SMM Evening Comments (Jun 18)

Telah Terbit: Jun 18, 2019 17:30
SHFE nonferrous metals extended their declines for the most part

SHANGHAI, Jun 18 (SMM) – SHFE nonferrous metals extended their declines for the most part on Tuesday June 18 with nickel leading the losses and ending 1.06% lower. Tin fell 0.72%, zinc lost 0.18%, aluminium dropped 0.11%, while copper gained 0.37%, and lead rose 0.34%. 

The ferrous complex mostly rebounded as iron ore jumped 2.14%, rebar expanded 0.27%, coking coal advanced 0.22%, hot-rolled coil rose 0.19%, while coke slid 1.58%. 

Copper: The most-liquid SHFE August contract traded rangebound with pressure from the 10-day moving average, as the market awaited results of the US Federal Reserve's interest rate meeting. It rebounded from a low of 46,220 yuan/mt near closing, and ended the trading day 0.37% higher at 46,330 yuan/mt. As the MACD red line lengthened, technical support is expected to keep the contract testing the 46,330 yuan/mt level tonight. 

Aluminium: The most-traded SHFE August contract moved away from the five-day moving average as pressure from shorts lowered it below the daily moving average to an intraday low of 13,780 yuan/mt. It lost 0.11% on the day and finished at 13,810 yuan/mt, with open interests up 7,190 lots to 255,000 lots. Fundamentals may continue to keep the contract weak tonight. 

Zinc: The most-active SHFE August contact stemmed decline at around 19,880 yuan/mt and rebounded a little to close at 19,930 yuan/mt, down 0.18% on the day. Shorts exited near closing, but expanding inventories of refined zinc provided limited confidence in longs. This, together with technical pressure above, is likely to cap any upward momentum in the contract tonight. Support from the Bollinger lower band will remain tonight. 

Nickel: Support from the Bollinger middle band prevented the most-active SHFE August contract from falling below the 97,700 yuan/mt level, after it slid below the daily moving average in the afternoon session. It lost 1.06% on the day and closed at 98,180 yuan/mt, with open interests up 1,000 lots to 231,000 lots. We see it testing support from the 20-day moving average, or the 98,000 yuan/mt level tonight. 

Lead: The most-liquid SHFE July contract continued to trade between the 20- and 40-day moving averages, as shorts accumulated at highs and bolstered the contract to 16,140 yuan/mt at closing, up 0.34% on the day. Tonight, it is expected to extend the rangebound trend along with the 10-day moving average. 

Tin: A lower LME tin grew pessimism in the market, and extended the decline in the most-traded SHFE September contract from overnight. The contract fell 0.72% on the day and ended at 143,640 yuan/mt, with open interests expanding 444 lots to 41,514 lots as shorts entered. Tonight, it is expected to test support from 143,000 yuan/mt if it fails to receive the current support from 143,500 yuan/mt. Pressure above is seen from the 10- and 20-day moving averages, or the 144,500 yuan/mt level tonight. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
16 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
16 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
19 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
19 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
19 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
19 jam yang lalu