Field investigation of Billy Hills zinc mine begins to explore large-scale zinc, lead and silver

Telah Terbit: Jun 4, 2019 16:54
The latest announcement from Mithril Resource on June 3 shows that field visits to the, Billy Hills zinc mine project will begin this week. The project is located 25 km east of the Western Australian city of Fitzroy Crossing, adjacent to the former Pillara zinc mine.

SMM6, April 4: according to the Menafn website, the latest announcement by, Mithril Resource Company on June 3 shows that the field trip of the, Billy Hills zinc mine project will begin this week.

The project is located 25 km east of the Western Australian city of Fitzroy Crossing, adjacent to the former Pillara zinc mine.

During the period from June 1997 to October 2003, the proven reserves of Pillara zinc deposit reached 18.05 million tons, with a zinc grade of 7.7% and a lead grade of 2.4%. The output of underground ore is 10.3t, the grade of zinc is 6.9%, and the grade of lead is 2.3%. But so far the project has been closed.

Historically, the grade of zinc concentrate in this area is between 57% and 63%, and the grade of lead concentrate is between 73% and 81%. So smelters used to pay high prices for lead-zinc mines in the area.

So Billy Hills zinc mine is the key project of Mithril Resource development at present, but the company believes that compared with the Pillara zinc mine, Billy Hills zinc mine project located in the same area, the company is still insufficient exploration, the company's goal is to explore large-scale zinc, lead and silver.

(note: if copyright issues are involved, please contact SMM and we will deal with "View the original text" in a timely manner)

"[investment must see] Trade friction news flying all over the metal how to win in chaos?

"Click to enter the registration page

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
11 Sep 2026 18:30
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
Baca Selengkapnya
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
Australia Tinjau Bea Antidumping Baja Galvanis dari India, Malaysia, Vietnam di Tengah Kekhawatiran Seng
Pada 9 September 2026, Australia memulai peninjauan sunset kedua atas tindakan antidumping terhadap baja lembaran galvanis dari India, Malaysia, dan Vietnam, serta secara terpisah meluncurkan peninjauan sunset atas tindakan imbalan terhadap impor dari India. Peninjauan ini mencakup periode Juli 2025–Juni 2026, dengan laporan akhir diperkirakan pada 11 Februari 2027. Karena baja galvanis merupakan sektor penggunaan akhir terbesar untuk seng, tindakan ini secara langsung memengaruhi biaya ekspor dan daya saing, yang berpotensi berdampak pada permintaan seng domestik dan rantai pasok Australia. Mempertahankan bea masuk akan memberikan perlindungan bagi kapasitas baja dan pelapisan domestik, sementara penghentian dapat meningkatkan impor berharga murah dan memengaruhi konsumsi seng regional. Hasil akhir tetap bergantung pada penetapan otoritas.
11 Sep 2026 18:30
Penawaran Bijih Terbatas Berlanjut saat Permintaan Musim Dingin Berlangsung, Pabrik Peleburan Tiongkok Membeli Impor di Tengah Biaya Pengolahan yang Rendah
11 Sep 2026 18:30
Penawaran Bijih Terbatas Berlanjut saat Permintaan Musim Dingin Berlangsung, Pabrik Peleburan Tiongkok Membeli Impor di Tengah Biaya Pengolahan yang Rendah
Baca Selengkapnya
Penawaran Bijih Terbatas Berlanjut saat Permintaan Musim Dingin Berlangsung, Pabrik Peleburan Tiongkok Membeli Impor di Tengah Biaya Pengolahan yang Rendah
Penawaran Bijih Terbatas Berlanjut saat Permintaan Musim Dingin Berlangsung, Pabrik Peleburan Tiongkok Membeli Impor di Tengah Biaya Pengolahan yang Rendah
Penawaran pasar dari pedagang bijih tetap terbatas minggu ini, sementara permintaan stok musim dingin masih berlanjut. Beberapa smelter Tiongkok terus mencari dan membeli konsentrat impor untuk kuartal keempat, dengan biaya pengolahan pasar tetap berada di level rendah.
11 Sep 2026 18:30
Tambang Seng di China Barat Laut Menawarkan Tender September pada -RMB 2.800/mt; SMM Akan Memantau Biaya Pengolahan
11 Sep 2026 18:30
Tambang Seng di China Barat Laut Menawarkan Tender September pada -RMB 2.800/mt; SMM Akan Memantau Biaya Pengolahan
Baca Selengkapnya
Tambang Seng di China Barat Laut Menawarkan Tender September pada -RMB 2.800/mt; SMM Akan Memantau Biaya Pengolahan
Tambang Seng di China Barat Laut Menawarkan Tender September pada -RMB 2.800/mt; SMM Akan Memantau Biaya Pengolahan
Menurut SMM, sebuah tambang seng di Tiongkok Barat Laut menawarkan harga tender ambil sendiri September sekitar -RMB 2.800/ton logam pekan ini. SMM akan terus memantau perubahan biaya pengolahan.
11 Sep 2026 18:30
Field investigation of Billy Hills zinc mine begins to explore large-scale zinc, lead and silver - Shanghai Metals Market (SMM)