Operating rates at scrap-using copper rod producers fall for 4 consecutive months

Telah Terbit: Mar 18, 2019 15:59
Rates fell 5.83 percentage points from Jan to stand at 44.47% in Feb

SHANGHAI, Mar 18 (SMM) – Operating rates across Chinese manufacturers that produce copper rods with copper scrap fell 5.83 percentage points from January to stand at 44.47% in February, marking the fourth straight month of declines, an SMM survey showed.

Producers scaled back operations or closed around the Chinese New Year holiday. This accounted for lowered operating rates in January-February. The holiday impact was significant this year as the copper scrap sector suspended for a longer period.

Copper rod producers with scrap as feedstock operated at lower levels at the end of last year as narrow spreads between copper cathode and copper scrap hampered consumption of copper scrap.

However, excluding the seasonality factor, the copper scrap market experienced a brisk February. With strong copper prices, the discounts of copper scrap against copper cathode widened from 888 yuan/mt to 1,551 yuan/mt last month. This improved the appeal of copper scrap and recovered consumption. As profit margins widened, copper scrap sellers who withheld from selling before the CNY break on weak copper prices were keen to let their cargoes go.

The average operating rate across Chinese manufacturers that produce copper rods with scrap is expected to rebound 23.59 percentage points month on month to 68.07% in March. This would be the highest since May 2018.

While copper prices came off from earlier highs in March, the spreads between copper cathode and copper scrap remained above 1,200 yuan/mt while the spreads between copper rods with copper cathode and copper scrap as feedstock stood at around 1,000 yuan/mt.

As consumption recovery lowers inventories at producers, orders for scrap-using copper rods substantially improved, SMM learned.

Robust demand for scrap-made copper rods is set to erode demand for copper cathode-made rods with operating rates across copper rods producers with copper cathode as raw materials falling 3 percentage points in March.

Strong consumption of copper scrap also accounted for growing copper inventories across the nation.

Industrial concentration would be another driver that lifts operating rates across copper rod producers with copper scrap as feedstock in March as the government’s continued firm environment protection initiatives vex small producers.

