[SMM Thread] the General Library of the Factory Society has fallen three times again, and the fundamental support is beyond doubt.

Published: Oct 31, 2019 17:44


在经历上周厂库的小幅累积(2.28万吨)过后,本周螺纹库存再现“三降”局面,且在厂库下降的助推下,降幅有所扩大----本周螺纹总库存603.19万吨,环比下降44.29万吨(-6.8%),同比+14.3%。其中,
社会库存364.66万吨,环比下降32.53万吨(-8.2%),同比+1.8%,社库的稳步降库主要得益于旺盛的终端需求。
本周厂库238.53万吨,环比下降11.76万吨(-4.7%)。厂库的转增为降,究其原因:一方面,随着北方需求趋弱,北材南下已经启动,北方钢厂的部分南下资源依旧在途,暂未计入统计;另一方面,近期在多地频繁的环保限产消息“轰炸”下,期螺“应声而起”。使得前期的悲观情绪有所缓和,部分投机需求复苏。但在产量大幅高于去年同期,加之商家仍多持观望态度谨慎操作的情况下,厂库大幅高于去年同期40.8%。
就后期来看,尽管近期的阶段性环保限产依旧“时间短”、“复产快”,但对供应端的削弱作用聊胜于无。尤其北方地区普遍处在环保管控范围内,加之部分钢厂的南下操作,使得当地资源偏少,对当地现货价格形成一定支撑。而南方地区,尽管有北材南下的压力,但在刚需的强势表现下,现货价格依旧怀有较强的抗跌性。故短期内市场不宜过度悲观。

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
May 9, 2026 20:23
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Read More
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
[Waste Lead-Acid Battery Market Dynamics] It was reported that one waste lead-acid battery collection and storage entity has been established in Zhangye City, Gansu Province, namely Zhangye Mingcheng Waste Battery Recycling Co., Ltd., which has obtained the Hazardous Waste Operating License issued by the Department of Ecology and Environment of Gansu Province. The approved operating method and category is the collection (HW31, 900-52) of waste lead-acid batteries, with an operating capacity of 2,000 mt/year. A total of 4 waste lead-acid battery collection sites have been set up across the city.
May 9, 2026 20:23
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27