India Aluminium Scrap prices stay flat; Aluminium Futures decline 1.55%

Telah Terbit: Mar 10, 2016 08:42 (GMT+8)
India major aluminium scrap commodities prices stayed flat on Tuesday.

INDIA March 09 2016 4:20 PM     

MUMBAI (Scrap Register): India  major aluminium scrap commodities prices stayed flat on Tuesday, while aluminium  futures prices at Multi Commodity Exchange settled lower as pressure seen after  rise in LME stocks and as China’s exports of aluminium reflected slow activities  at factories in the holiday month.

The major aluminium scrap commodities  stayed flat on Scrap Register Price Index as on Tuesday. India's major scrap  commodities like aluminium accessories scrap, aluminium ingots, aluminium rod  company, aluminium rod local, aluminium sheet cutting, aluminium utensil scrap  and aluminium wire scrap were remained flat on Tuesday.

The most active March aluminium contract on  Multi Commodity Exchange settled slightly up by 1.55% to Rs. 105.75 per kilogram  on Tuesday from previous close of Rs. 107.40 per kilogram. The MXC aluminium  prices touched an intra-day high of Rs. 108 per kilogram and an intra-day low of  Rs. 105.15 per kilogram during Tuesday.

Primary aluminium, alloy and  semi-finished aluminium products dived 26.3 percent from January to 280,000 tons  in February. Aluminium exports dropped 33.3 percent versus a year ago, in the  first two months, the outflow fell 22.3 percent year-on-year to 670,000  tons.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
3 jam yang lalu
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Baca Selengkapnya
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Vedanta Rencanakan Ekspansi $2,3 Miliar di India dan Arab Saudi, serta Percepat Pembukaan Kembali Smelter Tuticorin
Vedanta telah mengumumkan rencana investasi besar, di mana Vedanta Copper berencana menginvestasikan 2,3 miliar dolar AS di India dan Arab Saudi selama tiga hingga empat tahun ke depan, dengan target produksi tembaga tahunan lebih dari 1 juta ton pada 2030. Perusahaan ini bertujuan memproduksi 500.000 ton per tahun di India dan Arab Saudi, di samping produksi yang sudah berjalan sebesar 100.000 ton di Fujairah, UEA. Sekitar 2 miliar dolar AS akan diinvestasikan pada proyek penambangan, peleburan, dan batang tembaga di Arab Saudi, dengan keputusan investasi untuk usulan smelter tembaga Saudi diperkirakan akan diambil pada kuartal ini. Vedanta juga berupaya menghidupkan kembali smelter tembaga Tuticorin di India, yang telah ditutup sejak 2018. Perusahaan memperkirakan putusan pengadilan akan keluar dalam tiga bulan dan, jika disetujui, berencana menginvestasikan 250 juta dolar AS untuk merenovasi fasilitas tersebut, dengan target pengoperasian kembali dalam delapan hingga sembilan bulan dan produksi tembaga tahunan sebesar 250.000 ton. Sementara itu, fasilitas Silvassa beroperasi pada kapasitas sekitar 95%, dengan produksi katoda tembaga tahunan melebihi 245.000 ton.
3 jam yang lalu
London BTC tandai tembaga dan antimon di Nevada Black Star
5 jam yang lalu
London BTC tandai tembaga dan antimon di Nevada Black Star
Baca Selengkapnya
London BTC tandai tembaga dan antimon di Nevada Black Star
London BTC tandai tembaga dan antimon di Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) mengumumkan pada 5 Oktober 2026 hasil awal pXRF di lapangan dari proyek emas-mineral kritis Black Star di Pershing County, Nevada. Program perdana mengumpulkan 69 sampel chip batuan di sepanjang koridor 2,5 km antara target Western dan Eastern. Pembacaan pXRF menunjukkan antimon hingga 0,44% Sb, tembaga hingga 30,0% Cu, bismut hingga 0,73% Bi, dan perak hingga 811 ppm Ag, dengan asosiasi antimon-tembaga muncul di kedua ujung koridor. Tanda ini mencerminkan sampel historis tahun 1985 yang berjarak 120 m di selatan klaim (>1% Sb, 2% Cu, 700 ppm Ag). Pengambilan sampel uji tuntas sebelumnya menghasilkan hingga 16,23 g/t emas dan 50,5 g/t perak. Sampel kini berada di MSALABS untuk pengujian laboratorium, dengan geokimia multi-elemen lengkap termasuk antimon, tungsten, dan tembaga akan menyusul. Tembaga, sebagai kredit produk sampingan, menambah daya tarik strategis di bawah kebijakan mineral kritis AS, meskipun hasil masih merupakan pembacaan lapangan awal.
5 jam yang lalu
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
5 jam yang lalu
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
Baca Selengkapnya
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
Kantra Copper Perpanjangan Mineralisasi di Kedalaman Nugent Vein, Tambang Kanmantoo, Australia Selatan
Kantra Copper (ASX:KAN) mengumumkan hasil pengeboran intan di urat Nugent, Tambang Tembaga Kanmantoo: mineralisasi meluas 70 meter lebih dalam dari batas model sumber daya 2025 dan berjarak 370 meter dari level penambangan saat ini. Lubang utama 26KVUG0949 menemukan mineralisasi 70 meter mulai kedalaman 507 meter (1,18% tembaga, 0,24 g/t emas), termasuk interval 38 meter dengan kadar 1,46% tembaga dan 0,18 g/t emas. Nugent terletak di tepi barat daya badan bijih dengan kadar emas lebih tinggi. Hingga akhir Agustus, perusahaan telah menyelesaikan 38.535 meter pengeboran intan tahun ini (Nugent 12.024 meter); pembaruan sumber daya 2026 yang mencakup sekitar 80.000 meter pengeboran diperkirakan akan dirilis pada akhir Oktober. Kanmantoo adalah tambang yang beroperasi, memproduksi 3.170 ton tembaga pada kuartal Juni, dengan panduan 2026 sebesar 12.750–14.000 ton tembaga; perluasan ke kedalaman dapat memanfaatkan terowongan yang ada untuk ekspansi sumber daya dengan biaya modal rendah.
5 jam yang lalu