SMM Aluminum Market Daily Review (2015-11-2)

Telah Terbit: Nov 3, 2015 09:48
SHFE 1601 aluminum fell to RMB 10,285/mt after opening at RMB 10,360/mt on Monday.

SHANGHAI, Nov. 3 (SMM) –SHFE 1601 aluminum fell to RMB 10,285/mt after opening at RMB 10,360/mt on Monday. The most active contract ended down RMB 35/mt or 0.34% at RMB 10,315/mt. Trading volumes were down 35,296 lots to 156,000 lots, and positions were up 8,054to 273,000. Positions of SHFE aluminum index grew 2,966 to 613,000.  

In east China spot aluminum market, more smelters released goods into the market, adding to market supply. Prices were mainly between RMB 10,280-10,310/mt in Shanghai, discount of RMB 70-50/mt over SHFE 1511 aluminum, versus RMB 10,280-10,310/mt in Wuxi, and RMB 10,270-10,290/mt in Hangzhou. In the afternoon, only a few deals were done, with prices reported at RMB 10,280/mt. 

SMM’s latest survey of 25 large Chinese aluminum smelters, traders and processors reveals the following results:  

40% of them expect aluminum prices to stabilize this week: Total positions of all SHFE aluminum contracts showed signs of stabilizing after rising to 620,000, indicating that short selling has lost some steam. Shorts are cautious about entering, and so are longs, which will keep prices in tight ranges. 

Another 40% are bearish: LME aluminum will fall below USD 1,470/mt, and SHFE 1601 aluminum contract will fall below RMB 10,250/mt, citing a series of negative factors. 1. Falling power costs and subsidies from local governments will weigh on prices. 2. The scale of production cuts is smaller than expected. Commissioning of new capacity will leave supply still high. 3. Consumption has softened. 

The rest 20% are bullish: LME aluminum will return above USD 1,490/mt, and SHFE 1601 aluminum contract will rebound above RMB 10,400/mt. Total positions of all SHFE aluminum contract have risen to more than 620,000, many of which are short positions. Shorts are likely to exit this week. Aluminum prices should upward correction after continuous dramatic declines. 




Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Logam Mulia Ekspres]
3 jam yang lalu
[SMM Logam Mulia Ekspres]
Baca Selengkapnya
[SMM Logam Mulia Ekspres]
[SMM Logam Mulia Ekspres]
Implats sedang menilai ulang nilai strategis proyek PGM Waterberg miliknya. Manajemen perusahaan baru-baru ini menyatakan bahwa rencana Waterberg yang direvisi, setelah pengurangan skala dan optimalisasi biaya modal, lebih menarik dibandingkan versi sebelumnya, dan proyek tersebut telah kembali masuk ke jalur pertumbuhan masa depan grup. Perkembangan ini juga mencerminkan kenyataan yang semakin mendesak bagi industri PGM Afrika Selatan: proyek yang mampu menghasilkan output tambahan dengan risiko lebih rendah dan intensitas modal yang wajar semakin langka.
3 jam yang lalu
[SMM Logam Mulia Ekspres]
3 jam yang lalu
[SMM Logam Mulia Ekspres]
Baca Selengkapnya
[SMM Logam Mulia Ekspres]
[SMM Logam Mulia Ekspres]
Proyek hidrogen hijau besar di Afrika Selatan telah mengambil langkah penting lainnya. Hive Hydrogen South Africa mengumumkan pada 15 September bahwa mereka secara resmi memberikan kontrak desain rekayasa front-end (FEED) untuk proyek hidrogen hijau dan amonia hijau senilai sekitar 5,8 miliar dolar AS kepada perusahaan rekayasa Spanyol Técnicas Reunidas. Proyek yang kini berada pada tahap pengembangan akhir ini dianggap sebagai inisiatif hidrogen hijau unggulan di Afrika Selatan dan salah satu proyek percontohan utama di bawah program Global Gateway Uni Eropa di negara tersebut.
3 jam yang lalu
[SMM Logam Mulia Ekspres]
4 jam yang lalu
[SMM Logam Mulia Ekspres]
Baca Selengkapnya
[SMM Logam Mulia Ekspres]
[SMM Logam Mulia Ekspres]
Valterra Platinum menyatakan bahwa tambang PGM Mogalakwena di Limpopo, Afrika Selatan, memiliki basis sumber daya jangka panjang yang sangat besar. Kepala Eksekutif Operasi Pertambangan mencatat dalam pengarahan media rantai nilai bahwa Mogalakwena memiliki sekitar 285 juta ons sumber daya berdasarkan empat elemen (4E). Berdasarkan target produksi tahunan enam elemen (6E) perusahaan saat ini sebesar 900.000 hingga 1 juta ons, potensi umur sumber daya tambang tersebut dapat melampaui 300 tahun.
4 jam yang lalu