SMM Evening Comments (Aug 2)

Telah Terbit: Aug 02, 2018 17:51 (GMT+8)
SMM Evening Comments

SHANGHAI, Aug 2 (SMM) – Nonferrous metals dipped across the board on Thursday August 2 with SHFE nickel leading the losses and closing over 2.5% lower. Aluminium lost 1.3%, copper fell 1.2%, and lead declined 1%. Zinc and tin inched down. 

The ferrous complex saw mixed trading as coke led the gains and rose over 2%. Rebar and hot-rolled coil dipped over 1%, while iron ore fell slightly, and coking coal went flat. 

Copper: The SHFE 1809 contract tumbled to a low of 48,740 yuan/mt in the afternoon as shorts soared on a stronger US dollar index. The US dollar gained on expectations of further interest rate hikes by the Federal Reserve and higher-than-expected US employment data. Prices of copper may face further pressure if the US decides to raise tariffs to 25% on $200 billion of Chinese goods. After workers at BHP Billiton’s Escondida mine rejected the company’s wage offer on Thursday, a 30-day strike could occur if government intervention fails. The 1809 contract is expected to test support at the daily moving average tonight. Investors would take more guidance tonight from the US initial jobless claims last week, factory orders and durable goods orders in June.

Aluminium: Rising shorts dragged the SHFE 1809 contract to the lowest level in two weeks, at 14,245 yuan/mt. Cost and the daily moving average provided support and the contract rebounded to around 14,330 yuan/mt, and closed at 14,320 yuan/mt. Open interests decreased 14,806 lots to 242,150 lots during the day. Market participants should monitor the development of trade tariffs between China and the US tonight. 

Zinc: The SHFE 1809 contract slumped below the 20-day moving average in the afternoon as investors added their shorts and cut longs. It received support at the 21,000 yuan/mt level after it fell to a low of 21,080 yuan/mt. Rising longs then buoyed it but it failed to break pressure at the Bollinger middle band, and closed at 21,455 yuan/mt, some 30 yuan/mt lower from Wednesday. We forecast it to test resistance at the Bollinger middle band tonight. 

Nickel: The SHFE 1809 contract weakened in the morning and extended its losses in the afternoon. It then reversed some losses as the low levels in close to two years of LME and SHFE inventories provided limited support to shorts. But it met pressure at its daily moving average and edged down, closing at 110,540 yuan/mt. A total of 413 million yuan flowed out of the nickel complex today, topping the nonferrous metals. Technically, its KDJ converged and expanded downwards while the MACD red line shortened. We expect the contract to trade rangebound around 110,500 yuan/mt tonight. Market participants tonight can take some cues from US initial jobless claims last week, factory orders and durable goods orders in June.

Lead: Amid bearish sentiment, the SHFE 1809 contract tumbled to 18,190 yuan/mt after it hovered around 18,335 yuan/mt. It then consolidated and closed at 18,240 yuan/mt. The contract has kept some distance with its all moving averages above and its five- and 10-day moving averages shaped a death cross. We expect the contract to remain rangebound and continue its weak performance tonight.

Tin: As longs exit, the SHFE 1809 contract fell after it climbed to a high of 147,760 yuan/mt. It lost 290 yuan/mt from Wednesday to close at 147,150 yuan/mt, with open interests down 942 lots to 22,636 lots. We see it trading with pressure tonight with support at 145,000 yuan/mt. 

 

