Brazil pig iron exports dropped sharply by 12% in March

Telah Terbit: May 17, 2016 09:36 (GMT+8)
The most recent export statistics released by the Brazilian Trade Ministry indicates that pig iron exports by the country declined during the month of March this year.

By  (ScrapMonster Author)

May 16, 2016 07:54:11 AM

SAO PAULO (Scrap Monster): According to statistics provided by the Brazilian Ministry of Development and Foreign Trade, the country’s pig iron exports during the month of March this year declined considerably when compared with the previous year.

Mar ’16 exports

Brazil’s pig iron exports totaled 219,000 tons during the month. The exports increased sharply by 51.2% when compared with the previous month. The Brazilian pig iron exports had totaled 145,000 during the month of February this year. When matched with the previous year, the country’s pig iron exports in Mar ’16 were down by 11.5%. The exports had totaled over 247,000 tons during March last year.

The primary destination of Brazilian pig iron exports during Mar ‘16 was the US. The country imported 59,900 tons of pig iron from Brazil during the month, accounting for over 46% of the total pig iron exports by Brazil during the month. The exports to the country were down by 71.4% from the same month a year before. In second place was Peru with 59,600 tons. The exports to Netherlands witnessed sharp rise, when compared with zero imports during the same month in 2015. Taiwan imported 36,000 tons of Brazilian pig iron during the month.

Feb ’16 exports

Brazil exported 145,000 tons of pig iron during the month of February this year. The exports dropped by 6.9% when compared with Jan ‘16. The Brazilian pig iron exports had totaled 155,000 during the month of January this year. When matched with the previous year, the country’s pig iron exports in Feb ’16 were down by 9.6%. The exports had totaled over 160,000 tons during February last year.

The key importer of Brazilian pig iron during Feb ‘16 was the US. The country imported 67,000 tons of pig iron from Brazil during the month, accounting for over 46% of the total pig iron exports by Brazil during the month. The exports to the country were down by 26.8% from the same month a year before. In second place was the Netherlands with 23,000 tons. The exports to Netherlands witnessed decline of 5.6% over the previous year. Argentina imported 21,000 tons of Brazilian pig iron during the month.

Exports during 2015

Brazil’s pig iron exports totaled 2.752 million tons in 2015. The total exports climbed higher by nearly 6.3% from the previous year. The country’s pig iron exports had totaled 2.589 million tons during 2014.

The country’s exports of pig iron had totaled 321,000 tons during December last year. The exports almost doubled when compared with those during Nov ’15. However, the Dec ’15 exports were down significantly by 13.5% when compared with the exports during the same month a year before4. The Brazilian pig iron exports had totaled 370,000 tons during Dec ’14.

The main destination of Brazilian pig iron exports during Dec ’15 was the US. The country imported 167,000 tons of pig iron from Brazil during the month. The exports to the country were down by 20.6% from the same month a year before. The imports by the US accounted for nearly 52% of the total pig iron exports by Brazil during December last year.

