More Zinc Mines Close in South China, with Concentrate TCs Facing Pressure

Telah Terbit: Dec 18, 2015 11:10 (GMT+8)
A growing number of small and medium zinc mines in South China slashed or suspended production due to falling zinc prices, tightening domestic zinc concentrate supplies in some regions.

SHANGHAI, Dec. 18 (SMM) - A growing number of small and medium zinc mines in South China slashed or suspended production due to falling zinc prices, tightening domestic zinc concentrate supplies in some regions. Some mines also hold back goods, so TCs of domestic zinc concentrate are expected to fall in some regions, SMM says.

Guosen Mining Co.’s 23,000-tpy (zinc content) zinc concentrate processing project will end trial production December 21, and come online in January 2016, SMM understands.

TCs of domestic zinc concentrate (50%) were stable at 5,300-5,500 yuan per tonne (zinc content) this past week, and those for imported zinc concentrate (50%) fell to $160-180 per dry metric tonne (DMT), with the low-end of $140-150.

Profit from imported ore fell 150 yuan to 360 yuan per tonne above domestic ore, SMM calculates. “North China-based zinc smelters required higher TCs of imported ore.  Smelters in South China, however, have weak negotiation power over pricing due to local ore tightness and strong demand for imported ore.”said an SMM zinc analyst. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
02 Oct 2026 10:52 (GMT+8)
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Baca Selengkapnya
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Sumber pasar melaporkan: South32 merevisi penawaran Premium CIF MJP Q4 '26 menjadi US$265/mt, turun dari US$325/mt. Berlaku hingga 5 Oktober 2026.
02 Oct 2026 10:52 (GMT+8)
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
01 Oct 2026 17:48 (GMT+8)
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Baca Selengkapnya
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Harga ADC 12 India tetap relatif stabil meskipun harga aluminium LME 3 bulan turun 1,2% antara 24 dan 30 September.
01 Oct 2026 17:48 (GMT+8)
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
01 Oct 2026 17:09 (GMT+8)
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Baca Selengkapnya
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto mengumumkan pada 1 Oktober bahwa mereka telah mencapai kesepakatan dengan Pemerintah Tasmania, Pemerintah Persemakmuran Australia, dan Hydro Tasmania untuk memperpanjang pasokan listrik ke smelter aluminium Bell Bay hingga akhir 2031. Kedua pemerintah juga akan memberikan paket dukungan gabungan sebesar A$200 juta selama lima tahun, masing-masing menyumbang A$100 juta. Ketentuan komersial dari perjanjian listrik tersebut tidak diungkapkan. Bell Bay memproduksi sekitar 190.000 ton aluminium primer per tahun, sementara kontrak listriknya yang ada akan berakhir pada akhir 2026. Kesepakatan ini menghilangkan ketidakpastian operasional langsung smelter tersebut. Bell Bay menjadi smelter aluminium besar ketiga di Australia yang menerima dukungan yang didukung pemerintah pada 2026, setelah Boyne dan Tomago, menyoroti tekanan berkelanjutan dari biaya listrik yang tinggi dan persaingan internasional.
01 Oct 2026 17:09 (GMT+8)