Metro Mining increases bauxite reserves by 18.8%

Telah Terbit: Jul 22, 2019 09:31 (GMT+8)

SMM7 22 July news: Metro Mining Ltd. of Australia Its reserves and resources were updated one year after its bauxite mine began operation on July 18. According to the company, the new figures mean that the mine's mining life could be extended to 2037, three years longer than previously estimated.

In its latest report, Metro said its total reserves for bauxite mines were estimated at 109.5 million wet metric tons, with an estimated estimate of 18.8 per cent in 2017. By pointing out changes in the conversion of additional resources to reserves and moisture assumptions, the company increased the percentage from 10 per cent to 12 per cent, resulting in an increase of 17.3 million wet metric tons. According to Metro, the increase in water assumptions is the result of the actual situation observed in the course of operation.

Metro cut its total resources for bauxite to 138.2 million tons from a forecast of 4.6 per cent in 2017. The company said the decline was the result of three main factors-bauxite mined so far, a relatively conservative dry bulk density of 1.83, and inferred small areas of resources removed from total reserves as a result of filling drilling results.

The total measurement resources of Metro are estimated at 78.1 million tons dry tons, an increase of 42.8 per cent over the 2017 estimate. The company said the decline was due to increased confidence in the resource, coupled with a small increase in alumina and silica levels on site.

Simon Finnis (Simon Finnis), managing director and chief executive of Metro Mining, said the latest figures bode well for the future of the project.

"We are pleased to report that the increase in reserves has effectively extended the mining life of bauxite mines and increased confidence in total resources. So far, the mining results are in good agreement with the resource and reserve models. The results of this update show that our confidence in the project has increased. "

Metro Mining, headquartered in Brisbane, was MetroCoal Ltd. in 2014 After acquisition from Cape alumina Ltd. It was spun off and began to operate from now on. The company has more than 500square miles of mining rights west of Cape York, second only to Alcan (Rio de Janeiro Tinto Alcan).

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
18 jam yang lalu
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Baca Selengkapnya
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Sumber pasar melaporkan: South32 merevisi penawaran Premium CIF MJP Q4 '26 menjadi US$265/mt, turun dari US$325/mt. Berlaku hingga 5 Oktober 2026.
18 jam yang lalu
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
01 Oct 2026 17:48 (GMT+8)
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Baca Selengkapnya
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Harga ADC 12 India tetap relatif stabil meskipun harga aluminium LME 3 bulan turun 1,2% antara 24 dan 30 September.
01 Oct 2026 17:48 (GMT+8)
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
01 Oct 2026 17:09 (GMT+8)
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Baca Selengkapnya
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto mengumumkan pada 1 Oktober bahwa mereka telah mencapai kesepakatan dengan Pemerintah Tasmania, Pemerintah Persemakmuran Australia, dan Hydro Tasmania untuk memperpanjang pasokan listrik ke smelter aluminium Bell Bay hingga akhir 2031. Kedua pemerintah juga akan memberikan paket dukungan gabungan sebesar A$200 juta selama lima tahun, masing-masing menyumbang A$100 juta. Ketentuan komersial dari perjanjian listrik tersebut tidak diungkapkan. Bell Bay memproduksi sekitar 190.000 ton aluminium primer per tahun, sementara kontrak listriknya yang ada akan berakhir pada akhir 2026. Kesepakatan ini menghilangkan ketidakpastian operasional langsung smelter tersebut. Bell Bay menjadi smelter aluminium besar ketiga di Australia yang menerima dukungan yang didukung pemerintah pada 2026, setelah Boyne dan Tomago, menyoroti tekanan berkelanjutan dari biaya listrik yang tinggi dan persaingan internasional.
01 Oct 2026 17:09 (GMT+8)