SMM Morning Comments (Mar 20)

Telah Terbit: Mar 20, 2019 09:36
SMM Morning Comments

SHANGHAI, Mar 20 (SMM) – 

Copper: A unexpected drop in US crude oil inventories pulled up base metals overnight. As shorts exited after the US dollar weakened, LME copper increased to a high of $6,503/mt. It ended at $6,459/mt, with open interests down 7,059 lots to 292,000 lots. The SHFE 1905 contract tested pressure from 49,500 yuan/mt, but lingered shorts lowered it to 49,230 yuan/mt, before it ended at 49,320 yuan/mt. Today, we expect the contract to trade at 49,100-49,700 yuan/mt, with LME copper at $6,430-6,500/mt. Spot premiums are likely to hold firm at 800-1,150 yuan/mt, but trades will slow from yesterday. 

Aluminium: LME aluminium climbed to $1,944/mt after it was reported that Norsk Hydro’s aluminium smelters were hit by a cyber attack. This was before it jumped to a three-month high of $1,946/mt, and ended at $1,940/mt. The SHFE 1905 contract rallied from a low of 13,695 yuan/mt, to around the five-day moving average. It closed at 13,760 yuan/mt, after it rose to a high of 13,790 yuan/mt. It is likely to consolidate at highs today, at 13,650-13,900 yuan/mt, with its LME counterpart at $1,850-1,950/mt. Spot premiums are set at 180-220 yuan/mt today. 

Zinc: Fundamentals bolstered LME zinc to shrug off pressure from the five-day moving average, to a high of $2,815/mt. A weaker US dollar also lifted prices. A robust LME zinc supported its SHFE counterpart, as the SHFE 1905 contract climbed and ended higher overnight at 21,745 yuan/mt. Expectations of a lower VAT buoyed spot premiums, and this is likely to deter downstream purchases. Today, the 1905 contract is expected to trade at 21,600-22,000 yuan/mt, with LME zinc at $2,785-2,835/mt. 

Nickel: Higher prices of crude oil and a lower US dollar pulled up LME nickel above pressure from $13,200/mt, to a high of $13,290/mt. It closed around the 10-day moving average, at $13,155/mt, with LME nickel inventories dipping 414 mt to 190,434 mt. The SHFE 1905 contract stemmed decline at the 10-day moving average and rebounded to a high of 102,980 yuan/mt. Pressure from 103,000 yuan/mt ended it at 102,740 yuan/mt. Open interests increased by 12,000 lots, with longs accounted for the most. The contract is likely to trade at 102,000-103,500 yuan/mt today, with LME nickel at $13,100-13,300/mt. Spot prices are seen at 104,000-105,500 yuan/mt.

Lead: LME lead hovered around the daily moving average last night, as it rebounded after dipped to a low of $2,027.5/mt. The SHFE 1905 contract followed a similar pattern as it closed at 16,865 yuan/mt, after unsuccessfully tested the 16,875 yuan/mt level above. The five- and 10-day moving averages moved downwards. Pressure from shorts may limit its upward room today, and this is likely to keep LME lead below the 60-day moving average today. 

Tin: Low inventories on export restrictions of Indonesia’s tin, and a weaker US dollar buoyed LME tin to the highest overnight at $21,350/mt. It stood above the 10-day moving average and settled at $21,305/mt. The SHFE 1905 contract also moved above the 10-day moving average, and ended at 147,330 yuan/mt after it jumped to a high of 147,500 yuan/mt. Firm spot offers are likely to limit transactions and lower upward momentum in the contract today, while low inventories will underpin LME tin in the near term. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
3 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
3 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
6 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
6 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
6 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
6 jam yang lalu