Weekly operating rates at lead-acid battery makers rise 0.87 percentage point

Telah Terbit: Sep 6, 2019 18:09
The rate climbed 0.87 percentage point from the previous week, to 54.22% in the week ended Sep 6

SHANGHAI, Sep 6 (SMM) – Lead-acid battery producers in China ramped up operations in the first week of September, as some recovered from technical upgrading or stockpiled.

An SMM survey showed that the average operating rate across lead-acid battery producers in Jiangsu, Zhejiang, Jiangxi, Hubei, and Hebei provinces climbed 0.87 percentage point from the previous week, to 54.22% in the week ended Friday September 6.

The rate has risen for six weeks in the past seven weeks.

Battery producers upgraded their facilities this year, as the new national guidelines for electric bikes, effective from the middle of April, aim to push battery lightweighting. Some plants completed the upgrading and recovered production this month.

A few producers of batteries used in communication stepped up production this week, as potential labour mobility in the forthcoming breaks, including the Mid-Autumn Festival, the National Day and Chinese New Year holidays, will affect their operations.

The growth in battery production, however, was moderate this week, as some producers began to rein in production as orders weakened with the peak season for e-bike batteries drawing to a close.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
1 menit yang lalu
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
Baca Selengkapnya
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
Nicola Mining Completes Treasure Mountain Mine Assessment, Aims for 2027 Restart
On September 9, Nicola Mining announced completion of an underground assessment of the Treasure Mountain silver-lead-zinc mine (~30 km NE of Hope, BC, Canada) by independent engineering firm McElhanney, advancing the 2027 resumption plan. Portals 1 and 2 remain accessible and intact; main workings, crosscuts, stoped-out areas and partial historical infrastructure are in place; natural ventilation is unobstructed; no impediments to further evaluation were identified, though localized support rehabilitation is required.
1 menit yang lalu
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
1 menit yang lalu
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
Baca Selengkapnya
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
Chengtun Mining to Acquire 65% Stake in Tibet Haiteng for RMB 709M, Boosting Silver-Lead-Zinc Resources
On September 3, Chengtun Mining announced that subsidiary Sichuan Shengfengyuan Mining will acquire a 65% stake in Tibet Haiteng Industrial from Liu Zongjun for RMB 709 million; the target will be consolidated upon closing. Tibet Haiteng holds exploration permits for the Baga-La (East) lead-zinc mine in Mozhugongka and Linzhou counties, Lhasa, Tibet, valid from July 28, 2026 to July 27, 2031, covering 42.0668 sq km. The target mine contains silver at large-deposit scale, lead and zinc at medium-deposit scale, with medium grades and favorable ore quality. The deal will increase the company's silver-lead-zinc resource base and optimize its mineral portfolio.
1 menit yang lalu
Vizsla Copper Akan Mengakuisisi Proyek VMS Seng-Timbal-Tembaga Delta di Alaska; Agnico Akan Mengambil 19,99% Saham
2 jam yang lalu
Vizsla Copper Akan Mengakuisisi Proyek VMS Seng-Timbal-Tembaga Delta di Alaska; Agnico Akan Mengambil 19,99% Saham
Baca Selengkapnya
Vizsla Copper Akan Mengakuisisi Proyek VMS Seng-Timbal-Tembaga Delta di Alaska; Agnico Akan Mengambil 19,99% Saham
Vizsla Copper Akan Mengakuisisi Proyek VMS Seng-Timbal-Tembaga Delta di Alaska; Agnico Akan Mengambil 19,99% Saham
Vizsla Copper mengumumkan bahwa mereka telah setuju untuk mengakuisisi 100% proyek polimetalik VMS Delta dan proyek emas Helm Bay di Alaska dari Agnico Eagle. Transaksi ini diperkirakan akan selesai pada kuartal keempat tahun 2026. Delta memiliki estimasi sumber daya historis sebesar 15,4 juta ton dengan kadar 3,8% seng, 1,7% timbal, 0,6% tembaga, 62 g/t perak, dan 1,7 g/t emas; estimasi tersebut belum diverifikasi sebagai sumber daya mineral terkini. Vizsla akan menerbitkan 22,52 juta saham kepada Agnico, yang mewakili sekitar 19,99% dari saham yang diterbitkan pada saat penandatanganan. Dengan persetujuan pemegang saham yang tidak berkepentingan, tambahan 2,90 juta saham akan meningkatkan kepemilikan Agnico menjadi sekitar 22%. Imbalan tersebut juga mencakup 3,04 juta waran dua tahun yang dapat dieksekusi pada harga C$1,95 per saham, ditambah royalti NSR sebesar 2% dan 3% masing-masing untuk Delta dan Helm Bay. Agnico dapat berinvestasi hingga C$5 juta dalam pembiayaan pasca-penutupan Vizsla, dengan syarat pembiayaan tersebut melebihi C$30 juta.
2 jam yang lalu
Weekly operating rates at lead-acid battery makers rise 0.87 percentage point - Shanghai Metals Market (SMM)