SMM Morning Comments (May 8)

Telah Terbit: May 8, 2018 09:39
SMM Morning Comments

SHANGHAI, May 8 (SMM) –

Copper: The strong US dollar suppressed copper prices overnight. The SHFE 1807 contract fell to a low of 51,220 yuan/mt from open at 51,630 yuan/mt and closed at 51,250 yuan/mt. SHFE copper now struggles among moving averages with support from the 40-day moving average. We expect the SHFE 1807 contract to trade at 51,150-51,600 yuan/mt today with LME copper at $6,820-6,860/mt. Spot prices are seen higher at premiums of 0-50 yuan/mt.

Aluminium: We expect LME aluminium to expand upwards along the 20-day moving average today with a trading range of $2,320-2,370/mt. The SHFE 1807 contract climbed to a high of 14,755 yuan/mt overnight as longs added their positions. It fell to a low of 14,695 yuan/mt as longs lost their confidence and took a watch-and-wait approach. We expect the contract to rangebound around the 20-day moving average and trade at 14,650-14,800 yuan/mt today. Spot discounts are seen at 70-30 yuan/mt.

Zinc: We expect LME zinc to rise today following its SHFE counterpart’s movement but with strong resistance at the $3,100/mt level. Its trading range is likely to be at $3,050-3,100/mt during the day. SHFE zinc failed to continue its strong performance overnight with pressure at the 10- and 20-day moving averages. With less positive fundamentals, we see limited upward room for it and expect it to trade at 23,500-23,950 yuan/mt today. The 0# common brands are likely to trade at premiums of 130-180 yuan/mt over the SHFE 1806 contract with Shuangyan at premiums of 160-210 yuan/mt.

Nickel: Suppressed by the strong US dollar, the SHFE 1807 contract fell and consolidated at low levels overnight. However, we see support from the high international oil prices. We expect LME nickel to continue its rangebound pattern today with SHFE 1807 contract at 103,400-105,000 yuan/mt. Spot prices are seen at 102,900-104,500 yuan/mt.

Lead: After hitting a high of 18,920 yuan/mt overnight, the SHFE 1806 contract met pressure at 18,850-19,050 yuan/mt as investors cut their positions. It is likely to fall today given the capital outflow of 100 million yuan the previous day.

Tin: Given the strong US dollar, we see LME tin trading rangebound under pressure today with resistance at $21,400/mt and support at $21,000/mt. We also expect SHFE tin to move under pressure in a trading range of 146,000-147,500 yuan/mt.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Gravita India Akan Menambah Kapasitas Daur Ulang Tembaga 59.200 Ton per Tahun di Mundra
39 menit yang lalu
Gravita India Akan Menambah Kapasitas Daur Ulang Tembaga 59.200 Ton per Tahun di Mundra
Baca Selengkapnya
Gravita India Akan Menambah Kapasitas Daur Ulang Tembaga 59.200 Ton per Tahun di Mundra
Gravita India Akan Menambah Kapasitas Daur Ulang Tembaga 59.200 Ton per Tahun di Mundra
Gravita India berencana menambah kapasitas daur ulang tembaga sebesar 59.200 ton per tahun di fasilitas Mundra yang sudah ada di Gujarat, dengan investasi sekitar ₹640 juta yang didanai sepenuhnya melalui akrual internal. Kapasitas tersebut akan mulai beroperasi secara bertahap paling lambat 31 Maret 2029 dan akan memberikan integrasi ke belakang bagi pabrik Mandvi yang diusulkan Gravita, sekaligus memperkuat rantai nilai daur ulang tembaga dan kemampuan pengolahan bahan bakunya.
39 menit yang lalu
Diamond Power menginvestasikan ₹1,69 miliar untuk meningkatkan kapasitas kabel dan meningkatkan operasi batang tembaga & konduktor.
41 menit yang lalu
Diamond Power menginvestasikan ₹1,69 miliar untuk meningkatkan kapasitas kabel dan meningkatkan operasi batang tembaga & konduktor.
Baca Selengkapnya
Diamond Power menginvestasikan ₹1,69 miliar untuk meningkatkan kapasitas kabel dan meningkatkan operasi batang tembaga & konduktor.
Diamond Power menginvestasikan ₹1,69 miliar untuk meningkatkan kapasitas kabel dan meningkatkan operasi batang tembaga & konduktor.
Diamond Power Infrastructure menginvestasikan ₹1.686 miliar untuk tiga proyek perluasan di kompleks terpadunya di Vadodara. Proyek terbesar akan meningkatkan fasilitas pabrik batang dan konduktor menjadi pabrik kabel listrik dan kontrol aluminium dan tembaga 1,1 kV modern, menambah kapasitas tahunan sebesar 42.024 km dengan target produksi komersial mulai TA 2028. Perusahaan saat ini memilik kapasitas konduktor sekitar 100.000 ton per tahun dan juga memperluas kapabilitas kabel HV/EHV-nya.
41 menit yang lalu
Kecelakaan di Tambang Tembaga Las Bambas MMG di Peru Tewaskan Dua, Tiga Luka-luka
1 jam yang lalu
Kecelakaan di Tambang Tembaga Las Bambas MMG di Peru Tewaskan Dua, Tiga Luka-luka
Baca Selengkapnya
Kecelakaan di Tambang Tembaga Las Bambas MMG di Peru Tewaskan Dua, Tiga Luka-luka
Kecelakaan di Tambang Tembaga Las Bambas MMG di Peru Tewaskan Dua, Tiga Luka-luka
Minerals and Metals Group (MMG) mengumumkan pada 19 Agustus bahwa kecelakaan fatal terjadi di tambang tembaga Las Bambas di Peru pada 18 Agustus waktu setempat. Insiden terjadi di tangki klarifikasi sekitar 9 kilometer dari pabrik pengolahan bijih, saat pekerja mengganti pompa air. Dua orang tewas — satu karyawan Las Bambas dan satu karyawan kontraktor SINAR Perú — serta tiga pekerja lainnya terluka dan saat ini dalam perawatan medis. CEO MMG menyatakan bahwa perusahaan segera meluncurkan investigasi atas kecelakaan ini dan akan memberikan dukungan serta konseling psikologis kepada keluarga korban, pekerja yang terluka, dan karyawan di lokasi tambang. Sebagai langkah pencegahan, MMG menghentikan aktivitas di area terkait kecelakaan dan menangguhkan sementara operasi tambang Las Bambas, dengan produksi diharapkan kembali secara bertahap mulai 21 Agustus. Pada H1 2026, tambang Las Bambas memproduksi 210.200 mt tembaga dalam konsentrat, dengan produksi Q2 sebesar 109.200 mt. MMG sebelumnya mempertahankan panduan produksi tembaga dalam konsentrat tambang ini untuk 2026 di kisaran 380.000–400.000 mt dan memperkirakan produksi akan mencapai batas atas panduan. Pengumuman kecelakaan tidak mengungkapkan kerugian produksi spesifik akibat penangguhan, juga tidak menyesuaikan panduan produksi setahun penuh.
1 jam yang lalu