China’s daily output of alumina dips in Jan

Telah Terbit: Feb 15, 2019 16:12 (GMT+8)
China produced some 2.97 million mt of primary aluminium in Jan, down 0.7% from Dec

SHANGHAI, Feb 15 (SMM) – In January, China's production of alumina (metallurgical grade) registered 6.13 million mt, up 7.4% from a year ago, with average daily output at 198,000 mt, 1,000 mt lower on the month.  

Gas installation issues at Chiping Xinfa, rectifications for ultra-low emission at Chinalco Huaxing, and environmental renovation on furnaces at Shanxi refinery affected daily production. Chinalco Shanxi produced in lower gears last month, and environmental curbs in Henan province affected local output. 

In Shanxi, Henan, and Inner Mongolia, tight supply of natural gas in heating season also accounted for overall lower production in January. 

SMM expects average daily output of alumina in February to rise 2,000 mt from January to 200,000 mt, as some refineries stepped up operation during Chinese New Year after the environmental impact waned. Shandong Xinfa resumed regular production this month and maintenance in the south-west ended by the end of January. This is estimated to generate 5.61 million mt of alumina output in February, up 10.5% from February 2018. 

China produced some 2.97 million mt of primary aluminium in January, down 0.5% from January 2018, and down 0.7% from December. By the end of January, domestic primary aluminium capacity under operation stood at an annualised 34.96 million mt, down 270,000 mt/year from December. 

Despite new capacity in Inner Mongolia’s Chuangyuan and Guyang smelters, capacity cuts at Shaanxi Hengkang, Shandong Huayu, Shanxi Huasheng, and Shanxi Huaze continued to lower operating capacity last month. 

For February, SMM expects fewer working days to lower China’s output of primary aluminium to 2.7 million mt, down 1.1% from a year earlier. By the end of February, domestic primary aluminium capacity under operation is forecasted at an annualised 35.14 million mt. 

Unfulfilled capacity in 2018, as well as new and replacement capacity in Inner Mongolia, Guangxi, Shaanxi and Yunnan will continue to enter operation in February. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
02 Oct 2026 10:52 (GMT+8)
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Baca Selengkapnya
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Sumber pasar melaporkan: South32 merevisi penawaran Premium CIF MJP Q4 '26 menjadi US$265/mt, turun dari US$325/mt. Berlaku hingga 5 Oktober 2026.
02 Oct 2026 10:52 (GMT+8)
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
01 Oct 2026 17:48 (GMT+8)
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Baca Selengkapnya
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Harga ADC 12 India tetap relatif stabil meskipun harga aluminium LME 3 bulan turun 1,2% antara 24 dan 30 September.
01 Oct 2026 17:48 (GMT+8)
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
01 Oct 2026 17:09 (GMT+8)
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Baca Selengkapnya
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto mengumumkan pada 1 Oktober bahwa mereka telah mencapai kesepakatan dengan Pemerintah Tasmania, Pemerintah Persemakmuran Australia, dan Hydro Tasmania untuk memperpanjang pasokan listrik ke smelter aluminium Bell Bay hingga akhir 2031. Kedua pemerintah juga akan memberikan paket dukungan gabungan sebesar A$200 juta selama lima tahun, masing-masing menyumbang A$100 juta. Ketentuan komersial dari perjanjian listrik tersebut tidak diungkapkan. Bell Bay memproduksi sekitar 190.000 ton aluminium primer per tahun, sementara kontrak listriknya yang ada akan berakhir pada akhir 2026. Kesepakatan ini menghilangkan ketidakpastian operasional langsung smelter tersebut. Bell Bay menjadi smelter aluminium besar ketiga di Australia yang menerima dukungan yang didukung pemerintah pada 2026, setelah Boyne dan Tomago, menyoroti tekanan berkelanjutan dari biaya listrik yang tinggi dan persaingan internasional.
01 Oct 2026 17:09 (GMT+8)