07% higher on the day at 139,080 yuan/mt. Open interest shrank 994 lots to 22,574 lots, as investors cut both long and short position. The contract is expected to trade with support from 138,000 yuan/mt and resistance from 139,500 yuan/mt tonight. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Montage Gold melaporkan 23.460 ons dari peningkatan produksi Oktober di tambang Koné, Côte d'Ivoire
7 jam yang lalu
Montage Gold melaporkan 23.460 ons dari peningkatan produksi Oktober di tambang Koné, Côte d'Ivoire
Baca Selengkapnya
Montage Gold melaporkan 23.460 ons dari peningkatan produksi Oktober di tambang Koné, Côte d'Ivoire
Montage Gold melaporkan 23.460 ons dari peningkatan produksi Oktober di tambang Koné, Côte d'Ivoire
[SMM Gold Flash] Montage Gold melaporkan bahwa tambang Koné di Pantai Gading memproses sekitar 880.000 ton bijih oksida selama Oktober, menghasilkan sekitar 23.460 ons emas. Pabrik pengolahan beroperasi rata-rata lebih dari 90% dari kapasitas terpasang 11 juta ton per tahun, mencapai 104% selama minggu terakhir Oktober. Kadar umpan rata-rata adalah 0,82 g/t emas dan perolehan rata-rata sekitar 95%. Perusahaan juga melaporkan bahwa pengeboran eksplorasi telah mengidentifikasi 12 endapan, dibandingkan dengan dua dalam studi kelayakan 2024. Penuangan emas pertama dilakukan pada 26 September 2026, dan produksi komersial diperkirakan akan dinyatakan pada kuartal keempat 2026. Perusahaan menargetkan pertumbuhan sumber daya lebih lanjut melalui program pengeboran 2026, yang telah melampaui 120.000 meter sejak awal tahun. Output Oktober menunjukkan peningkatan operasional yang cepat, meskipun tambang belum secara resmi menyatakan produksi komersial.
7 jam yang lalu
Appian menyalurkan 70% dari komitmen pertambangan awal IFC sebesar US$100 juta di Ghana dan Namibia
7 jam yang lalu
Appian menyalurkan 70% dari komitmen pertambangan awal IFC sebesar US$100 juta di Ghana dan Namibia
Baca Selengkapnya
Appian menyalurkan 70% dari komitmen pertambangan awal IFC sebesar US$100 juta di Ghana dan Namibia
Appian menyalurkan 70% dari komitmen pertambangan awal IFC sebesar US$100 juta di Ghana dan Namibia
[SMM Kilas Pertambangan Afrika] Appian Capital Advisory telah menyalurkan sekitar 70% dari komitmen awal International Finance Corporation (IFC) sebesar US$100 juta dalam kemitraan investasi pertambangan yang diluncurkan pada 2025, demikian dilaporkan Reuters pada 4 November. Investasi tersebut mencakup tiga proyek: tambang emas Asante Gold di Ghana, proyek tembaga Omico Copper di Namibia, dan operasi nikel-tembaga-kobalt Atlantic Nickel di Brasil. Kemitraan yang lebih luas antara Appian dan IFC diumumkan bernilai US$1 miliar. Perkembangan ini menyoroti peran pembiayaan pembangunan dalam mendukung proyek pertambangan di pasar negara berkembang. Appian memperkirakan akan menyalurkan sisa komitmen awal IFC pada akhir 2026 sambil menjajaki peluang lebih lanjut di Afrika dan Amerika Latin. Laporan tersebut tidak mengungkapkan jumlah yang dialokasikan untuk masing-masing proyek atau memberikan rincian per negara.
7 jam yang lalu
[SMM Analysis] Implats Q1 FY2027: Produksi Turun 3% karena Gangguan Pemrosesan Meningkatkan Persediaan
8 jam yang lalu
[SMM Analysis] Implats Q1 FY2027: Produksi Turun 3% karena Gangguan Pemrosesan Meningkatkan Persediaan
Baca Selengkapnya
[SMM Analysis] Implats Q1 FY2027: Produksi Turun 3% karena Gangguan Pemrosesan Meningkatkan Persediaan
[SMM Analysis] Implats Q1 FY2027: Produksi Turun 3% karena Gangguan Pemrosesan Meningkatkan Persediaan
Implats memulai tahun fiskal 2027 dengan produksi yang lebih rendah dan penurunan output logam jadi yang lebih besar. Produksi 6E grup turun 3% secara tahunan menjadi 854.000 ons pada Juli–September 2026, sementara produksi kotor yang dimurnikan dan dapat dijual turun 8% menjadi 763.000 ons. Lima kematian, penghentian keselamatan, dan gangguan pemrosesan menandai kuartal tersebut.
8 jam yang lalu