The target of Aeris Resources's second upward adjustment of copper production this year is 8.3 per cent higher than that of the previous one.

Telah Terbit: Jun 21, 2019 14:31 (GMT+8)
Aeris Resources raised its annual production target at Tritton copper mine in new south Wales by 4 per cent to 26450-26650 tonnes. The company had already raised its annual production guidance target once in April, from 24500 tons to 25500 tons. So after the increase, the new annual production target is 8.3% higher than before.

SMM6, 21 March -: Aeris Resources raised its annual production target at Tritton Copper Mine in New South Wales by 4 percent to 26450 tons to 26650 tons.

The company had already raised its annual production guidance target once in April, from 24500 tons to 25500 tons.

So after the increase, the new annual production target is 8.3% higher than before.

The main reason for the company's production target is due to the high grade and good production condition of Tritton and Murrawombie underground copper mines.

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Kilas | Kelangkaan Bahan Baku Hampir Memangkas Setengah Produksi Molibdenum Pengolah Kazakhstan】
1 jam yang lalu
【Kilas | Kelangkaan Bahan Baku Hampir Memangkas Setengah Produksi Molibdenum Pengolah Kazakhstan】
Baca Selengkapnya
【Kilas | Kelangkaan Bahan Baku Hampir Memangkas Setengah Produksi Molibdenum Pengolah Kazakhstan】
【Kilas | Kelangkaan Bahan Baku Hampir Memangkas Setengah Produksi Molibdenum Pengolah Kazakhstan】
Ferro-Alloy Resources melaporkan bahwa ferromolybdenum yang diproduksi di pabrik Balasausqandiq mengandung 14,6 ton molybdenum pada semester pertama 2026, turun 47,5% dari 27,8 ton pada tahun sebelumnya. Angka tersebut merupakan kandungan molybdenum, bukan berat kotor ferromolybdenum; perusahaan tidak mengungkapkan kadar paduan maupun total tonase produk. Throughput bahan baku turun 35% karena konsentrat yang dibeli dan layak diproses secara ekonomis tidak tersedia, sementara pendapatan turun 28% menjadi $1,8 juta. Keterbatasan bahan baku menurunkan produksi, meskipun tonase absolut pabrik masih kecil.
1 jam yang lalu
[SMM Analysis] Tembaga Primer Rendah Karbon Mulai Diperdagangkan Secara Terpisah—Akankah Nilai Hijau Tembaga Daur Ulang Dinilai Ulang?
1 jam yang lalu
[SMM Analysis] Tembaga Primer Rendah Karbon Mulai Diperdagangkan Secara Terpisah—Akankah Nilai Hijau Tembaga Daur Ulang Dinilai Ulang?
Baca Selengkapnya
[SMM Analysis] Tembaga Primer Rendah Karbon Mulai Diperdagangkan Secara Terpisah—Akankah Nilai Hijau Tembaga Daur Ulang Dinilai Ulang?
[SMM Analysis] Tembaga Primer Rendah Karbon Mulai Diperdagangkan Secara Terpisah—Akankah Nilai Hijau Tembaga Daur Ulang Dinilai Ulang?
[SMM Analisis: Tembaga Primer Rendah Karbon Mulai Diperdagangkan Terpisah—Akankah Nilai Hijau Tembaga Daur Ulang Dinilai Ulang?] Proyek percontohan EAC oleh BHP dan Amazon memisahkan pengurangan emisi terverifikasi dari perdagangan fisik tembaga, memberikan sumber nilai lingkungan baru bagi tembaga primer rendah emisi. Tembaga daur ulang tetap memiliki keunggulan energi yang besar, tetapi daya saing di masa depan mungkin lebih bergantung pada ketertelusuran, kandungan daur ulang, dan data karbon terverifikasi, yang berpotensi menambah dimensi lingkungan pada penetapan harga.
1 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (29 Sep)
1 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Data: Pergerakan pasar SHFE, DCE (29 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 29 Sep 2026.
1 jam yang lalu