SMM Evening Comments (Dec 18)

Telah Terbit: Dec 18, 2018 17:27
SMM Evening Comments

SHANGHAI, Dec 18 (SMM) – SHFE nonferrous metals ended mixed on Tuesday as zinc jumped 0.77%, aluminium grew 0.7%, nickel went up 0.41%, while tin lost 0.91%, copper fell 0.35%, and lead slid 0.65%.  

The ferrous complex declined for the most part as coke slumped 2.24%, hot-rolled coil dropped 0.26%, and rebar dipped 0.06%. 

Copper: The SHFE 1902 contract lost support at all moving averages, pressured by a weaker LME copper at noon. It also lost support at the 49,000 yuan/mt level as it dipped to an intraday low of 48,870 yuan/mt several times near closing. The contract ended at 48,930 yuan/mt, with open interests up 4,402 lots to 179,000 lots. Tonight, we expect it to test support at 49,000 yuan/mt. 

Aluminium: Production cuts at smelters started to tighten supplies of aluminium ingots in the market. This, coupled with large-scale purchases by traders this week, buoyed confidence across longs in the SHFE 1902 contract. The contract rebounded from a low of 13,700 yuan/mt, and rose along the five-day moving average to settle 95 yuan/mt higher on the day at 13,740 yuan/mt. Its KDJ indicator expanded upwards with the K-line breaking resistance at the 10- and 20-day moving average. The contract may manage to stand firm above the five-day moving average tonight. 

Zinc: The SHFE 1902 contract received support at 21,000 yuan/mt when longs pulled it to an intraday high of 21,220 yuan/mt after opening. Slower consumption failed to support it firmly above the daily moving average in the afternoon. A lower LME zinc during the European trading session also weighed on the contract, which settled at 21,030 yuan/mt, with open interest losing 12,634 lots. We expect the contract to hover weakly below 21,000 yuan/mt tonight. 

Nickel: The SHFE 1905 contract faced continuing pressure at the daily moving average, as it stopped increase at 90,890 yuan/mt in the morning. Exiting longs dragged it to an intraday low of 90,320 yuan/mt. However, with support at 90,300 yuan/mt, it ended 370 yuan/mt higher on the day at 90,610 yuan/mt, with open interests down some 13,000 lots. As its KDJ indicator expanded upwards and the MACD red line lengthened, we expect the contract to test support at the five-day moving average tonight.

Lead: The dominant contract moved from the 1901 to 1902 contract today, whose open interests increased 6,148 lots to 44,760 lots, with shorts accounting for most of the gains. This lowered the SHFE 1902 contract by 105 yuan/mt on the day at 17,930 yuan/mt. With support at the 60-day moving average, it is expected to test resistance at the five-day moving average tonight.  

Tin: The SHFE 1905 contract traded rangebound as it rebounded at noon after it dipped to lows around 146,250 yuan/mt in the morning. It settled 610 yuan/mt lower on the day at 146,210 yuan/mt. It will continue to trade rangebound tonight. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
3 jam yang lalu
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Baca Selengkapnya
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
Peningkatan Ekonomi Tambang Polimetalik Boumadine di Maroko
3 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
6 jam yang lalu
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Baca Selengkapnya
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
Greenland Mines Menyelesaikan Program Pengambilan Sampel Curah 104,8 Ton di Proyek PGM Skaergaard
[SMM Flash] Greenland Mines telah menyelesaikan program pengambilan sampel curah seberat 104,8 ton di tujuh lokasi pada proyek paladium-platina-emas Skaergaard di Greenland Timur. Sampel-sampel tersebut sedang disiapkan untuk uji metalurgi skala besar dan skala percontohan di GTK Mintec di Finlandia, sementara perusahaan melanjutkan studi rekayasa, pemrosesan, infrastruktur, dan pengelolaan limbah yang bertujuan untuk memajukan evaluasi teknis proyek. Sumber daya S-K 1300 Skaergaard saat ini mencakup sekitar 15,0 juta ons PdEq Terindikasi dan 17,49 juta ons PdEq Tereka, menurut Greenland Mines. Program pengujian curah ini merupakan langkah penting dalam mengevaluasi opsi pemrosesan dan perolehan kembali untuk salah satu sistem paladium-platina-emas besar yang belum dikembangkan di luar wilayah pasokan utama Afrika Selatan, Zimbabwe, dan Rusia. Namun, Sumber Daya Mineral yang dilaporkan bukanlah Cadangan Mineral dan program terbaru ini bukan merupakan keputusan pengembangan atau produksi komersial.
6 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
6 jam yang lalu
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Baca Selengkapnya
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
Two Rivers Memajukan Pekerjaan Validasi untuk Proyek Merensky, Potensi Output 182.000 ons 6E per Tahun
[SMM Flash] Two Rivers, perusahaan patungan PGM Afrika Selatan antara African Rainbow Minerals dan Impala Platinum, sedang memajukan pekerjaan validasi teknis untuk proyek Merensky di sisi timur Kompleks Bushveld. Modal untuk pekerjaan awal telah disetujui selama FY2026 untuk menyelesaikan studi yang diperlukan guna menentukan langkah ke depan proyek tersebut. Konsentrator Merensky telah diresmikan selama enam bulan hingga Desember 2024 tetapi kemudian ditempatkan dalam status perawatan dan pemeliharaan di tengah kondisi pasar PGM yang menantang. Proyek ini memiliki biaya modal yang dinyatakan sekitar R7,3 miliar dan dirancang untuk memproduksi sekitar 182.000 ons PGM 6E per tahun pada kondisi stabil, bersama dengan sekitar 1.600 ton nikel per tahun dan 1.300 ton tembaga per tahun. Oleh karena itu, dimulainya kembali operasi dapat memberikan pasokan PGM tambahan yang berarti dari operasi Afrika Selatan yang sudah ada. Namun, proyek ini masih dalam tahap validasi teknis dan belum ada tanggal dimulainya kembali atau keputusan akhir untuk melanjutkan produksi yang diumumkan.
6 jam yang lalu
SMM Evening Comments (Dec 18) - Shanghai Metals Market (SMM)