SHFE zinc plunges amid pessimistic sentiment

Telah Terbit: Apr 12, 2018 15:43 (GMT+8)
SHFE zinc tumbled during the day and touched a low at 23,605 yuan/mt on Thursday April 12 despite better fundamentals since the start of this month.

SHANGHAI, Apr 12 (SMM) – SHFE zinc tumbled during the day and touched a low at 23,605 yuan/mt on Thursday April 12 despite better fundamentals since the start of this month.

This is mainly because sentiment turned bearish when market talk suggested that China’s State Reserve Bureau may release 50,000-60,000 mt of zinc ingot to be received by some state-owned enterprises.

Speculative investors took advantage of such information and added their short bets, pressuring zinc prices. Over 100,000 lots were added to SHFE zinc positions during the day.

However, whether the State Reserve Bureau would release the metal could not be verified at the time of writing.

In addition, LME warrants have grown over 20,000 mt to 166,050 mt over the past week. Geopolitical risks such as the intensifying US-China trade war, US sanctions on Russia and Syria crisis have all weighed on the market and led investors to be more risk averse.

On the fundamentals front, zinc concentrate treatment charges (TCs) remained at low levels in April, when output from smelters is expected to be 3.4% lower from March due to maintenance works, SMM survey showed.  

Galvanising plants and zinc oxide producers in Hebei province and Tianjin have resumed normal operations as the weather improved. Demand in east and south China were stable. Inventories in Shanghai, Guangdong and Tianjin have declined for four consecutive weeks and are expected to fall further as demand recovers.

SMM believes that technical factors accounted for the weakness in zinc prices.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
25 Sep 2026 14:32 (GMT+8)
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
25 Sep 2026 14:32 (GMT+8)
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
25 Sep 2026 09:58 (GMT+8)
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Baca Selengkapnya
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon Metals mengumumkan telah menandatangani perjanjian definitif untuk mengakuisisi 100% deposit VMS tembaga-emas Turner di Oregon dari Gold Coast Mining. Imbalannya terdiri dari US$4,7 juta tunai, 4.778.761 saham Blue Moon senilai sekitar US$27 juta berdasarkan VWAP 20 hari, dan hingga US$7 juta dalam bentuk pencapaian tonggak yang terkait dengan perizinan eksplorasi/pengembangan bawah tanah, izin penambangan, dan produksi komersial. Penutupan transaksi diharapkan pada November 2026, dengan syarat persetujuan TSX Venture Exchange dan kondisi-kondisi lazim. Turner adalah deposit VMS tipe Siprus yang pernah berproduksi dan mengandung tembaga, emas, seng, perak, dan kobalt. Estimasi historis tahun 2010 melaporkan 2,447 juta ton pendek material Terindikasi dengan kadar 2,65% seng dan 2,084 juta ton pendek material Terestimasi dengan kadar 2,78% seng. Perusahaan memperkirakan perizinan untuk pengeboran eksplorasi dan pengembangan bawah tanah akan memakan waktu 12–18 bulan.
25 Sep 2026 09:58 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
24 Sep 2026 17:22 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Baca Selengkapnya
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
[Permintaan penggunaan akhir buruk, tingkat operasi seng oksida menurun] Dari perspektif kinerja permintaan penggunaan akhir, di sektor seng oksida kelas karet, pesanan perusahaan ban umumnya lemah, dan pembelian seng oksida tetap dilakukan secara tepat waktu; pesanan di bidang desulfurisasi berkinerja buruk, dengan permintaan tetap lesu...
24 Sep 2026 17:22 (GMT+8)
SHFE zinc plunges amid pessimistic sentiment - Shanghai Metals Market (SMM)