Support at 18,000 yuan/mt for SHFE lead to be broken in 2019

Telah Terbit: Dec 05, 2018 16:10 (GMT+8)
Support is likely to wane when secondary lead capacity expansion eases tight supplies

SHANGHAI, Dec 5 (SMM) – Strong support at the 18,000 yuan/mt level for SHFE lead is likely to wane in 2019 when secondary lead capacity expansion eases supply tightness across the Chinese market.

In the fourth quarter of the year, SHFE lead bargain-hunters appeared keen to purchase at the 18,000 yuan/mt level, which is the cost for smelters to produce a tonne of secondary lead.

High battery scrap prices, bolstered by supply shortages and high battery prices, kept costs across secondary refined lead smelters at 18,000 yuan/mt in 2018.

The ratio of finished goods inventory to sales remained low across secondary lead smelters. This, together with low social inventories of primary lead, kept the lead market being tightly supplied.

Output cuts at secondary lead smelters that would begin when lead prices fall below 18,000 yuan/mt could tighten supplies across the market in a short time. Price spreads with primary materials would narrow and spot premiums would remain high.

With new secondary lead capacity coming online in 2019, secondary lead stocks across smelters and social inventories of primary lead are expected to climb from current lows. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
25 Sep 2026 14:32 (GMT+8)
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
25 Sep 2026 14:32 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
25 Sep 2026 08:02 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Baca Selengkapnya
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
[SMM Analisis] Menjelang Festival Pertengahan Musim Gugur dan Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada tahun 2026? SMM, 25 September: Menurut pemberitahuan Kantor Umum Dewan Negara tentang pengaturan hari libur tahun 2026, libur Festival Pertengahan Musim Gugur tahun ini berlangsung dari 25 hingga 27 September, total 3 hari; libur Hari Nasional berlangsung dari 1 hingga 7 Oktober, total 7 hari......
25 Sep 2026 08:02 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Baca Selengkapnya
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)