US Weekly Raw Steel output rebounds after several weeks of decline

Telah Terbit: Mar 15, 2016 17:18 (GMT+8)
The US weekly raw steel output climbed higher by 2.9% during the week ended March 12th, 2016.

By  (ScrapMonster Author)

March 15, 2016 01:40:17 AM

ALBANY (Scrap Monster): As per the statistics released by the American Iron and Steel Institute (AISI), the raw steel production by the country edged higher by 2.9% during the week ended March 12th, 2016. The production had declined marginally by 1.1% during the week prior to this.

The total domestic raw steel output during the week ending March 12th was 1,722,000 net tons. The AISI data indicates that the US raw steel production has increased by 2.9% during the week. This is in comparison with the previous week (ie., the week ended Mar 5th)  production figures of 1,673,000 net tons. Also, the weekly output represents increase of 7.6% in comparison with production of 1,601,000 net tons during same week the previous year.

The capability utilization rate of US steel makers rose to 73.6% during the week ended Mar 12th, 2016.

The capacity utilization rate has increased when compared with 71.5% during the previous week (ie., the week ending March 5th). Also, capacity utilization was higher when compared with the rate of 67.7% during same week the previous year.

The region-wise comparative weekly production figures are provided below:-    

 

Region

Steel production (in ‘000 nt)

% Change

Week ended Mar 5th

Week ended Mar 12th

North East

199

206

+3.52

Great Lakes

631

656

+3.96

Southern

576

592

+2.78

Western

84

82

-2.38

Midwest

183

186

+1.64

The American Iron and Steel Institute (AISI) is an association of North American steel producers. AISI's member companies represent over three quarters of both U.S. and North American steel capacity.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
18 jam yang lalu
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
18 jam yang lalu
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
25 Sep 2026 08:02 (GMT+8)
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Baca Selengkapnya
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
Menjelang Festival Pertengahan Musim Gugur & Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada 2026? [Analisis SMM]
[SMM Analisis] Menjelang Festival Pertengahan Musim Gugur dan Hari Nasional, bagaimana pengaturan libur perusahaan baterai asam timbal pada tahun 2026? SMM, 25 September: Menurut pemberitahuan Kantor Umum Dewan Negara tentang pengaturan hari libur tahun 2026, libur Festival Pertengahan Musim Gugur tahun ini berlangsung dari 25 hingga 27 September, total 3 hari; libur Hari Nasional berlangsung dari 1 hingga 7 Oktober, total 7 hari......
25 Sep 2026 08:02 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Baca Selengkapnya
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
Bagaimana jadwal libur para pendaur ulang baterai bekas dan laju pembelian/penjualan selama libur ganda Festival Pertengahan Musim Gugur & Hari Nasional 2026? [Analisis SMM]
24 Sep 2026 21:07 (GMT+8)