SMM Update of Output Cut Plans at 10 Chinese Major Copper Smelters in 2016

Telah Terbit: Mar 29, 2016 15:46 (GMT+8)
In late 2015, ten major Chinese copper smelters agreed to reduce production by 350,000 tonnes in 2016. As entering April, has the cut plan being implemented as schedule?

SHANGHAI, Mar. 29 (SMM) – In late 2015, ten major Chinese copper smelters met to agree on a joint output cut following sharp price declines, and announced to reduce production by 350,000 tonnes in 2016. As entering April, has the cut plan being implemented as schedule?  

Approximately 260,000 tonnes of copper smelting capacity has been confirmed to be cut in 2016 at the ten producers so far, according to SMM sources. 

Moreover, the cut target will be mainly on secondary copper production in 2016, as 2016 term TCs for copper concentrate remains favorable for producing primary copper, with copper ore as raw materials, SMM analyst points out.  

Will China Copper Output Fall in 2016 after Cuts Plan? SMM Interviews 

According to SMM data, the average price spread between #1 bare bright and refined copper was less than 1,000 yuan per tonne during 2011-2015. 

Little price advantages, coupled with falling imports of scrap copper and environment protection pressures, has significantly squeezed profits for domestic secondary copper production, SMM added.  

During 1Q, copper production at the ten smelters is stable, SMM survey found. China’s copper supply is expected to grow slightly in 2016, SMM expected. 

“China’s copper refining capacity is expected to increase in 2016, but the growth of new refining capacity will slow down,” SMM copper analyst said at the 2016 Copper&Aluminum Summit from Mar. 17-18 in Shanghai. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
25 Sep 2026 14:32 (GMT+8)
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
25 Sep 2026 14:32 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
25 Sep 2026 08:02 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Baca Selengkapnya
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
[SMM Analisis] Menjelang Festival Pertengahan Musim Gugur dan Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada tahun 2026? SMM, 25 September: Menurut pemberitahuan Kantor Umum Dewan Negara tentang pengaturan hari libur tahun 2026, libur Festival Pertengahan Musim Gugur tahun ini berlangsung dari 25 hingga 27 September, total 3 hari; libur Hari Nasional berlangsung dari 1 hingga 7 Oktober, total 7 hari......
25 Sep 2026 08:02 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Baca Selengkapnya
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)