Steel downstream activity grows slower in May

Telah Terbit: May 30, 2019 14:40 (GMT+8)
PMI slipped 7.86 from Apr to 51.1 in May

SHANGHAI, May 30 (SMM) – Activity across major steel downstream industries in China continued to expand in May, but at a slower pace due to a high base of comparison in April.

Construction remained in a high season, while manufacturing showed signs of weakening as the machinery and automobile sectors contracted.

The SMM purchasing managers’ index (PMI) for China’s construction, machinery, automobile, shipbuilding, home appliance and transportation sectors, major consumers of steel, slipped 7.86 from April to 51.1 in May. It remained above the 50-mark that separates expansion from contraction, for a third straight month. May’s reading inched up 0.13 year on year.

After seasonal adjustment, the composite PMI came in at 51.26, down 2.8 from a month ago and 0.08 from a year ago.

Production this month grew across steel downstream sectors, except for machinery and automobiles, with the sub-index standing at 51.81, down 15.1 from April and 1.68 from May 2018. Rainfall is expected to impact construction and transportation next month.

The sub-index for new orders slipped 12.98 to 52.16 in May, standing 2.15 higher than a year earlier. Overall new orders increased this month, but orders for machineries, automobiles and home appliances shrank as a low season approaches. New orders sub-index for the automobile sector fell 6.1 to 44.8 in May.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Asante memperoleh lebih banyak waktu untuk mengatur US$100 juta bagi tambang Ghana
17 jam yang lalu
Asante memperoleh lebih banyak waktu untuk mengatur US$100 juta bagi tambang Ghana
Baca Selengkapnya
Asante memperoleh lebih banyak waktu untuk mengatur US$100 juta bagi tambang Ghana
Asante memperoleh lebih banyak waktu untuk mengatur US$100 juta bagi tambang Ghana
[SMM Gold Flash] Pada 30 September 2026, Asante Gold mengumumkan bahwa para pemberi pinjaman senior, pembeli stream, dan mitra lindung nilai telah sepakat untuk memperpanjang tenggat waktu perolehan pendanaan baru minimal US$100 juta hingga 31 Oktober. Tenggat waktu untuk sertifikat biaya penyelesaian diundur menjadi 31 Maret 2027. Asante menyatakan telah menyepakati persyaratan pendanaan dengan Fujairah Holding, yang meminta waktu lebih untuk persetujuan internal. Persetujuan akhir dan penandatanganan perjanjian pendanaan masih belum rampung. Perpanjangan ini memberi Asante lebih banyak waktu untuk menangani persyaratan pembiayaan yang memengaruhi tambang emas Bibiani dan Chirano yang beroperasi di Ghana. Hal ini tidak menyelesaikan kebutuhan pendanaan: penyelesaian paket yang diusulkan merupakan tonggak penting berikutnya.
17 jam yang lalu
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
17 jam yang lalu
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
Baca Selengkapnya
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
Konstruksi awal dimulai di proyek tembaga–paladium Marathon
[SMM PGM Flash] Generation Mining telah memulai konstruksi awal di proyek tembaga–paladium Marathon di barat laut Ontario. Pekerjaan dimulai setelah perusahaan menyerahkan jaminan sebesar C$6,5 juta yang mencakup rehabilitasi lokasi tahap konstruksi. Program pekerjaan awal yang lebih luas direncanakan mencakup peningkatan jalan akses, struktur pengelolaan air, dan pasokan listrik sementara hingga akhir 2026 dan berlanjut ke 2027. Dimulainya pekerjaan ini membawa sumber paladium dan platinum potensial di Amerika Utara ke tahap pekerjaan fisik di lokasi. Studi kelayakan Generation memperkirakan sekitar 2,16 juta ons paladium yang dapat dibayarkan dan 488.000 ons platinum selama umur tambang 13 tahun; ini adalah proyeksi, bukan produksi. Perusahaan juga memperkirakan akan melakukan pembayaran peralatan awal sekitar C$30 juta, tergantung pada kontrak final dan persetujuan.
17 jam yang lalu
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
02 Oct 2026 15:49 (GMT+8)
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
Baca Selengkapnya
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
[SMM Kilasan Emas] Rancangan undang-undang pertambangan yang ditinjau Reuters pada 30 September akan memungkinkan menteri pertambangan Ghana mewajibkan perusahaan menerbitkan saham khusus gratis kepada negara dengan hak persetujuan atas transaksi besar. RUU itu akan mempertahankan kepentingan negara 10% yang ditanggung gratis dan membatasi sewa pertambangan hingga 15 tahun atau umur tambang yang diproyeksikan, mana yang lebih pendek. Rancangan itu juga akan memungkinkan aturan di masa depan yang mewajibkan pemrosesan lokal dan membatasi ekspor konsentrat yang belum diproses. Tak satu pun dari proposal ini telah diberlakukan; Reuters tidak dapat memastikan kapan rancangan itu disusun. Bagi para penambang emas Ghana, hak yang diusulkan dan sewa yang lebih pendek dapat memengaruhi pembiayaan, valuasi, dan keputusan perpanjangan. Berdasarkan rancangan itu, pemegang hak yang ada yang mencari perpanjangan akan menerima pertimbangan prioritas untuk lisensi yang setara. Perusahaan pertambangan mengharapkan konsultasi lebih lanjut sebelum pembahasan di parlemen, lapor Reuters. Kata-kata akhir dan waktunya masih belum pasti.
02 Oct 2026 15:49 (GMT+8)