SMM Evening Comments (Aug 17)

Telah Terbit: Aug 17, 2018 18:12 (GMT+8)
SMM Evening Comments

SHANGHAI, Aug 17 (SMM) – Nonferrous metals saw mixed trades as SHFE nickel led the gains and closed 1.5% higher. While tin and aluminium inched up, copper dipped, lead fell 0.87%, and zinc lost over 1%.

The ferrous complex rose across the board. Coke soared 7.8%, rebar jumped 3.5%, coking coal increased nearly 2%, hot-rolled coil gained 1.4%, and iron ore grew 1.3%. 

Copper: The SHFE 1810 contract extended its rangebound trend from last night. This came after the contract rebounded above the 48,000 yuan/mt level overnight on eased market sentiment from a potential China-US trade talk. A stronger LME copper buoyed the contract to a high of 47,970 yuan/mt in the afternoon, but fell fast near closing as shorts rose. It lost 10 yuan/mt from Thursday to close at 47,700 yuan/mt. We forecast it to hover below 48,000 yuan/mt tonight. Investors would take more guidance tonight from the eurozone’s consumer price index for July.

Aluminium: Amid continued macroeconomic uncertainty, the SHFE 1810 contract failed to stand firm at highs after testing pressure above several times. While it jumped to a high of 14,525 yuan/mt in the morning, declining longs dragged it down sharply in the afternoon to a low of 14,385 yuan/mt. The 14,400 yuan/mt level provided some support. We expect the contract to test pressure at the 10-day moving average above tonight. 

Zinc: The SHFE 1810 contract received support at noon as data showed that zinc inventories across three major Chinese markets shrank some 16,200 mt over the week. With pressure from shorts, it then dipped from a high of 20,130 yuan/mt, and lost all the gains during the day to close at 19,680 yuan/mt. Open interests surged 13,656 lots to 235,000 lots.  The contract may trade weakly rangebound tonight as shorts continue to exert pressure.

Nickel: As market sentiment improved on news that Beijing and Washington will resume trade talks later this month, the SHFE 1811 contract climbed to a high of 111,080 yuan/mt. With pressure from the five-day moving average and a weakened LME nickel, the contract dipped in the afternoon and closed at 110,090 yuan/mt. Some 125 million yuan of capital left across all SHFE nickel contracts, topping base metals. As the KDJ indicators expanded upwards and the MACD green line lengthened, the contract is likely to trade around 110,500 yuan/mt tonight. 

Lead: The dominant contract moved from the SHFE 1809 to the 1810, which touched a low of 17,270 yuan/mt as most base metals weakened in the afternoon. It closed at 17,345 yuan/mt with open interests up 1,778 lots to 48,128 lots. With heavy pressure above, the contract may consolidate at lows in the near term. 

Tin: The SHFE 1809 contract hovered at lows during the day with pressure from several moving averages above. Lacking upward momentum, it is expected to receive support at 141,000 yuan/mt and meet resistance at 144,000 yuan/mt. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
56 menit yang lalu
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Baca Selengkapnya
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Kobrea Exploration Corp. mengumumkan persetujuan program eksplorasi 2026/27 senilai US$4 juta untuk Distrik Pertambangan Malargüe Barat di Provinsi Mendoza, Argentina, yang sepenuhnya didanai oleh BHP. Program ini mencakup pengeboran inti di target porfiri tembaga-emas-molibdenum El Destino, survei polarisasi terinduksi di El Destino dan KBX-17, serta pemetaan geologi, pengambilan sampel geokimia, dan pekerjaan hiperspektral. Aliansi eksplorasi ini mencakup tujuh proyek dengan total luas sekitar 733 kilometer persegi, tempat anomali geokimia tembaga, emas, dan molibdenum telah teridentifikasi. Analisis SMM: persetujuan anggaran baru mengubah kemitraan BHP-Kobrea dari kerangka aliansi menjadi fase pengeboran aktif. Namun, properti tersebut masih berada pada tahap eksplorasi awal, tanpa molibden
56 menit yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
57 menit yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Baca Selengkapnya
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Glencore berencana menyerahkan laporan dampak lingkungan untuk proyek tembaga-molibdenum El Pachón di Argentina pada kuartal I 2027 dan menargetkan persetujuan di bawah Rezim Insentif untuk Investasi Besar, atau RIGI, sebelum Juli 2027. Glencore sebelumnya melaporkan sekitar 6 miliar ton sumber daya mineral dengan kadar rata-rata 0,43% tembaga, 2,2 g/t perak, dan 130 g/t molibdenum, setara dengan sekitar 0,013% Mo. Berdasarkan tonase dan kadar rata-rata yang diungkapkan, sumber daya tersebut mengandung sekitar 780.000 ton molibdenum in-situ, meskipun ini tidak mewakili cadangan, logam yang dapat diperoleh kembali, atau produksi di masa depan. Selama musim eksplorasi 2025/26, proyek ini menyelesaikan 53 lubang bor dengan total 21.246 meter dan memajukan infrastruktur awal jalan dan jembatan.
57 menit yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
1 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Baca Selengkapnya
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Glencore mengumumkan bahwa proyek Agua Rica, yang dikenal sebagai MARA, telah menerima persetujuan di bawah Rezim Insentif untuk Investasi Besar Argentina, atau RIGI. Deposit tembaga-emas-perak-molibdenum skala besar ini mengandung sekitar 1,2 miliar ton sumber daya mineral terukur dan terindikasi dengan kadar rata-rata 0,03% molibdenum. Berdasarkan tonase dan kadar yang diungkapkan, sumber daya tersebut mengandung sekitar 360.000 ton molibdenum in-situ; namun, ini tidak mewakili cadangan, logam yang dapat dipulihkan, atau produksi molibdenum di masa depan. Glencore juga memajukan perkiraan produksi pertama dari restart Alumbrera menjadi H2 2027 dari sebelumnya H1 2028. Infrastruktur pemrosesan, logistik, dan tenaga kerja Alumbrera diharapkan dapat mendukung pengembangan MARA di masa depan. Analisis SMM: Persetujuan RIGI meningkatkan kepastian fiskal dan regulasi proyek, tetapi belum ada keputusan investasi final, rencana pemulihan molibdenum, atau panduan produksi molibdenum yang diumumkan, sehingga tidak ada dampak langsung dalam jangka pendek terhadap pasokan molibdenum.
1 jam yang lalu