SMM Morning Comments (Mar 7)

Telah Terbit: Mar 7, 2019 09:36
SMM Morning Comments

SHANGHAI, Mar 7 (SMM) –

Copper: Concerns over slower US economic growth and a higher US dollar for six consecutive trading days weighed on copper prices overnight. LME copper dipped to a low of $6,439/mt before it closed at $6,455/mt. The SHFE 1905 contract also fell to the lowest overnight at 49,350 yuan/mt near closing, after it fell below the daily moving average from a high of 49,630 yuan/mt. Today, the contract is likely to trade at 49,300-49,700 yuan/mt, with LME copper at $6,435-6,495/mt. Spot offers are seen at a discount of 80 yuan/mt to a premium of 40 yuan/mt today as a seasonal lull may continue to expand spot discounts. 

Aluminium: As longs exited and the US dollar remained robust, LME aluminium unsuccessfully tested pressure above and dropped to a low of $1,860/mt. It settled at $1,862.5/mt, with open interests down 3,711 lots to 660,000 lots. The SHFE 1905 contract fell below all moving averages to a low of 13,465 yuan/mt as most base metals weakened. It is likely to trade at 13,350-13,650 yuan/mt, with its LME counterpart at $1,840-1,890/mt today. Spot discounts are set at 70-30 yuan/mt. 

Zinc: Continued decline in LME zinc inventories provided upward momentum in prices, which climbed to a high of $2,803.5/mt. With pressure from a steady US dollar, LME zinc failed to stand firm above the $2,800/mt level, and ended at $2,784.5/mt. Heavy resistance above is likely to see it at $2,760-2,810/mt today. Last night, the dominant contract transferred to the SHFE 1905 contract, which received a boost from its higher LME counterpart, and closed higher at 21,710 yuan/mt after rose to highs around 21,800 yuan/mt. Without any significant improvement in downstream demand, the contract is likely to trade at 21,500-21,900 yuan/mt today. 

Nickel: As base metals ended mostly lower overnight, the SHFE 1905 contract lost 0.35% to close at 105,670 yuan/mt, with LME nickel down 0.11% to $13,635/mt. In the domestic spot market, discounts of nickel pig iron over refined nickel expanded. Despite an increase in prices of stainless steel, tepid purchases will limit its upward room today. We expect the SHFE 1905 contract to weaken to 105,000-105,800 yuan/mt, with spot prices at 106,400-107,300 yuan/mt today. 

Lead: A weaker SHFE 1904 contract dragged LME lead, which slid to a low of $2,087.5/mt, but found support at the 10-day moving average. The SHFE 1904 contract registered the fourth consecutive trading day of decline, as it closed at 17,510 yuan/mt, after fell to a low of 17,470 yuan/mt. We expect it to continue to moderate today. 

Tin: A buildup of 200 mt in LME tin inventories and pressure above from the five-, and 10-day moving averages depressed LME tin to a low of $21,400/mt, after it climbed to a high of $21,550/mt. Support below is set at $21,300/mt today. The SHFE 1905 contract consolidated around the daily moving average, with resistance from the 40-day moving average. It will maintain the rangebound trend with support at 147,500 yuan/mt, and pressure at 150,000 yuan/mt today. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
14 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
14 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
18 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
18 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
18 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
18 jam yang lalu