Some small scrap-made copper rod producers who located in regions near Beijing have been required to cut or suspend production as the two sessions took place in the capital city. SMM learned that they have yet to be allowed to resume production and might shut for good.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
11 jam yang lalu
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Baca Selengkapnya
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Pada 12 September pukul 9:58, tungku peleburan inti sistem pirometalurgi di proyek pemulihan multi-logam Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd. berhasil dinyalakan, secara resmi memasuki tahap pengeringan tungku dan menandai langkah kunci menuju commissioning dan produksi seluruh lini. Informasi publik menunjukkan bahwa proyek peningkatan teknologi pemulihan komprehensif bijih emas-perak polimetalik kompleks, relokasi, dan perluasan Yingkou Jianfa Shenghai menggunakan konsentrat tembaga sebagai bahan baku utama, dengan kapasitas terencana keseluruhan 600.000 ton/tahun katoda tembaga yang akan dibangun dalam dua fase, dengan kapasitas 300.000 ton/tahun per fase. Fase I dirancang untuk memproduksi 300.000 ton/tahun katoda tembaga dan 1,18 juta ton/tahun asam sulfat, beserta sistem pendukung untuk peleburan, konversi, pemurnian anoda, elektrolisis, benefisiasi terak, dan pemulihan logam mulia. Setelah penyalaan ini, proyek akan melaksanakan pengeringan tungku terstandarisasi dan uji coba terpadu kondisi panas di seluruh sistem untuk memverifikasi peralatan, instrumen, interlock, dan sistem kontrol otomatis. Proyek ini belum secara resmi memulai pengumpanan bahan baku dan produksi; setelah pengeringan tungku dan commissioning sistem selesai, akan dilanjutkan dengan commissioning kapasitas katoda tembaga 300.000 ton/tahun Fase I. Jika proyek berhasil mulai berproduksi, diharapkan dapat meningkatkan kapasitas peleburan tembaga di Tiongkok Utara dan semakin mendorong permintaan domestik akan bahan baku konsentrat tembaga.
11 jam yang lalu
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
12 Sep 2026 01:13
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Baca Selengkapnya
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Alchemy Resources mengumumkan pada 11 September bahwa pengeboran sirkulasi balik telah dimulai di proyek Yellow Mountain dan Overflow di New South Wales, Australia, dengan hingga 15 lubang direncanakan selama kampanye eksplorasi terbaru. Di proyek Yellow Mountain yang 80% dimilikinya, pengeboran akan menguji perluasan mineralisasi tembaga-emas dan polimetalik yang telah diidentifikasi sebelumnya, serta dua target geofisika yang belum pernah dibor sebelumnya. Pengeboran sebelumnya di Yellow Mountain menghasilkan irisan sepanjang 113 meter dengan kadar setara tembaga 1,17%, terdiri dari 0,33% tembaga, 0,37 g/t emas, 24,3 g/t perak, 0,86% timbal, dan 1,23% seng. Kampanye pengeboran terbaru dirancang untuk menguji apakah sistem mineralisasi yang diketahui meluas ke area target yang baru diidentifikasi. Program ini juga akan mencakup pengeboran di proyek Overflow, di mana Alchemy menargetkan perluasan mineralisasi yang ada di sepanjang jurus dan di kedalaman. Overflow saat ini memiliki sumber daya mineral terindikasi sekitar 342.000 ons setara emas dan mengandung mineralisasi emas, perak, tembaga, timbal, dan seng. Dimulainya pengeboran memberikan uji jangka pendek terhadap skala dan kontinuitas mineralisasi di Yellow Mountain. Irisan tembaga-emas-polimetalik lebar yang dilaporkan sebelumnya menunjukkan potensi sistem mineralisasi yang cukup besar, sementara target geofisika yang baru ditetapkan memberikan potensi eksplorasi tambahan. Hasil pengeboran akan menjadi penting dalam menentukan apakah jejak mineralisasi dapat diperluas secara material.
12 Sep 2026 01:13
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
12 Sep 2026 01:10
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
Baca Selengkapnya
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
Chief Executive Officer Freeport-McMoRan Kathleen Quirk mengindikasikan bahwa perusahaan berharap dapat melanjutkan rencana perluasan tambang tembaga Bagdad di Arizona, menandakan komitmen yang lebih kuat terhadap proyek tersebut menjelang keputusan investasi formal. Berbicara di Jefferies Global Industrials Conference pada 10 September, Quirk mengatakan proyek tersebut masih memerlukan masukan dari dewan direksi Freeport, tetapi ia memperkirakan perusahaan akan melanjutkannya. Ia menggambarkan perluasan tersebut sebagai proyek konstruksi sekitar tiga tahun dan mencatat bahwa tidak ada hambatan perizinan besar yang diperkirakan. Estimasi proyek terbaru Freeport menempatkan belanja modal untuk perluasan Bagdad sekitar US$4,5 miliar, sekitar 30% di atas estimasi sebelumnya sebesar US$3,5 miliar, mencerminkan kenaikan biaya, perubahan lingkup, dan rekayasa tambahan. Proyek tersebut akan lebih dari dua kali lipat meningkatkan kapasitas konsentrator di Bagdad dan diperkirakan menambah sekitar 200–250 juta pon, atau sekitar 91.000–113.000 ton, produksi tembaga per tahun, bersama dengan tambahan 10–12 juta pon molibdenum. Bagdad saat ini memiliki umur cadangan lebih dari 80 tahun. Pengajuan regulasi Q2 2026 Freeport telah menggambarkan proyek tersebut sedang dipersiapkan untuk kemungkinan keputusan investasi pada paruh kedua 2026. Komentar terbaru ini dengan demikian merupakan sinyal yang lebih positif dari manajemen mengenai kemungkinan pengembangan, meskipun persetujuan dewan formal belum diumumkan. Keputusan untuk melanjutkan Bagdad akan menjadi salah satu investasi pertumbuhan tembaga jangka pendek Freeport yang paling signifikan di AS. Potensi penambahan lebih dari 90.000 ton tembaga per tahun akan meningkatkan output AS Freeport secara material, meskipun produksi pertama masih beberapa tahun lagi mengingat periode konstruksi yang diperkirakan. Perhatian kini akan beralih ke persetujuan dewan formal dan keputusan investasi akhir.
12 Sep 2026 01:10