India reviews revival of mining operations at abandoned gold mine

Telah Terbit: Sep 14, 2015 20:29
The Indian Mines Ministry is reportedly exploring all possible options to restart gold mining operation at the abandoned Kolar Gold Fields in the southern state of Karnataka.

By  Paul Ploumis 14 Sep 2015  Last updated at  08:33:49 GMT

NEW DELHI (Scrap Monster): The Indian Mines Ministry is reportedly exploring all possible options to restart gold mining operation at the abandoned Kolar Gold Fields in the southern state of Karnataka.

According to the Balvinder Kumar, Union Mines Secretary, the Mines Ministry plans to forward a proposal before the union cabinet within a month to revive some of the oldest and deepest mines in the country. The Ministry plans to float global tenders to extract gold from not only the mines, but also from dumps of waste soil from these mines spread over a wide area. The Ministry expects that the proposed mining operations could be able to extract gold worth more than Rs 25,000 crore. Incidentally, the latest assessment report had hinted at huge quantities of extractable gold in the mine areas.

The Ministry believes that revival of mining operations may contribute significantly to the country’s economy by cutting its rising gold import bill. The country had imported around 800 tonnes last fiscal. The latest Gold Demand Trends Report released by the World Gold council (WGC) predicts the gold demand to range between 900 tonnes and 1,000 tonnes during current fiscal.

Started by a British firm in 1880, Kolar Gold Fields under the ownership of Bharat Gold Mines Limited (BGML), was closed down in the year 2001, after the company declared that heavy extraction for a long period has lead to the exhaustion of gold ore reserves in the mines. Nearly 800 tonnes of gold was extracted from these mines. The closure followed the company’s assessment that mining the remaining reserves would run up in losses. The decision left nearly 3,100 jobless.

The Karnataka State High Court had earlier in its ruling directed the Indian government to take responsibility of reviving the abandoned mine. Later, the Supreme Court had allowed Central government to float global tenders to revive mining operations at the mine. However, the Bharat Gold Mines Employees Union (BGMEU) demanded that all the 3100 around workers who lost their jobs in 2001 must still be treated as employees when mining restarts.

The Kolar Gold Fields, 110 kilometres away from the City of Bangalore is believed to be one of the largest gold reserves that has more than 200 tons of the precious metal in its depths.


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Persediaan Aluminium LME Tetap di 246.700 mt, Turun 6,68% Sepanjang Bulan
3 jam yang lalu
Persediaan Aluminium LME Tetap di 246.700 mt, Turun 6,68% Sepanjang Bulan
Baca Selengkapnya
Persediaan Aluminium LME Tetap di 246.700 mt, Turun 6,68% Sepanjang Bulan
Persediaan Aluminium LME Tetap di 246.700 mt, Turun 6,68% Sepanjang Bulan
[SMM Kilat Aluminium] Pada 1 September, inventaris aluminium LME tercatat 246.700 mt, tidak berubah dari hari sebelumnya. Selama seminggu terakhir, inventaris aluminium LME turun 100 mt, penurunan 0,04%. Selama sebulan terakhir, inventaris aluminium LME turun 17.700 mt, penurunan 6,68%.
3 jam yang lalu
Waran Berjangka Aluminium SHFE Turun 9,20% dalam Seminggu, 25,56% dalam Sebulan
3 jam yang lalu
Waran Berjangka Aluminium SHFE Turun 9,20% dalam Seminggu, 25,56% dalam Sebulan
Baca Selengkapnya
Waran Berjangka Aluminium SHFE Turun 9,20% dalam Seminggu, 25,56% dalam Sebulan
Waran Berjangka Aluminium SHFE Turun 9,20% dalam Seminggu, 25,56% dalam Sebulan
[SMM Kilasan Aluminium] Pada 1 September, waran berjangka aluminium SHFE tercatat 238.373 mt, turun 3.321 mt dari hari perdagangan sebelumnya. Selama seminggu terakhir, waran berjangka aluminium SHFE turun 24.141 mt, penurunan 9,20%. Selama sebulan terakhir, waran berjangka aluminium SHFE turun 81.851 mt, penurunan 25,56%.
3 jam yang lalu
Pasokan aluminium rod masih berlebih, biaya pemrosesan tetap stabil di level rendah, perhatikan laju pemulihan permintaan [Analisis SMM]
3 jam yang lalu
Pasokan aluminium rod masih berlebih, biaya pemrosesan tetap stabil di level rendah, perhatikan laju pemulihan permintaan [Analisis SMM]
Baca Selengkapnya
Pasokan aluminium rod masih berlebih, biaya pemrosesan tetap stabil di level rendah, perhatikan laju pemulihan permintaan [Analisis SMM]
Pasokan aluminium rod masih berlebih, biaya pemrosesan tetap stabil di level rendah, perhatikan laju pemulihan permintaan [Analisis SMM]
Menurut statistik SMM, per 28 Agustus, hari persediaan di pabrik batang aluminium Tiongkok tercatat 8,1 hari, turun 0,46 hari WoW dari 8,56 hari pada 21 Agustus. Rasio persediaan turun dari 110,10% menjadi 105,14%, turun 4,96 poin persentase, dengan tingkat persediaan absolut masih berada di kisaran lebih tinggi untuk tahun ini. Pada periode yang sama, tingkat operasi gabungan di perusahaan batang aluminium terkemuka tercatat 72,96%, datar WoW, stabil setelah empat minggu berturut-turut mengalami penurunan.
3 jam yang lalu
India reviews revival of mining operations at abandoned gold mine - Shanghai Metals Market (SMM)