SHFE Announces Trading Limits for Ni 1801 Contract

Telah Terbit: Sep 22, 2017 17:24
The Shanghai Futures Exchange (SHFE) announced that position opened by non-futures company members or clients shall not exceed 1,500 lots per day on Ni 1801 from September 25.

SHANGHAI, Sept. 22 (SMM) –The Shanghai Futures Exchange (SHFE) announced that position opened by non-futures company members or clients shall not exceed 1,500 lots per day on Ni 1801 from September 25.

SHFE Releases More Transaction Fees for Closing out Intra-day’s Positions in Ni 1801 Contract

Accounts which have actual controlling relationship will be regarded as one account.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Data: Pergerakan pasar SHFE, DCE (17 Agu)
15 menit yang lalu
Data: Pergerakan pasar SHFE, DCE (17 Agu)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (17 Agu)
Data: Pergerakan pasar SHFE, DCE (17 Agu)
Tabel berikut menunjukkan pergerakan logam ferrous dan nonferrous di SHFE dan DCE pada 17 Agu 2026
15 menit yang lalu
[SMM Kilat Nikel] Vale: Konstruksi Mekanis Smelter Nikel HPAL Pomalaa Telah Selesai
37 menit yang lalu
[SMM Kilat Nikel] Vale: Konstruksi Mekanis Smelter Nikel HPAL Pomalaa Telah Selesai
Baca Selengkapnya
[SMM Kilat Nikel] Vale: Konstruksi Mekanis Smelter Nikel HPAL Pomalaa Telah Selesai
[SMM Kilat Nikel] Vale: Konstruksi Mekanis Smelter Nikel HPAL Pomalaa Telah Selesai
[Vale: Konstruksi Mekanis Smelter Nikel HPAL Pomalaa Telah Selesai] Budiawansyah, Chief Sustainability and Corporate Affairs Officer PT Vale Indonesia (INCO), mengatakan pada 13 Agustus bahwa konstruksi fisik dan mekanis smelter HPAL (high-pressure acid leach, hidrometalurgi) yang berlokasi di blok Pomalaa, Kecamatan Pomalaa, Kabupaten Kolaka, Provinsi Sulawesi Tenggara, telah selesai (satu lini produksi telah mencapai 100% penyelesaian mekanis) dan telah memasuki tahap uji operasi. Proyek ini dikembangkan oleh PT Kolaka Nickel Indonesia (KNI), dengan mitra Zhejiang Huayou Cobalt (Huayou) dan Ford Motor Company (Ford). PT Vale Indonesia Tbk berencana memulai produksi proyek di Pomalaa pada kuartal III 2026, dengan target kapasitas 120.000 mt Ni MHP.
37 menit yang lalu
Sentimen Pasar Melemah untuk NPI Kelas Tinggi, Pembelian Hilir Lesu di Tengah Minat yang Mendingin
47 menit yang lalu
Sentimen Pasar Melemah untuk NPI Kelas Tinggi, Pembelian Hilir Lesu di Tengah Minat yang Mendingin
Baca Selengkapnya
Sentimen Pasar Melemah untuk NPI Kelas Tinggi, Pembelian Hilir Lesu di Tengah Minat yang Mendingin
Sentimen Pasar Melemah untuk NPI Kelas Tinggi, Pembelian Hilir Lesu di Tengah Minat yang Mendingin
[Flash Nikel SMM] Berita 17 Agustus: Sentimen pasar saat ini untuk NPI kadar tinggi relatif lemah. Banyak pelaku pasar, menghadapi tren pasar yang menurun, memilih bersikap wait and see dan menghentikan penawaran harga. Kemauan beli pabrik baja hilir tetap lesu, dengan beberapa perusahaan langsung menangguhkan aktivitas pengadaan terkait, dan minat beli di pasar jelas mendingin
47 menit yang lalu
SHFE Announces Trading Limits for Ni 1801 Contract - Shanghai Metals Market (SMM)