SMM Morning Comments (Jun 11)

Telah Terbit: Jun 11, 2019 09:34 (GMT+8)
SMM Morning Comments

SHANGHAI, Jun 11 (SMM) –

Copper: An aggressive load-up of long positions bolstered three-month LME copper to a high of $5,881/mt on Monday before the contract finished the trading day 1.46% higher at $5,877/mt. As a stronger LME copper fuelled confidence among longs in Shanghai, the most traded SHFE August contract climbed to a high of 46,640 yuan/mt overnight before it closed 0.74% higher at 46,570 yuan/mt. The US-Mexico trade discussion and upbeat Chinese trade data boosted market sentiment, and lifted copper prices. Copper prices, however, continue to face the headwind from a generally strong US dollar. LME copper is expected to trade between $5,850-5,900/mt today, with SHFE copper at 46,300-46,800 yuan/mt. Spot premiums are seen lower at 80-150 yuan/mt as inflows of imports and higher prices of futures will drive sellers to lower their offers.

Aluminium: Three-month LME aluminium rebounded from an intraday low of $1,752.5/mt to close 0.94% higher at $1,777/mt on Monday. The loading up of long positions primarily accounted for the gain on the day. LME aluminium is expected to trade between $1,760-1,820/mt today. As longs added their positions, the most active SHFE July contract climbed to a high of 14,015 yuan/mt overnight before it closed 0.29% higher at 13,995 yuan/mt. It is expected to trade at 13,800-14,100 yuan/mt today, with spot premiums of 10-30 yuan/mt over the June contract.

Zinc: Resistance from the 10-day moving average and an increase of 875 mt in LME zinc inventories on Monday dragged three-month LME zinc from highs of $2,511/mt to close the trading day 0.4% lower at $2,475/mt. LME zinc is expected to remain weak today and test support from the five-day moving average, with most transactions at $2,460-2,510/mt. The most traded SHFE August contract partially recovered from earlier losses to end 0.35% lower at 20,180 yuan/mt overnight. Firm backwardation is likely to offer support to SHFE zinc, while the anticipation of higher inventories on greater supplies from Chinese smelters will likely erode upward momentum in prices. SHFE zinc is expected to consolidate between 20,000-20,500 yuan/mt today.

Nickel: Three-month LME nickel climbed to an intraday high of $11,850/mt on Monday before it relinquished much of those gains to close the trading day a tad higher at $11,625/mt. The SHFE July contract fluctuated to close 0.54% lower at 95,760 yuan/mt overnight. LME nickel is expected to trade between $11,600-11,750/mt today, with SHFE counterpart at 95,500-97,000 yuan/mt. Spot prices are seen at 96,500-98,000 yuan/mt.

Lead: Three-month LME lead recovered from earlier losses and stood above the 40-day moving average on Monday, gaining 2.2% to close at $1,881/mt. Open interest for the contract shrank 2,424 lots to 114,914 lots. It is expected to test pressure from $1,900/mt in the short term. The most active SHFE July contract opened higher at 16,300 yuan/mt overnight, but pared some gains to close 0.56% up at 16,235 yuan/mt. Investors appeared keen to sell off above 16,300 yuan/mt. This grows the possibility of a pull-back in SHFE lead if it fails to significantly gain to move out of its current range in the short run.

Tin: Three-month LME tin rallied from an intraday low of $19,100/mt to an intraday high of $19,285/mt on Monday before it erased those gains to close 0.26% lower at $19,200/mt. Support is seen at $18,700/mt while resistance is at $19,500/mt. The most traded SHFE September contract rose to a high of 144,920 yuan/mt overnight and hovered around the daily moving average to finish the session 0.73% higher at 144,740 yuan/mt. Support is seen at 143,500 yuan/mt while resistance is at 146,000 yuan/mt.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
02 Oct 2026 16:31 (GMT+8)
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
02 Oct 2026 16:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
02 Oct 2026 15:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
02 Oct 2026 15:31 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
02 Oct 2026 15:27 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
02 Oct 2026 15:27 (GMT+8)