Ontario announces major revamp to e-waste recycling plan

Telah Terbit: Nov 30, 2015 10:00
According to an announcement by the Environment and Climate Change Minister Glen Murray, the eco fee will be eliminated from consumer bills.

By Paul Ploumis (ScrapMonster Author)

November 27, 2015 07:41:53 AM

TORONTO (Scrap Monster): The provincial administration has announced major change to its recycling program. According to the announcement, the eco fee will be eliminated from consumer bills. Instead, the product’s price tag by electronics device manufacturers will add a recycling fee. The move is aimed at boosting Ontario’s recycling rate which is presently one of the worst in the country.

According to sources within the Liberal government, the current program lacks incentives in order to ensure that manufacturers of electronic goods do the needful in recycling their products. The modification would mean lower prices for consumers. Instead of the cost being added to the consumer when purchasing the new device, the costs would be built into the price. It would no longer appear like tax on the receipt.

The eco fee or the environmental handling fee currently charged on devices varies from 75 cents for small items to as high as nearly $40 for larger devices. The fee, aimed to cover the eventual cost of refurbishing or recycling, is fixed by industry cartels. The drawback of the scheme is that consumers are forced to pay the fixed fee even if it costs less to recycle a particular product. Also, the fee has not helped in reducing waste.

The draft of the new proposal by Environment and Climate Change Minister Glen Murray encourages businesses to design long-lasting, reusable and easily recyclable products. The businesses will get ample time to adapt to the new reform, as it expects to be rolled out fully over the next two to four years.

