Oil investment trio hunts for bargains after crude crash

Telah Terbit: Mar 23, 2017 17:13 (GMT+8)
OPEC made a smart move to limit production, but the move has had some unforeseen effects.

By 

ScrapMonster Contributor

SEATTLE (polymers.in):  Oil, Natural Gas, Coal
GOLDMAN: OPEC's oil production cuts were smart but they're having unintended consequences
- OPEC made a smart move to limit production, but the move has had some unforeseen effects.
- Brent crude is at USD 5.50/bbl above the spot price. 

Far East Russian crude oil premiums hit record lows as EFS, margins take toll
- Sakhalin Energy could have sold a total of five 730,000 bbl cargoes of light sweet Sakhalin Blend crude for loading in the second half of May. 
- ESPO Blend crude was assessed at a premium of USD 1.80/bbl to Dubai. 

Oil Investment Trio Hunts for Bargains After Crude Crash
- WTI rose 9 cents to USD 48.31.
- A trio of Houston based private equity funds is sifting through the oil industry with a view to potentially reaching USD 4 billion of investments. 

Chevron's USD 1 Billion Sale of China Oil Fields Stalls
- Chevron’s Corp’s sale of its stakes in Chinese offshore oil fields operated by state-owned CNOOC Ltd.
- Chevron had aimed to sell the assets for as much as USD 1 billion.
- Chevron owns a 24.5% working interest in the QHD 32-6 field. 

Oil Closes at Lowest Since November as US Supply Seen Rising
- Futures dropped 1.8% in New York.
- WTI for April delivery dropped 88 cents to USD 47.34/bbl.
- Brent for May settlement declined 66 cents to USD 50.96/bbl.

Feedstock (Ethane, Ethylene, Propane, Propylene, PX, PTA, MEG, EDC, VCM)
Asian ethylene prices slip on Monday
- CFR North East Asia prices of ethylene were assessed lower at USD 1145/MT levels, a fall of USD 15/MT from last Friday’s assessed levels.
- CFR South East Asia prices of ethylene were down at USD 1050/MT levels, a decline of USD 15/MT from last Friday.

Polymers Supply
Merak LLDPE plant brought on-stream by Lotte Titan
- PT Lotte Titan Nusantara Indonesia has recently restarted its LLDPE plant following an unplanned outage. 

Europe naphtha cracker margins slip, LPG margins rise
- Euro-dominated naphtha costs were flat but a 2% decline in contract and spot co-products credits saw contract cracker margins fall by 2% and spot margins by 4%. 

Russia’s HDPE output down 5% in January-February
- Production of HDPE in Russia decreased to 154,900 MT in the first two months of the year.
- February HDPE production in Russia stood at 70,400 MT, while in January it was about 84,500 MT. 

Russia’s PP output decreases 2% in January-February
- Production of PP in Russia decreased to 234,300 MT in first two months of this year, down 2% year on year.
- February PP production in the country decreased to 108,700 MT.

Courtesy: www.polymers.io

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Analysis] Valterra Platinum 2010 hingga 2025: Bagaimana Guncangan Pemrosesan dan Siklus Harga Membentuk Ulang Bisnis
6 jam yang lalu
[SMM Analysis] Valterra Platinum 2010 hingga 2025: Bagaimana Guncangan Pemrosesan dan Siklus Harga Membentuk Ulang Bisnis
Baca Selengkapnya
[SMM Analysis] Valterra Platinum 2010 hingga 2025: Bagaimana Guncangan Pemrosesan dan Siklus Harga Membentuk Ulang Bisnis
[SMM Analysis] Valterra Platinum 2010 hingga 2025: Bagaimana Guncangan Pemrosesan dan Siklus Harga Membentuk Ulang Bisnis
Rekor Valterra Platinum 2010–2025 menunjukkan bagaimana gangguan pabrik, tunggakan inventaris, dan perubahan aturan pelaporan membentuk output olahan di Afrika Selatan dan Zimbabwe. Platinum, paladium, dan rhodium mengikuti siklus harga yang berbeda, sehingga output saja tidak dapat menjelaskan nilai. Harga ruthenium dan iridium menambah konteks, meskipun produksi terpisahnya tidak diungkapkan. Harga yang lebih kuat dan pemurnian mengangkat hasil H1 2026; keuntungan yang bertahan lama bergantung pada keselamatan, pengendalian biaya, dan investasi yang disiplin.
6 jam yang lalu
[SMM Kilas] Jubilee Tinjau Minat pada Proyek PGM Tjate yang Belum Dikembangkan
7 jam yang lalu
[SMM Kilas] Jubilee Tinjau Minat pada Proyek PGM Tjate yang Belum Dikembangkan
Baca Selengkapnya
[SMM Kilas] Jubilee Tinjau Minat pada Proyek PGM Tjate yang Belum Dikembangkan
[SMM Kilas] Jubilee Tinjau Minat pada Proyek PGM Tjate yang Belum Dikembangkan
Jubilee Metals menyatakan dalam pembaruan operasionalnya pada 14 September bahwa beberapa perusahaan telah menyatakan minat terhadap proyek PGM Tjate miliknya dan pihaknya sedang meninjau pendekatan-pendekatan tersebut sebagai bagian dari kajian strategis. Jubilee mempertahankan aset Afrika Selatan tersebut setelah menjual operasi krom dan PGM lainnya; Miningmx melaporkan bahwa pelepasan aset sedang dipertimbangkan seiring fokus perusahaan pada tembaga Zambia. Penjualan dapat mengalihkan tanggung jawab pengembangan Tjate. Pernyataan minat bukanlah perjanjian penjualan maupun komitmen pembiayaan, dan belum ada jadwal produksi yang diumumkan. Kontribusi apa pun terhadap pasokan PGM bergantung pada keputusan pengembangan di masa depan.
7 jam yang lalu
[SMM Kilat] Sylvania Tinjau Rencana Thaba Setelah Estimasi Kadar Umpan Lebih Rendah
7 jam yang lalu
[SMM Kilat] Sylvania Tinjau Rencana Thaba Setelah Estimasi Kadar Umpan Lebih Rendah
Baca Selengkapnya
[SMM Kilat] Sylvania Tinjau Rencana Thaba Setelah Estimasi Kadar Umpan Lebih Rendah
[SMM Kilat] Sylvania Tinjau Rencana Thaba Setelah Estimasi Kadar Umpan Lebih Rendah
Sylvania Platinum menyatakan dalam hasil tahunan 15 September bahwa model geologi yang diperbarui menunjukkan kadar umpan krom dan PGM di usaha patungan Thaba bisa berada di bawah asumsi awal. Miningmx melaporkan perkiraan kekurangan 15–20% untuk kadar PGM dan 8–12% untuk kadar krom dibandingkan target sebelumnya. Produksi grup Sylvania FY2026 sebesar 95.885 oz 4E PGM mencakup operasi di luar Thaba. Para mitra sedang meninjau rencana tambang, dengan rencana umur tambang yang diperbarui diharapkan dalam tiga hingga enam bulan. Manajemen menyatakan Thaba tetap menguntungkan berdasarkan asumsi saat ini. Kadar yang lebih rendah dapat mengurangi logam yang dapat dipulihkan dan imbal hasil proyek; rencana yang direvisi dan prospek profitabilitas tetap bergantung pada tinjauan tersebut.
7 jam yang lalu