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
02 Oct 2026 16:31 (GMT+8)
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
Baca Selengkapnya
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 meluncurkan ekspansi Sierra Gorda senilai US$725 juta, meningkatkan kapasitas tembaga 26%
KGHM dan South32 telah memulai pembangunan jalur penggilingan keempat di tambang tembaga-molibdenum Sierra Gorda di wilayah Atacama, Chili. Ekspansi senilai US$725 juta ini berlangsung selama tiga tahun mulai Januari 2027, dengan penyelesaian pada akhir 2029 dan produksi penuh pada paruh kedua 2030. Kapasitas pemrosesan bijih meningkat 26%, dari 131.000 ton per hari menjadi 165.000 ton per hari. Produksi tembaga tahunan diproyeksikan naik dari 165.000 ton pada 2025 menjadi 195.000 ton, dengan produk sampingan 6.000 ton molibdenum, 58.000 ons emas, dan 1,7 juta ons perak. Proyek ini menciptakan lebih dari 900 lapangan kerja langsung dan didanai dari arus kas operasional serta utang. Biaya operasional per unit diperkirakan turun sekitar 10%.
02 Oct 2026 16:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
02 Oct 2026 15:31 (GMT+8)
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Baca Selengkapnya
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Memperpanjang Tinjauan Akhir PFS Iberian Belt West, Rilis Diharapkan dalam Beberapa Minggu Mendatang
Emerita Resources memberikan perkembangan terbaru mengenai Studi Kelayakan Awal (PFS) untuk proyek polimetalik Iberian Belt West di Spanyol, menyatakan bahwa studi tersebut telah berjalan jauh namun masih dalam tinjauan teknis akhir. Perusahaan menyampaikan bahwa proses tinjauan telah diperluas untuk mencakup pengawasan teknis dan jaminan kualitas tambahan sebelum dipublikasikan. Akibatnya, Emerita kini memperkirakan PFS akan dirilis dalam beberapa minggu mendatang, bukan dalam jangka waktu yang sebelumnya diindikasikan. Iberian Belt West memiliki mineralisasi tembaga, seng, timbal, emas, dan perak serta merupakan salah satu aset utama Emerita pada tahap pengembangan di Spanyol. PFS diharapkan memberikan rincian terbaru mengenai rencana tambang yang diusulkan, konfigurasi pemrosesan, kebutuhan modal, biaya operasional, dan keekonomian proyek. Emerita menyatakan bahwa pekerjaan tinjauan tambahan dimaksudkan untuk memastikan konsistensi dan kelengkapan di seluruh disiplin teknis yang berkontribusi pada studi tersebut sebelum difinalisasi. Perusahaan tidak mengumumkan tanggal publikasi spesifik yang direvisi, dan tidak ada angka produksi, modal, atau keekonomian baru yang diungkapkan dalam pembaruan terbaru. Perpanjangan tinjauan menunda tonggak teknis utama berikutnya untuk Iberian Belt West, tetapi perusahaan terus mengindikasikan bahwa PFS hampir selesai. Bagi pasar tembaga, signifikansi studi tersebut akan bergantung pada profil produksi dan keekonomian proyek yang akhirnya diungkapkan, terutama kontribusi tembaga relatif terhadap logam berbayar lainnya dalam proyek. Oleh karena itu, perhatian akan tetap tertuju pada waktu rilis PFS dan apakah studi akhir secara material mengubah prospek pengembangan proyek.
02 Oct 2026 15:31 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
02 Oct 2026 15:27 (GMT+8)
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Baca Selengkapnya
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Menembus 75,55 m dengan Kadar 1,19% Cu di Proyek Tembaga-Emas Carmacks
Cascadia Minerals telah melaporkan hasil pengeboran tambahan dari program eksplorasi 2026 di proyek tembaga-emas Carmacks di Yukon, Kanada, dengan pengeboran step-out baru yang memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral yang ada. Lubang bor CD-26-058 menghasilkan 75,55 meter dengan kadar 1,19% tembaga, 0,97 g/t emas, 10,4 g/t perak, dan 335 ppm molibdenum, setara dengan 2,18% ekuivalen tembaga. Interval tersebut mencakup 48,66 meter dengan kadar 1,61% tembaga, 1,39 g/t emas, 15,1 g/t perak, dan 475 ppm molibdenum, setara dengan 3,03% CuEq. Di dalam lubang yang sama, interval berkadar lebih tinggi sepanjang 14,50 meter menghasilkan 2,30% tembaga, 2,68 g/t emas, 29,5 g/t perak, dan 1.015 ppm molibdenum, setara dengan 5,08% CuEq. Lubang kedua, CD-26-059, memotong 93,99 meter dengan kadar 0,96% tembaga, 0,70 g/t emas, 4,6 g/t perak, dan 919 ppm molibdenum, setara dengan 1,94% CuEq. Ini mencakup 63,97 meter dengan kadar 1,26% tembaga, 0,96 g/t emas, 6,3 g/t perak, dan 1.049 ppm molibdenum, setara dengan 2,52% CuEq. Cascadia menyatakan bahwa hasil terbaru terus memperluas mineralisasi di Zona 2000S melampaui batas Sumber Daya Mineral saat ini dan menyoroti sifat berkadar lebih tinggi dari perluasan tersebut. Interval pengeboran yang dilaporkan merupakan ketebalan hasil pengeboran, dengan lebar sebenarnya diperkirakan sekitar 60–70%. Hasil step-out terbaru menunjukkan bahwa mineralisasi tembaga-emas di Zona 2000S meluas melampaui batas Sumber Daya Mineral Carmacks saat ini. Interval yang lebar dan zona internal berkadar lebih tinggi dapat mendukung perluasan sumber daya di masa depan jika pengeboran tambahan mengonfirmasi kontinuitasnya. Namun, perpotongan baru ini belum dimasukkan ke dalam Estimasi Sumber Daya Mineral yang diperbarui, sehingga dampak akhirnya terhadap skala proyek dan perencanaan tambang masih harus ditentukan.
02 Oct 2026 15:27 (GMT+8)
SMM Evening Comments (Aug 2) - Shanghai Metals Market (SMM)