SMM Lead Market Daily Review (2015-8-27)

Telah Terbit: Aug 28, 2015 08:42
SHFE 1510 lead gapped lower at RMB 13,145/mt for night trading Wednesday and then ranged between RMB 13,115-13,275/mt.

SHANGHAI, Aug. 28 (SMM) –SHFE 1510 lead gapped lower at RMB 13,145/mt for night trading Wednesday and then ranged between RMB 13,115-13,275/mt, to close at RMB 13,190/mt, losing RMB 110/mt. Trading volumes declined 4,416 to 2,810 lots and positions also dropped 84 to 17,234.

The most actively trade contract broke out above RMB 13,300/mt during Thursday trading session as iron ore, rebar and rubber futures prices grew quickly after the open. Then the contract ranged between RMB 13,260-13,300/mt and increased near session’s end responding to a rise in Chinese stock market, to close at RMB 13,355/mt, up RMB 55/mt. Trading volumes were about 6,356 lots while positions decreased 634 to 16,684 with shorts exiting market.

SMM/LME lead price ratio already stands above 8, but expectation for more depreciation in yuan exists and less lead imports flow into China. SHFE 1510 lead does not suffer sell-offs. As such, SHFE 1510 lead should test resistance at RMB 13,350/mt in short term.

On Thursday, mainstream traded prices were RMB 13,350/mt for Chengyuan brand in Shanghai, RMB 50/mt higher than SHFE 1510 lead, versus RMB 13,340/mt for Hanjiang and Humon brands.

Less shipment arrived and thus lead smelters moved few goods. Only West Mining shipped goods out. Spot premiums narrowed. Trades were active in buying as hedged goods were hard to flow into market. Supply shortage put a brake on trades. Downstream consumption remained slack late this month. Trades were thus left light. 


Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Kilat Logam Mulia]
14 jam yang lalu
[SMM Kilat Logam Mulia]
Baca Selengkapnya
[SMM Kilat Logam Mulia]
[SMM Kilat Logam Mulia]
Kingsrose Mining asal Australia menyatakan pada 15 September bahwa proses perizinan untuk Area 6 Proyek Penikat Platinum Group Elements di Finlandia masih berlangsung. Dengan persetujuan regulator dan tanpa banding, perusahaan menargetkan untuk memulai pengeboran pada Januari 2027. Target eksplorasi yang diusulkan untuk Area 6 adalah 21 hingga 32 juta ton dengan kadar rata-rata 6E sebesar 4–7,4 g/t. Rangkaian logam tersebut meliputi platinum, paladium, rhodium, iridium, rutenium, dan emas, setara dengan sekitar 2,8 hingga 7,7 juta ons logam 6E.
14 jam yang lalu
[SMM Logam Mulia Ekspres]
14 jam yang lalu
[SMM Logam Mulia Ekspres]
Baca Selengkapnya
[SMM Logam Mulia Ekspres]
[SMM Logam Mulia Ekspres]
Perusahaan tambang tembaga dan paladium asal Kanada yang sedang berkembang, Generation Mining, telah memperoleh investasi sekitar USD 140 juta dari Canada Growth Fund (CGF). Dana tersebut akan mendukung pengembangan proyek tembaga-paladium Marathon di Ontario hingga keputusan investasi final dan konstruksi selanjutnya. Investasi ini menunjukkan bahwa pemerintah Kanada memanfaatkan modal publik untuk memobilisasi dana swasta, mempercepat pengembangan proyek mineral kritis, dan memperkuat rantai pasokan logam kritis domestik Amerika Utara.
14 jam yang lalu
[SMM Kilat Logam Mulia]
15 jam yang lalu
[SMM Kilat Logam Mulia]
Baca Selengkapnya
[SMM Kilat Logam Mulia]
[SMM Kilat Logam Mulia]
Podium Minerals Australia mengumumkan pada 14 September bahwa pihaknya telah menandatangani nota kesepahaman yang tidak mengikat dengan PGM Processing yang berbasis di AS. Rencananya adalah menghubungkan proyek Parks Reef di Australia Barat dengan kapasitas pemrosesan midstream, hilir, dan daur ulang sekunder di AS, membangun rantai pasokan PGM terintegrasi Australia-AS.
15 jam yang lalu