ICSG: Refined copper market ended in deficit during Jan- July 2016

Telah Terbit: Oct 25, 2016 10:14 (GMT+8)
The International Copper Study Group (ICSG) has released preliminary data for the month of July this year in its October 2016 Copper Bulletin published yesterday.

October 24, 2016 08:00:48 AM
SPOKANE (Scrap Monster): The International Copper Study Group (ICSG) has released preliminary data for the month of July this year in its October 2016 Copper Bulletin published yesterday. According to preliminary ICSG data, copper production and usage data points to an apparent production deficit of nearly 264,000 metric tonnes.

The International Copper Study Group (ICSG) has released preliminary data for the month of July this year in its October 2016 Copper Bulletin published yesterday. According to preliminary ICSG data, copper production and usage data points to an apparent production deficit of nearly 264,000 metric tonnes.

The refined copper market balance for the month of July ‘16 alone showed an apparent production surplus of nearly 133,000 metric tonnes. The apparent refined copper demand from China remained weak during the month. The production surplus for the month, after making seasonal adjustments for global refined copper production and usage, stood at 105,000 metric tonnes. The refined copper balance for the first seven-month period of the year ended in production deficit of around 264,000 metric tonnes as compared with the deficit of around 7,000 tonnes during the same period in 2015.

World refined copper production increased by nearly 2.8% (nearly 370,000 t) during the first seven months of 2016 in comparison with the corresponding seven-month period from January to July last year. Primary production was up 2.5%, whereas the secondary production was up by 5%. The refined copper production during the month witnessed significant growth of 6% in China. The production by the US witnessed an increase of 15%. The output by Chile and Japan witnessed rise of 2% and 3% respectively. The other regions to report rise in refined output were the Americas (6%), Asia (5%) and Oceania (8%). On the other hand, the refined copper output by African region declined by 14%. The declined output from the region was mainly on account of temporary production cuts in some regions of the DRC and Zambia. The output by European region too witnessed decline of 3%.The worldwide refineries reported capacity utilization rate of 83%, more or less unchanged from that during the same period a year before.

The world copper mine production has increased by around 5.0% (nearly 560,000 t) during the initial seven-month period of 2016. Concentrate production was up by 6.5% during the period. The mine output from Peru reported significant improvement of 47%, primarily on account of new and expanded capacities becoming online during the past two years. The recovery in production by Canada, the US and Mongolia and expanded capacity in Mexico also contributed to the sharp recovery in production levels. The production declined by 5% in Chile during the month. The mine output from the DRC too dropped sharply by 9% year-on-year. Region-wise, Asia recorded 8% rise in production. Also Americas recorded 7.0% rise in output. On the other hand, the Africa region recorded production decline of 4.5%. The production held flat over the previous year in Oceania. The mine output by the European region remained flat during Jan-July ‘16. The mine capacity utilization rates remained essentially unchanged during the first seven-month period this year at 84.5% when compared with the year-ago period.

Meantime, global usage of the metal is estimated to have increased by around 4% during January to July this year in comparison with the year before. The Chinese apparent demand increased sharply by 9%. The usage by world countries excluding China has registered marginal increase of 0.50%. The European demand rose by 3.5%, whereas it declined by 11% and 4.5% in Africa and the Americas.

The table given below provides World Refined Copper Supply Trends for the first seven months of the current year:

 

Jan

Feb

Mar

Apr

May

Jun

Jul

World Mine Production

1,580

1,519

1,685

1,631

1,721

1,695

1,687

World Refined Production

1,952

1,821

1,988

1,914

1,914

1,914

1,979

Note: The above figures are in thousand metric tonnes

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
3 jam yang lalu
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Baca Selengkapnya
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Kobrea Exploration Corp. mengumumkan persetujuan program eksplorasi 2026/27 senilai US$4 juta untuk Distrik Pertambangan Malargüe Barat di Provinsi Mendoza, Argentina, yang sepenuhnya didanai oleh BHP. Program ini mencakup pengeboran inti di target porfiri tembaga-emas-molibdenum El Destino, survei polarisasi terinduksi di El Destino dan KBX-17, serta pemetaan geologi, pengambilan sampel geokimia, dan pekerjaan hiperspektral. Aliansi eksplorasi ini mencakup tujuh proyek dengan total luas sekitar 733 kilometer persegi, tempat anomali geokimia tembaga, emas, dan molibdenum telah teridentifikasi. Analisis SMM: persetujuan anggaran baru mengubah kemitraan BHP-Kobrea dari kerangka aliansi menjadi fase pengeboran aktif. Namun, properti tersebut masih berada pada tahap eksplorasi awal, tanpa molibden
3 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
3 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Baca Selengkapnya
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Glencore berencana menyerahkan laporan dampak lingkungan untuk proyek tembaga-molibdenum El Pachón di Argentina pada kuartal I 2027 dan menargetkan persetujuan di bawah Rezim Insentif untuk Investasi Besar, atau RIGI, sebelum Juli 2027. Glencore sebelumnya melaporkan sekitar 6 miliar ton sumber daya mineral dengan kadar rata-rata 0,43% tembaga, 2,2 g/t perak, dan 130 g/t molibdenum, setara dengan sekitar 0,013% Mo. Berdasarkan tonase dan kadar rata-rata yang diungkapkan, sumber daya tersebut mengandung sekitar 780.000 ton molibdenum in-situ, meskipun ini tidak mewakili cadangan, logam yang dapat diperoleh kembali, atau produksi di masa depan. Selama musim eksplorasi 2025/26, proyek ini menyelesaikan 53 lubang bor dengan total 21.246 meter dan memajukan infrastruktur awal jalan dan jembatan.
3 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
3 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Baca Selengkapnya
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Glencore mengumumkan bahwa proyek Agua Rica, yang dikenal sebagai MARA, telah menerima persetujuan di bawah Rezim Insentif untuk Investasi Besar Argentina, atau RIGI. Deposit tembaga-emas-perak-molibdenum skala besar ini mengandung sekitar 1,2 miliar ton sumber daya mineral terukur dan terindikasi dengan kadar rata-rata 0,03% molibdenum. Berdasarkan tonase dan kadar yang diungkapkan, sumber daya tersebut mengandung sekitar 360.000 ton molibdenum in-situ; namun, ini tidak mewakili cadangan, logam yang dapat dipulihkan, atau produksi molibdenum di masa depan. Glencore juga memajukan perkiraan produksi pertama dari restart Alumbrera menjadi H2 2027 dari sebelumnya H1 2028. Infrastruktur pemrosesan, logistik, dan tenaga kerja Alumbrera diharapkan dapat mendukung pengembangan MARA di masa depan. Analisis SMM: Persetujuan RIGI meningkatkan kepastian fiskal dan regulasi proyek, tetapi belum ada keputusan investasi final, rencana pemulihan molibdenum, atau panduan produksi molibdenum yang diumumkan, sehingga tidak ada dampak langsung dalam jangka pendek terhadap pasokan molibdenum.
3 jam yang lalu