In second place was Mexico with 44,000 tons. The exports to Mexico witnessed rise of 6.3% over the previous year.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Produsen tembaga India meminta pemangkasan GST karena harga rekor meningkatkan beban modal kerja
3 jam yang lalu
Produsen tembaga India meminta pemangkasan GST karena harga rekor meningkatkan beban modal kerja
Baca Selengkapnya
Produsen tembaga India meminta pemangkasan GST karena harga rekor meningkatkan beban modal kerja
Produsen tembaga India meminta pemangkasan GST karena harga rekor meningkatkan beban modal kerja
Produsen tembaga India mengupayakan penurunan GST menjadi 5% dari 18%, dengan alasan meningkatnya kebutuhan modal kerja di tengah harga tembaga yang mencapai rekor tertinggi.
3 jam yang lalu
Kekurangan Asam Sulfat Muncul sebagai Kendala Pertumbuhan Tembaga Zambia
7 jam yang lalu
Kekurangan Asam Sulfat Muncul sebagai Kendala Pertumbuhan Tembaga Zambia
Baca Selengkapnya
Kekurangan Asam Sulfat Muncul sebagai Kendala Pertumbuhan Tembaga Zambia
Kekurangan Asam Sulfat Muncul sebagai Kendala Pertumbuhan Tembaga Zambia
Kelangkaan asam sulfat di Zambia semakin menjadi kendala bagi produksi dan pemurnian tembaga. Jubilee Metals melaporkan biaya asam naik lebih dari 200% pada kuartal IV tahun fiskal 2026, sementara produksi katoda Sable turun menjadi 250 ton dari 361 ton pada kuartal III. Data pemerintah juga menunjukkan produksi tembaga skala kecil turun 35,2% secara tahunan pada semester I 2026, menyoroti keterpaparan sektor ini terhadap ketersediaan asam yang ketat dan biaya pemrosesan yang lebih tinggi.
7 jam yang lalu
Selkirk Copper Menargetkan Mulai Kembali Tambang Minto pada H2 2028 Setelah PEA Positif
8 jam yang lalu
Selkirk Copper Menargetkan Mulai Kembali Tambang Minto pada H2 2028 Setelah PEA Positif
Baca Selengkapnya
Selkirk Copper Menargetkan Mulai Kembali Tambang Minto pada H2 2028 Setelah PEA Positif
Selkirk Copper Menargetkan Mulai Kembali Tambang Minto pada H2 2028 Setelah PEA Positif
Selkirk Copper Mines telah menguraikan potensi dimulainya kembali tambang tembaga-emas-perak Minto yang pernah berproduksi di Yukon, Kanada, setelah selesainya Kajian Ekonomi Awal (PEA) yang mendukung produksi konsentrat pertama pada paruh kedua 2028. PEA tersebut menguraikan umur tambang 13 tahun berdasarkan kombinasi penambangan terbuka dan bawah tanah, dengan operasi dirancang pada tingkat penambangan dan penggilingan rata-rata 4.100 mt/hari. Pada produksi puncak, proyek ini diperkirakan menghasilkan sekitar 27.200 mt/tahun setara tembaga yang terkandung dalam konsentrat, setara dengan sekitar 48.700 mt/tahun konsentrat tembaga-emas-perak kadar tinggi. Modal awal yang diperlukan untuk memulai kembali produksi diperkirakan sebesar C$186 juta. Dengan menggunakan harga perencanaan studi sebesar US$5,00/lb tembaga, US$3.600/oz emas, dan US$50/oz perak, PEA memperkirakan NPV setelah pajak pada tingkat diskonto 7% sebesar C$494 juta, IRR setelah pajak sebesar 47,8%, dan periode pengembalian sekitar 1,9 tahun sejak produksi pertama. Minto diuntungkan oleh infrastruktur eksisting yang substansial dari operasi sebelumnya, termasuk pabrik pengolahan 4.100 mt/hari serta infrastruktur tambang terbuka dan bawah tanah yang sudah ada. Selkirk Copper menyatakan bahwa penilaian terhadap infrastruktur dan peralatan eksisting di lokasi menemukan bahwa sebagian besar masih dalam kondisi kerja yang baik dan hanya memerlukan perhatian serta perbaikan kecil. Perusahaan menargetkan produksi konsentrat pertama pada H2 2028, diikuti oleh peningkatan penuh penambangan, penggilingan, dan produksi konsentrat pada H1 2029. Studi kelayakan dijadwalkan dimulai pada Q4 2026, sementara pengajuan amendemen izin juga diperkirakan akan disampaikan selama kuartal keempat. Selkirk Copper menyatakan bahwa keputusan untuk memulai kembali ditargetkan setelah selesainya studi kelayakan dan diterimanya amendemen izin pada H2 2027. PEA Minto menguraikan jalur potensial bagi operasi tembaga yang sebelumnya berproduksi untuk kembali ke pasar pada 2028, didukung oleh infrastruktur pengolahan dan penambangan eksisting yang dapat mengurangi kebutuhan modal dan konstruksi dibandingkan dengan proyek greenfield. Namun, angka produksi puncak 27.200 mt/tahun merupakan setara tembaga yang terkandung dalam konsentrat, bukan tembaga terkandung saja. Dimulainya kembali juga masih bergantung pada studi kelayakan lebih lanjut, perizinan, dan pelaksanaan proyek, sehingga kemajuan menuju keputusan memulai kembali pada H2 2027 menjadi tonggak penting untuk dipantau.
8 jam yang lalu