Meantime, Progressive Conservative Leader Patrick Brown has expressed concern that eco charges will not be visible for Ontario shoppers. He noted that the proposal doesn’t eliminate the cost for consumers, but is just hiding it. Even if it’s hidden, it is still a tax, he added.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
11 jam yang lalu
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Baca Selengkapnya
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Pada 12 September pukul 9:58, tungku peleburan inti sistem pirometalurgi di proyek pemulihan multi-logam Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd. berhasil dinyalakan, secara resmi memasuki tahap pengeringan tungku dan menandai langkah kunci menuju commissioning dan produksi seluruh lini. Informasi publik menunjukkan bahwa proyek peningkatan teknologi pemulihan komprehensif bijih emas-perak polimetalik kompleks, relokasi, dan perluasan Yingkou Jianfa Shenghai menggunakan konsentrat tembaga sebagai bahan baku utama, dengan kapasitas terencana keseluruhan 600.000 ton/tahun katoda tembaga yang akan dibangun dalam dua fase, dengan kapasitas 300.000 ton/tahun per fase. Fase I dirancang untuk memproduksi 300.000 ton/tahun katoda tembaga dan 1,18 juta ton/tahun asam sulfat, beserta sistem pendukung untuk peleburan, konversi, pemurnian anoda, elektrolisis, benefisiasi terak, dan pemulihan logam mulia. Setelah penyalaan ini, proyek akan melaksanakan pengeringan tungku terstandarisasi dan uji coba terpadu kondisi panas di seluruh sistem untuk memverifikasi peralatan, instrumen, interlock, dan sistem kontrol otomatis. Proyek ini belum secara resmi memulai pengumpanan bahan baku dan produksi; setelah pengeringan tungku dan commissioning sistem selesai, akan dilanjutkan dengan commissioning kapasitas katoda tembaga 300.000 ton/tahun Fase I. Jika proyek berhasil mulai berproduksi, diharapkan dapat meningkatkan kapasitas peleburan tembaga di Tiongkok Utara dan semakin mendorong permintaan domestik akan bahan baku konsentrat tembaga.
11 jam yang lalu
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
12 Sep 2026 01:13
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Baca Selengkapnya
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Alchemy Resources Mulai Pengeboran Target Tembaga-Emas di Yellow Mountain
Alchemy Resources mengumumkan pada 11 September bahwa pengeboran sirkulasi balik telah dimulai di proyek Yellow Mountain dan Overflow di New South Wales, Australia, dengan hingga 15 lubang direncanakan selama kampanye eksplorasi terbaru. Di proyek Yellow Mountain yang 80% dimilikinya, pengeboran akan menguji perluasan mineralisasi tembaga-emas dan polimetalik yang telah diidentifikasi sebelumnya, serta dua target geofisika yang belum pernah dibor sebelumnya. Pengeboran sebelumnya di Yellow Mountain menghasilkan irisan sepanjang 113 meter dengan kadar setara tembaga 1,17%, terdiri dari 0,33% tembaga, 0,37 g/t emas, 24,3 g/t perak, 0,86% timbal, dan 1,23% seng. Kampanye pengeboran terbaru dirancang untuk menguji apakah sistem mineralisasi yang diketahui meluas ke area target yang baru diidentifikasi. Program ini juga akan mencakup pengeboran di proyek Overflow, di mana Alchemy menargetkan perluasan mineralisasi yang ada di sepanjang jurus dan di kedalaman. Overflow saat ini memiliki sumber daya mineral terindikasi sekitar 342.000 ons setara emas dan mengandung mineralisasi emas, perak, tembaga, timbal, dan seng. Dimulainya pengeboran memberikan uji jangka pendek terhadap skala dan kontinuitas mineralisasi di Yellow Mountain. Irisan tembaga-emas-polimetalik lebar yang dilaporkan sebelumnya menunjukkan potensi sistem mineralisasi yang cukup besar, sementara target geofisika yang baru ditetapkan memberikan potensi eksplorasi tambahan. Hasil pengeboran akan menjadi penting dalam menentukan apakah jejak mineralisasi dapat diperluas secara material.
12 Sep 2026 01:13
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
12 Sep 2026 01:10
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
Baca Selengkapnya
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
CEO Freeport Sinyalkan Kemungkinan Lanjutkan Ekspansi Tembaga Bagdad Senilai $4,5 Miliar
Chief Executive Officer Freeport-McMoRan Kathleen Quirk mengindikasikan bahwa perusahaan berharap dapat melanjutkan rencana perluasan tambang tembaga Bagdad di Arizona, menandakan komitmen yang lebih kuat terhadap proyek tersebut menjelang keputusan investasi formal. Berbicara di Jefferies Global Industrials Conference pada 10 September, Quirk mengatakan proyek tersebut masih memerlukan masukan dari dewan direksi Freeport, tetapi ia memperkirakan perusahaan akan melanjutkannya. Ia menggambarkan perluasan tersebut sebagai proyek konstruksi sekitar tiga tahun dan mencatat bahwa tidak ada hambatan perizinan besar yang diperkirakan. Estimasi proyek terbaru Freeport menempatkan belanja modal untuk perluasan Bagdad sekitar US$4,5 miliar, sekitar 30% di atas estimasi sebelumnya sebesar US$3,5 miliar, mencerminkan kenaikan biaya, perubahan lingkup, dan rekayasa tambahan. Proyek tersebut akan lebih dari dua kali lipat meningkatkan kapasitas konsentrator di Bagdad dan diperkirakan menambah sekitar 200–250 juta pon, atau sekitar 91.000–113.000 ton, produksi tembaga per tahun, bersama dengan tambahan 10–12 juta pon molibdenum. Bagdad saat ini memiliki umur cadangan lebih dari 80 tahun. Pengajuan regulasi Q2 2026 Freeport telah menggambarkan proyek tersebut sedang dipersiapkan untuk kemungkinan keputusan investasi pada paruh kedua 2026. Komentar terbaru ini dengan demikian merupakan sinyal yang lebih positif dari manajemen mengenai kemungkinan pengembangan, meskipun persetujuan dewan formal belum diumumkan. Keputusan untuk melanjutkan Bagdad akan menjadi salah satu investasi pertumbuhan tembaga jangka pendek Freeport yang paling signifikan di AS. Potensi penambahan lebih dari 90.000 ton tembaga per tahun akan meningkatkan output AS Freeport secara material, meskipun produksi pertama masih beberapa tahun lagi mengingat periode konstruksi yang diperkirakan. Perhatian kini akan beralih ke persetujuan dewan formal dan keputusan investasi akhir.
12 Sep 2026 01:10
Ontario announces major revamp to e-waste recycling plan - Shanghai Metals Market (SMM)