Augusta to end curbside recycling in May 2016

Telah Terbit: Dec 18, 2015 17:29 (GMT+8)
The Augusta City Council has decided to end curbside recycling service by May next year.

By  (ScrapMonster Author)

December 18, 2015 05:13:18 AM

AUGUSTA (Scrap Monster): The Augusta City Council has decided to end curbside recycling service by May next year. The vote on the proposal, which followed marathon debates, had resulted in a 4-4 tie. The order was finally approved through Mayor David Rollins’ veto vote.

According to the proposal, the City’s curbside collection of recyclables from residents will end as on May 1st. However, residents could still recycle by taking the items to any of the three existing single-stream recyclables drop-off locations at the Augusta City Center parking lot, the John Charest Public Works Facility and the Hatch Hill landfill. Meantime, the council has voted to add a fourth recyclables drop-off location at Buker Community Center, following complaints that the three existing locations are often found full. Also, rubbish collection will be expanded from the current 40 weeks to 52 weeks per year.

Official City statistics suggest that curbside collection of recyclables has witnessed significant downfall ever since the city began offering single-stream drop-off locations in March this year. The drop in volume of materials through curbside collection has led to huge jump in per-ton cost for the city. Estimates indicate that only nearly 12%-13% residents are currently using curbside collection services. Curbside recycling program collected 120 tons at a cost of $879 per ton during last year, as compared with single-stream recycling drop-off collection which totaled 160 tons at a lesser cost of $113 per ton.

Meantime, Public Works Director Lesley Jones clarified that the recycling program will run until May 1stor as long as the City’s recycling collection truck lasts, whichever is earlier. He further hoped that the truck will last until May. Councilmen decided not to make any spending on fixing the truck’s rusted body as it would require around $50,000. Meantime, some Councilmen have extended support to replace the current recycling program with a single-stream recyclables collection program, which is expected to add nearly $100,000 per year in costs than the current program.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
5 jam yang lalu
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
Baca Selengkapnya
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
Fundamental menunjukkan faktor bullish dan bearish, SHFE zinc berkonsolidasi di level tinggi [Ringkasan Futures Zinc SMM]
[Fundamental bullish dan bearish sama-sama ada, SHFE zinc konsolidasi di level tinggi] Kontrak SHFE zinc 2611 yang paling aktif dibuka pada 26.705 yuan/mt. Setelah pembukaan, SHFE zinc berkonsolidasi di sekitar rata-rata harian, menyentuh level tertinggi 26.775 yuan/mt selama sesi berlangsung, namun kemudian terkoreksi pada sore hari. SHFE zinc turun ke level terendah 26.580 yuan/mt mendekati penutupan, dan akhirnya ditutup melemah pada 26.580 yuan/mt, turun 95 yuan/mt, atau 0,36%. Volume perdagangan meningkat menjadi 62.064 lot.....
5 jam yang lalu
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
6 jam yang lalu
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
Baca Selengkapnya
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
Anak Perusahaan Western Mining Menerima Lisensi 17 Tahun untuk Tambang Polimetalik Qinghai
Pada 22 September, Western Mining mengumumkan bahwa anak perusahaannya yang sepenuhnya dimiliki, Qinghai Ganxin Mining Development Co., Ltd. (“Ganxin Mining”), baru-baru ini memperoleh Izin Usaha Pertambangan yang diterbitkan oleh Departemen Sumber Daya Alam Provinsi Qinghai. Tambang tersebut, bernama Tambang Polimetalik Besi Tuwenchahan Geermu milik Qinghai Ganxin Mining Development Co., Ltd., mencakup besi, tembaga, emas, molibdenum, seng, timbal, dan perak sebagai komoditas tambang yang diizinkan. Izin pertambangan ini berlaku mulai 3 Agustus 2026 hingga 30 Agustus 2043.
6 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (22 Sep)
6 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (22 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (22 Sep)
Data: Pergerakan pasar SHFE, DCE (22 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 22 Sep 2026.
6 jam yang lalu