Will BHP Billiton Compromise after Strike at Escondida Mine? What’s Impact on Copper Market? SMM Reports

Telah Terbit: Feb 13, 2017 11:44 (GMT+8)
Workers at BHP Billiton's Escondida mine in northern Chile walked out on strike from February 9. SMM sees low chance for BHP Billiton to compromise to meet workers’ new requirements.

SHANGHAI, Feb. 13 (SMM) - Workers at BHP Billiton's Escondida mine in northern Chile walked out on strike from February 9. SMM sees low chance for BHP Billiton to compromise to meet workers’ new requirements after considering multiple factors. 

First, BHP Billiton registered a net loss of $6.39 billion during the fiscal year of 2016 (from July 2015 to June 2015), the biggest loss on the record. The company has not released its financial report for 2H 2016, but it is unlikely to see the huge losses to narrow significantly in only half a year. Hence, the company has no adequate cash liquidity to meet workers’ wage requirements. 

Why Chinese Imports of Unwrought Copper and Copper Semis Drop both on Monthly and Yearly Basis in January 2017? SMM Reports

Second, a typical collective bargaining procedure in Chile lasts about 80 days in according to the country’s labor law, including 30 days’ strike. But, there are no limits on negotiating time legally. After the talks, the employer and employee will sign a new labor contract, and the contract usually lasts for 2 or 4 years, a reason behind periodic strike. The employer and union usually starts the talks 45 days ahead of expiration of the old contract, and if the two parties fail to reach an agreement on new terms and clauses, the government will start a 5-day mediation work after being agreed by the two parties. 5 more mediation days will be added if the two parties require. The strike will begin if negotiations mediated by the government fail. The employer is able to employ temporary workers during the strike period, and the employment can be done immediately once wage is not below the original salary plus inflation rate. If not, replacement workers will not be deployed after 15-day strike. This means the employer is able to employ temporary workers or enroll new workers without adding wages after the strike time exceeds the time the employer expects. 

At present, production at Escondida mine has been halted, and the union said workers set up camp at the mine, and hoarded food and water for long standoff. SMM estimates the strike will not last for a long time as the longer strike, the bigger losses workers will face, and the strike will likely not exceed 30 days. 

The strike will affect daily production loss at the mine by around 3,000-4,000 tonnes (Cu content), SMM estimates. According to Wood Mackenzie, global copper ore output was 20.07 million tonnes (Cu content) in 2015, averaging 1.67 million tonnes per month. If the strike lasts for 30 days at Escondida mine, production loss will likely reach 90-100,000 tonnes (Cu content). The small amount, coupled with ample copper inventories, will play a small impact on copper market, and the major influence will be on market sentiment. 

“On the supply&demand front, copper market now has no rising strength, and in China’s market, it is a traditionally off-demand season, and domestic demand will not recover until after Lantern Festival on February 11,” SMM copper analyst says. 
On the SHFE, copper inventories are on the rise for season factor, and spot prices trade at discounts after returning from the holiday, giving no price rising strength, SMM adds. 

Salary negotiation at Escondida mine has been seen the benchmark to the industry, so eyes should be paid to the impact on talks at other large global copper mines which will face salary talks in 2017. Those talks will add production disruption to world’s copper ore mines in 2017, and the global ore output growth may be lower than previous estimation, and the combined impact on market price, on the other hand, will also be higher, SMM concludes. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Apa Arti Dimulainya Kembali Cobre Panamá bagi Pasokan Tembaga Global? [Analisis SMM]
29 menit yang lalu
Apa Arti Dimulainya Kembali Cobre Panamá bagi Pasokan Tembaga Global? [Analisis SMM]
Baca Selengkapnya
Apa Arti Dimulainya Kembali Cobre Panamá bagi Pasokan Tembaga Global? [Analisis SMM]
Apa Arti Dimulainya Kembali Cobre Panamá bagi Pasokan Tembaga Global? [Analisis SMM]
Cobre Panamá dapat kembali menjadi sumber utama pasokan tembaga global jika Panama dan First Quantum menyepakati kerangka operasional baru. Tambang ini memproduksi 330,9 ribu ton tembaga pada 2023 dan secara historis memasok sekitar 1% dari produksi global. Meskipun pemrosesan stok telah dilanjutkan, penambangan baru masih ditangguhkan. Setiap dimulainya kembali kemungkinan akan dilakukan secara bertahap, dengan waktu yang bergantung pada negosiasi, ketentuan hukum, dan remobilisasi operasional.
29 menit yang lalu
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
5 jam yang lalu
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Baca Selengkapnya
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Vedanta telah mengumumkan rencana investasi besar, di mana Vedanta Copper berencana menginvestasikan 2,3 miliar dolar AS di India dan Arab Saudi selama tiga hingga empat tahun ke depan, dengan target produksi tembaga tahunan lebih dari 1 juta ton pada 2030. Perusahaan ini bertujuan memproduksi 500.000 ton per tahun di India dan Arab Saudi, di samping produksi yang sudah berjalan sebesar 100.000 ton di Fujairah, UEA. Sekitar 2 miliar dolar AS akan diinvestasikan pada proyek penambangan, peleburan, dan batang tembaga di Arab Saudi, dengan keputusan investasi untuk usulan smelter tembaga Saudi diperkirakan akan diambil pada kuartal ini. Vedanta juga berupaya menghidupkan kembali smelter tembaga Tuticorin di India, yang telah ditutup sejak 2018. Perusahaan memperkirakan putusan pengadilan akan keluar dalam tiga bulan dan, jika disetujui, berencana menginvestasikan 250 juta dolar AS untuk merenovasi fasilitas tersebut, dengan target pengoperasian kembali dalam delapan hingga sembilan bulan dan produksi tembaga tahunan sebesar 250.000 ton. Sementara itu, fasilitas Silvassa beroperasi pada kapasitas sekitar 95%, dengan produksi katoda tembaga tahunan melebihi 245.000 ton.
5 jam yang lalu
London BTC tandai tembaga dan antimon di Nevada Black Star
7 jam yang lalu
London BTC tandai tembaga dan antimon di Nevada Black Star
Baca Selengkapnya
London BTC tandai tembaga dan antimon di Nevada Black Star
London BTC tandai tembaga dan antimon di Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) mengumumkan pada 5 Oktober 2026 hasil awal pXRF di lapangan dari proyek emas-mineral kritis Black Star di Pershing County, Nevada. Program perdana mengumpulkan 69 sampel chip batuan di sepanjang koridor 2,5 km antara target Western dan Eastern. Pembacaan pXRF menunjukkan antimon hingga 0,44% Sb, tembaga hingga 30,0% Cu, bismut hingga 0,73% Bi, dan perak hingga 811 ppm Ag, dengan asosiasi antimon-tembaga muncul di kedua ujung koridor. Tanda ini mencerminkan sampel historis tahun 1985 yang berjarak 120 m di selatan klaim (>1% Sb, 2% Cu, 700 ppm Ag). Pengambilan sampel uji tuntas sebelumnya menghasilkan hingga 16,23 g/t emas dan 50,5 g/t perak. Sampel kini berada di MSALABS untuk pengujian laboratorium, dengan geokimia multi-elemen lengkap termasuk antimon, tungsten, dan tembaga akan menyusul. Tembaga, sebagai kredit produk sampingan, menambah daya tarik strategis di bawah kebijakan mineral kritis AS, meskipun hasil masih merupakan pembacaan lapangan awal.
7 jam yang lalu