Lead inventory to stay at three-year low on tight supply

Telah Terbit: May 11, 2018 17:48 (GMT+8)
SMM expects lead inventory to stay low in the short term on tight supply and high consumption from downstream battery plants in June.

SHANGHAI, May 11 (SMM) – SMM expects lead inventory to stay low in the short term on tight supply and high consumption from downstream battery plants in June.

China’s lead social inventory fell to the lowest level in three years this year. The stocks at Shanghai and Guangdong warehouses amounted to 16,000 mt in late April, down 70% from the same period in 2017 and down 78% from 2016.

As environmental inspection teams settled in Jiangxi province earlier this month, most small-sized secondary lead smelters were suspended with some certified ones being required to halve their output. This is expected to affect secondary lead output of over 1,000 mt per day on average.

Although some smelters resuming operations from maintenance may lead to an estimated 20,000 mt of primary lead production rebound in May, the growth will be partially offset by the secondary lead output drop.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
25 Sep 2026 14:32 (GMT+8)
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
25 Sep 2026 14:32 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
25 Sep 2026 08:02 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Baca Selengkapnya
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
[SMM Analisis] Menjelang Festival Pertengahan Musim Gugur dan Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada tahun 2026? SMM, 25 September: Menurut pemberitahuan Kantor Umum Dewan Negara tentang pengaturan hari libur tahun 2026, libur Festival Pertengahan Musim Gugur tahun ini berlangsung dari 25 hingga 27 September, total 3 hari; libur Hari Nasional berlangsung dari 1 hingga 7 Oktober, total 7 hari......
25 Sep 2026 08:02 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Baca Selengkapnya
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)